Situational Reengineering: Case Study Analysis

Owners and contractors faced with the drastic consequences of a "crisis" often accomplish projects whose short schedules, tight budgets, or technical complexity require adoption of extraordinary approaches to design and construction. Crisis or "exceptional" projects occur for man...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 2000-05, Vol.126 (3), p.185-190
Hauptverfasser: Songer, Anthony D, Diekmann, James, Hendrickson, William, Flushing, David
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 190
container_issue 3
container_start_page 185
container_title Journal of construction engineering and management
container_volume 126
creator Songer, Anthony D
Diekmann, James
Hendrickson, William
Flushing, David
description Owners and contractors faced with the drastic consequences of a "crisis" often accomplish projects whose short schedules, tight budgets, or technical complexity require adoption of extraordinary approaches to design and construction. Crisis or "exceptional" projects occur for many reasons; industrial accidents or acts of God cause damage to crucial manufacturing capacity or changes in the economy or international markets require a rapid product to market cycle. Often, these crisis projects are completed in record time, with superior quality or within a very low budget. It is also common on exceptional projects for strategies that are designed to (say) reduce schedule, to exhibit collateral beneficial impacts on the project's cost or quality. The research reported herein, investigates 30 exceptional projects to identify and document work process changes and their impact on cost and schedule as compared to traditional projects of similar scope and complexity. Results illustrate that changing work processes and providing appropriate cultural environments can result in significant schedule reduction (35%) with no increase in project costs. Additionally, over half of the exceptional projects studied demonstrate a reduction in cost as well as a reduced schedule. Fundamentally, this paper demonstrates the efficacy of ingenious and innovative changes to existing work paradigms in response to a variety of situational requirements. Additionally, this paper includes a discussion of barriers to implementation and organizational issues surrounding situational reengineering.
doi_str_mv 10.1061/(ASCE)0733-9364(2000)126:3(185)
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_27760275</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>27760275</sourcerecordid><originalsourceid>FETCH-LOGICAL-a341t-d05e390b527350f533e53451618adfd679d57f40b44a206d5802fb8f63d2775f3</originalsourceid><addsrcrecordid>eNp9kE1Lw0AQhhdRsFb_Qw6i7SF19jvpQSixflERrIK3ZdvslpQ00d3k0H_vxla9OZcd2Id3Zh6ELjGMMAh8NZjMs-kQJKVxSgUbEAAYYiLGdIATPjxAPZwyGstEkEPU--WO0Yn3awDMRMp7aDQvmlY3RV3pMnoxploVlTGuqFbjKNPeRPOmzbfRJHxvfeFP0ZHVpTdn-7eP3m6nr9l9PHu-e8gms1hThps4B25oCgtOJOVgOaWGU8axwInObS5kmnNpGSwY0wREzhMgdpFYQXMiJbe0jy52uR-u_myNb9Sm8EtTlroydetVoAQQyQN4vQOXrvbeGas-XLHRbqswqM6TUp0n1d2vuvtV50kFT4qq4CkEnO8nab_UpXW6Whb-L4UKSTgO2PsOC5RR67p1wYhXj9n06YaFxBAIXdGuT_h3j39W-H-DL2WZfoE</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>27760275</pqid></control><display><type>article</type><title>Situational Reengineering: Case Study Analysis</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><source>EBSCOhost Business Source Complete</source><creator>Songer, Anthony D ; Diekmann, James ; Hendrickson, William ; Flushing, David</creator><creatorcontrib>Songer, Anthony D ; Diekmann, James ; Hendrickson, William ; Flushing, David</creatorcontrib><description>Owners and contractors faced with the drastic consequences of a "crisis" often accomplish projects whose short schedules, tight budgets, or technical complexity require adoption of extraordinary approaches to design and construction. Crisis or "exceptional" projects occur for many reasons; industrial accidents or acts of God cause damage to crucial manufacturing capacity or changes in the economy or international markets require a rapid product to market cycle. Often, these crisis projects are completed in record time, with superior quality or within a very low budget. It is also common on exceptional projects for strategies that are designed to (say) reduce schedule, to exhibit collateral beneficial impacts on the project's cost or quality. The research reported herein, investigates 30 exceptional projects to identify and document work process changes and their impact on cost and schedule as compared to traditional projects of similar scope and complexity. Results illustrate that changing work processes and providing appropriate cultural environments can result in significant schedule reduction (35%) with no increase in project costs. Additionally, over half of the exceptional projects studied demonstrate a reduction in cost as well as a reduced schedule. Fundamentally, this paper demonstrates the efficacy of ingenious and innovative changes to existing work paradigms in response to a variety of situational requirements. Additionally, this paper includes a discussion of barriers to implementation and organizational issues surrounding situational reengineering.</description><identifier>ISSN: 0733-9364</identifier><identifier>EISSN: 1943-7862</identifier><identifier>DOI: 10.1061/(ASCE)0733-9364(2000)126:3(185)</identifier><identifier>CODEN: JCEMD4</identifier><language>eng</language><publisher>Reston, VA: American Society of Civil Engineers</publisher><subject>Applied sciences ; Building economics. Cost ; Buildings. Public works ; Exact sciences and technology ; Project management. Process of design ; TECHNICAL PAPERS</subject><ispartof>Journal of construction engineering and management, 2000-05, Vol.126 (3), p.185-190</ispartof><rights>2000 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a341t-d05e390b527350f533e53451618adfd679d57f40b44a206d5802fb8f63d2775f3</citedby><cites>FETCH-LOGICAL-a341t-d05e390b527350f533e53451618adfd679d57f40b44a206d5802fb8f63d2775f3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)0733-9364(2000)126:3(185)$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(2000)126:3(185)$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,76193,76201</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&amp;idt=1367251$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Songer, Anthony D</creatorcontrib><creatorcontrib>Diekmann, James</creatorcontrib><creatorcontrib>Hendrickson, William</creatorcontrib><creatorcontrib>Flushing, David</creatorcontrib><title>Situational Reengineering: Case Study Analysis</title><title>Journal of construction engineering and management</title><description>Owners and contractors faced with the drastic consequences of a "crisis" often accomplish projects whose short schedules, tight budgets, or technical complexity require adoption of extraordinary approaches to design and construction. Crisis or "exceptional" projects occur for many reasons; industrial accidents or acts of God cause damage to crucial manufacturing capacity or changes in the economy or international markets require a rapid product to market cycle. Often, these crisis projects are completed in record time, with superior quality or within a very low budget. It is also common on exceptional projects for strategies that are designed to (say) reduce schedule, to exhibit collateral beneficial impacts on the project's cost or quality. The research reported herein, investigates 30 exceptional projects to identify and document work process changes and their impact on cost and schedule as compared to traditional projects of similar scope and complexity. Results illustrate that changing work processes and providing appropriate cultural environments can result in significant schedule reduction (35%) with no increase in project costs. Additionally, over half of the exceptional projects studied demonstrate a reduction in cost as well as a reduced schedule. Fundamentally, this paper demonstrates the efficacy of ingenious and innovative changes to existing work paradigms in response to a variety of situational requirements. Additionally, this paper includes a discussion of barriers to implementation and organizational issues surrounding situational reengineering.</description><subject>Applied sciences</subject><subject>Building economics. Cost</subject><subject>Buildings. Public works</subject><subject>Exact sciences and technology</subject><subject>Project management. Process of design</subject><subject>TECHNICAL PAPERS</subject><issn>0733-9364</issn><issn>1943-7862</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2000</creationdate><recordtype>article</recordtype><recordid>eNp9kE1Lw0AQhhdRsFb_Qw6i7SF19jvpQSixflERrIK3ZdvslpQ00d3k0H_vxla9OZcd2Id3Zh6ELjGMMAh8NZjMs-kQJKVxSgUbEAAYYiLGdIATPjxAPZwyGstEkEPU--WO0Yn3awDMRMp7aDQvmlY3RV3pMnoxploVlTGuqFbjKNPeRPOmzbfRJHxvfeFP0ZHVpTdn-7eP3m6nr9l9PHu-e8gms1hThps4B25oCgtOJOVgOaWGU8axwInObS5kmnNpGSwY0wREzhMgdpFYQXMiJbe0jy52uR-u_myNb9Sm8EtTlroydetVoAQQyQN4vQOXrvbeGas-XLHRbqswqM6TUp0n1d2vuvtV50kFT4qq4CkEnO8nab_UpXW6Whb-L4UKSTgO2PsOC5RR67p1wYhXj9n06YaFxBAIXdGuT_h3j39W-H-DL2WZfoE</recordid><startdate>20000501</startdate><enddate>20000501</enddate><creator>Songer, Anthony D</creator><creator>Diekmann, James</creator><creator>Hendrickson, William</creator><creator>Flushing, David</creator><general>American Society of Civil Engineers</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20000501</creationdate><title>Situational Reengineering: Case Study Analysis</title><author>Songer, Anthony D ; Diekmann, James ; Hendrickson, William ; Flushing, David</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a341t-d05e390b527350f533e53451618adfd679d57f40b44a206d5802fb8f63d2775f3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2000</creationdate><topic>Applied sciences</topic><topic>Building economics. Cost</topic><topic>Buildings. Public works</topic><topic>Exact sciences and technology</topic><topic>Project management. Process of design</topic><topic>TECHNICAL PAPERS</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Songer, Anthony D</creatorcontrib><creatorcontrib>Diekmann, James</creatorcontrib><creatorcontrib>Hendrickson, William</creatorcontrib><creatorcontrib>Flushing, David</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of construction engineering and management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Songer, Anthony D</au><au>Diekmann, James</au><au>Hendrickson, William</au><au>Flushing, David</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Situational Reengineering: Case Study Analysis</atitle><jtitle>Journal of construction engineering and management</jtitle><date>2000-05-01</date><risdate>2000</risdate><volume>126</volume><issue>3</issue><spage>185</spage><epage>190</epage><pages>185-190</pages><issn>0733-9364</issn><eissn>1943-7862</eissn><coden>JCEMD4</coden><abstract>Owners and contractors faced with the drastic consequences of a "crisis" often accomplish projects whose short schedules, tight budgets, or technical complexity require adoption of extraordinary approaches to design and construction. Crisis or "exceptional" projects occur for many reasons; industrial accidents or acts of God cause damage to crucial manufacturing capacity or changes in the economy or international markets require a rapid product to market cycle. Often, these crisis projects are completed in record time, with superior quality or within a very low budget. It is also common on exceptional projects for strategies that are designed to (say) reduce schedule, to exhibit collateral beneficial impacts on the project's cost or quality. The research reported herein, investigates 30 exceptional projects to identify and document work process changes and their impact on cost and schedule as compared to traditional projects of similar scope and complexity. Results illustrate that changing work processes and providing appropriate cultural environments can result in significant schedule reduction (35%) with no increase in project costs. Additionally, over half of the exceptional projects studied demonstrate a reduction in cost as well as a reduced schedule. Fundamentally, this paper demonstrates the efficacy of ingenious and innovative changes to existing work paradigms in response to a variety of situational requirements. Additionally, this paper includes a discussion of barriers to implementation and organizational issues surrounding situational reengineering.</abstract><cop>Reston, VA</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)0733-9364(2000)126:3(185)</doi><tpages>6</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0733-9364
ispartof Journal of construction engineering and management, 2000-05, Vol.126 (3), p.185-190
issn 0733-9364
1943-7862
language eng
recordid cdi_proquest_miscellaneous_27760275
source American Society of Civil Engineers:NESLI2:Journals:2014; EBSCOhost Business Source Complete
subjects Applied sciences
Building economics. Cost
Buildings. Public works
Exact sciences and technology
Project management. Process of design
TECHNICAL PAPERS
title Situational Reengineering: Case Study Analysis
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T13%3A07%3A23IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Situational%20Reengineering:%20Case%20Study%20Analysis&rft.jtitle=Journal%20of%20construction%20engineering%20and%20management&rft.au=Songer,%20Anthony%20D&rft.date=2000-05-01&rft.volume=126&rft.issue=3&rft.spage=185&rft.epage=190&rft.pages=185-190&rft.issn=0733-9364&rft.eissn=1943-7862&rft.coden=JCEMD4&rft_id=info:doi/10.1061/(ASCE)0733-9364(2000)126:3(185)&rft_dat=%3Cproquest_cross%3E27760275%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=27760275&rft_id=info:pmid/&rfr_iscdi=true