Evaluation of construction methods and performance for high rise public housing construction in Hong Kong

Time, cost and resource usage are some of the most important production performance issues in the construction industry. This paper investigates the impact of using different construction methods or techniques on production performance in the context of high-rise public housing construction in Hong...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Building and environment 2002-10, Vol.37 (10), p.983-991
Hauptverfasser: Tam, C.M, Deng, Z.M, Zeng, S.X
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 991
container_issue 10
container_start_page 983
container_title Building and environment
container_volume 37
creator Tam, C.M
Deng, Z.M
Zeng, S.X
description Time, cost and resource usage are some of the most important production performance issues in the construction industry. This paper investigates the impact of using different construction methods or techniques on production performance in the context of high-rise public housing construction in Hong Kong. Three different construction schemes with the same standard “Harmony” design were investigated. These schemes differ in the floor slab construction methods and the material handling plant input. Cycle duration, labour resource usage and costs in three schemes are analysed and examined. The findings have revealed that Scheme 2 with a six-day floor cycle duration is the most economical option on the basis of manpower and cost. However, Scheme 3 with four-day floor cycle duration is the preferred option because the speed of construction is of paramount importance in Hong Kong.
doi_str_mv 10.1016/S0360-1323(01)00081-6
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_27781074</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0360132301000816</els_id><sourcerecordid>27781074</sourcerecordid><originalsourceid>FETCH-LOGICAL-c338t-506af702423d334f4649d50e1bf02518e3676a2b3f0e1205be7b28514e2dd04e3</originalsourceid><addsrcrecordid>eNqFkEtLxDAUhYMoOD5-gpCV6KJ682jaWYkM4wMFFyq4C2l6OxNpmzFpBf-9mRkRXLlJcg_nHG4-Qk4YXDBg6vIZhIKMCS7OgJ0DQMkytUMmrCxEpkr5tksmv5Z9chDjO6TcVMgJcfNP045mcL6nvqHW93EIo93MHQ5LX0dq-pquMDQ-dKa3SNODLt1iSYOLSFdj1TpLl36Mrl_8bXA9vfNJfEjHEdlrTBvx-Oc-JK8385fZXfb4dHs_u37MrBDlkOWgTFMAl1zUQshGKjmtc0BWNcBzVqJQhTK8Ek3SOOQVFhUvcyaR1zVIFIfkdNu7Cv5jxDjozkWLbWt6TDtqXhQlg0ImY7412uBjDNjoVXCdCV-agV6D1Ruwek1NA9MbsFql3NU2h-kXnw6DjtZhAlO7gHbQtXf_NHwD7qmAwQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>27781074</pqid></control><display><type>article</type><title>Evaluation of construction methods and performance for high rise public housing construction in Hong Kong</title><source>Elsevier ScienceDirect Journals</source><creator>Tam, C.M ; Deng, Z.M ; Zeng, S.X</creator><creatorcontrib>Tam, C.M ; Deng, Z.M ; Zeng, S.X</creatorcontrib><description>Time, cost and resource usage are some of the most important production performance issues in the construction industry. This paper investigates the impact of using different construction methods or techniques on production performance in the context of high-rise public housing construction in Hong Kong. Three different construction schemes with the same standard “Harmony” design were investigated. These schemes differ in the floor slab construction methods and the material handling plant input. Cycle duration, labour resource usage and costs in three schemes are analysed and examined. The findings have revealed that Scheme 2 with a six-day floor cycle duration is the most economical option on the basis of manpower and cost. However, Scheme 3 with four-day floor cycle duration is the preferred option because the speed of construction is of paramount importance in Hong Kong.</description><identifier>ISSN: 0360-1323</identifier><identifier>EISSN: 1873-684X</identifier><identifier>DOI: 10.1016/S0360-1323(01)00081-6</identifier><language>eng</language><publisher>Elsevier Ltd</publisher><subject>Construction methods ; Hong Kong ; Production performance ; Public housing construction ; Time and cost</subject><ispartof>Building and environment, 2002-10, Vol.37 (10), p.983-991</ispartof><rights>2002 Elsevier Science Ltd</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c338t-506af702423d334f4649d50e1bf02518e3676a2b3f0e1205be7b28514e2dd04e3</citedby><cites>FETCH-LOGICAL-c338t-506af702423d334f4649d50e1bf02518e3676a2b3f0e1205be7b28514e2dd04e3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0360132301000816$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Tam, C.M</creatorcontrib><creatorcontrib>Deng, Z.M</creatorcontrib><creatorcontrib>Zeng, S.X</creatorcontrib><title>Evaluation of construction methods and performance for high rise public housing construction in Hong Kong</title><title>Building and environment</title><description>Time, cost and resource usage are some of the most important production performance issues in the construction industry. This paper investigates the impact of using different construction methods or techniques on production performance in the context of high-rise public housing construction in Hong Kong. Three different construction schemes with the same standard “Harmony” design were investigated. These schemes differ in the floor slab construction methods and the material handling plant input. Cycle duration, labour resource usage and costs in three schemes are analysed and examined. The findings have revealed that Scheme 2 with a six-day floor cycle duration is the most economical option on the basis of manpower and cost. However, Scheme 3 with four-day floor cycle duration is the preferred option because the speed of construction is of paramount importance in Hong Kong.</description><subject>Construction methods</subject><subject>Hong Kong</subject><subject>Production performance</subject><subject>Public housing construction</subject><subject>Time and cost</subject><issn>0360-1323</issn><issn>1873-684X</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2002</creationdate><recordtype>article</recordtype><recordid>eNqFkEtLxDAUhYMoOD5-gpCV6KJ682jaWYkM4wMFFyq4C2l6OxNpmzFpBf-9mRkRXLlJcg_nHG4-Qk4YXDBg6vIZhIKMCS7OgJ0DQMkytUMmrCxEpkr5tksmv5Z9chDjO6TcVMgJcfNP045mcL6nvqHW93EIo93MHQ5LX0dq-pquMDQ-dKa3SNODLt1iSYOLSFdj1TpLl36Mrl_8bXA9vfNJfEjHEdlrTBvx-Oc-JK8385fZXfb4dHs_u37MrBDlkOWgTFMAl1zUQshGKjmtc0BWNcBzVqJQhTK8Ek3SOOQVFhUvcyaR1zVIFIfkdNu7Cv5jxDjozkWLbWt6TDtqXhQlg0ImY7412uBjDNjoVXCdCV-agV6D1Ruwek1NA9MbsFql3NU2h-kXnw6DjtZhAlO7gHbQtXf_NHwD7qmAwQ</recordid><startdate>20021001</startdate><enddate>20021001</enddate><creator>Tam, C.M</creator><creator>Deng, Z.M</creator><creator>Zeng, S.X</creator><general>Elsevier Ltd</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20021001</creationdate><title>Evaluation of construction methods and performance for high rise public housing construction in Hong Kong</title><author>Tam, C.M ; Deng, Z.M ; Zeng, S.X</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c338t-506af702423d334f4649d50e1bf02518e3676a2b3f0e1205be7b28514e2dd04e3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2002</creationdate><topic>Construction methods</topic><topic>Hong Kong</topic><topic>Production performance</topic><topic>Public housing construction</topic><topic>Time and cost</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Tam, C.M</creatorcontrib><creatorcontrib>Deng, Z.M</creatorcontrib><creatorcontrib>Zeng, S.X</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology &amp; Engineering</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Building and environment</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Tam, C.M</au><au>Deng, Z.M</au><au>Zeng, S.X</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Evaluation of construction methods and performance for high rise public housing construction in Hong Kong</atitle><jtitle>Building and environment</jtitle><date>2002-10-01</date><risdate>2002</risdate><volume>37</volume><issue>10</issue><spage>983</spage><epage>991</epage><pages>983-991</pages><issn>0360-1323</issn><eissn>1873-684X</eissn><abstract>Time, cost and resource usage are some of the most important production performance issues in the construction industry. This paper investigates the impact of using different construction methods or techniques on production performance in the context of high-rise public housing construction in Hong Kong. Three different construction schemes with the same standard “Harmony” design were investigated. These schemes differ in the floor slab construction methods and the material handling plant input. Cycle duration, labour resource usage and costs in three schemes are analysed and examined. The findings have revealed that Scheme 2 with a six-day floor cycle duration is the most economical option on the basis of manpower and cost. However, Scheme 3 with four-day floor cycle duration is the preferred option because the speed of construction is of paramount importance in Hong Kong.</abstract><pub>Elsevier Ltd</pub><doi>10.1016/S0360-1323(01)00081-6</doi><tpages>9</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0360-1323
ispartof Building and environment, 2002-10, Vol.37 (10), p.983-991
issn 0360-1323
1873-684X
language eng
recordid cdi_proquest_miscellaneous_27781074
source Elsevier ScienceDirect Journals
subjects Construction methods
Hong Kong
Production performance
Public housing construction
Time and cost
title Evaluation of construction methods and performance for high rise public housing construction in Hong Kong
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T13%3A29%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Evaluation%20of%20construction%20methods%20and%20performance%20for%20high%20rise%20public%20housing%20construction%20in%20Hong%20Kong&rft.jtitle=Building%20and%20environment&rft.au=Tam,%20C.M&rft.date=2002-10-01&rft.volume=37&rft.issue=10&rft.spage=983&rft.epage=991&rft.pages=983-991&rft.issn=0360-1323&rft.eissn=1873-684X&rft_id=info:doi/10.1016/S0360-1323(01)00081-6&rft_dat=%3Cproquest_cross%3E27781074%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=27781074&rft_id=info:pmid/&rft_els_id=S0360132301000816&rfr_iscdi=true