Prototype Model for Build-Operate-Transfer Risk Assessment

The build-operate-transfer (BOT) approach for project delivery, where the private sector has to finance, design, build, operate, and maintain the facility and then transfer it to the government after a specified concession period, is now gaining widespread popularity in developing countries. Compare...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of management in engineering 2002-01, Vol.18 (1), p.7-16
Hauptverfasser: Zayed, Tarek M, Chang, Luh-Maan
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 16
container_issue 1
container_start_page 7
container_title Journal of management in engineering
container_volume 18
creator Zayed, Tarek M
Chang, Luh-Maan
description The build-operate-transfer (BOT) approach for project delivery, where the private sector has to finance, design, build, operate, and maintain the facility and then transfer it to the government after a specified concession period, is now gaining widespread popularity in developing countries. Compared with conventional project delivery methods, BOT sponsors expose themselves to a high risk, so that special attention must be paid to analyzing and managing risks. The identification, analysis, and allocation of various types of risks are an important aspect for the validation of privately promoted infrastructure projects. The BOT risk model presented in this paper is a prototype evaluation model that provides a logical, reliable, and consistent procedure for assessing the BOT project risk. The proposed model introduced the BOT risk index (F), which relied on the actual performance of eight main BOT risk areas. Two different modeling approaches were used in constructing this index: a new developed and an adapted Dias and Ioannou model. Not only can this index be used for BOT projects' risk evaluation, but also for ranking them to select the lowest risk project as well.
doi_str_mv 10.1061/(ASCE)0742-597X(2002)18:1(7)
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_27670161</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>18404746</sourcerecordid><originalsourceid>FETCH-LOGICAL-a402t-b6cd25c35043985c468517ef8a017e97f02b0efe23b1fd5f0f6fd2354c177d2c3</originalsourceid><addsrcrecordid>eNqFkD1PwzAURS0EEqXwHzIg1A6BZ8eJE5hCFb7UUgRFYrPcxJZS0jjYydB_j9NCR1h8PZx3pXsQOsdwiSHCV6P0bZKNgVHihwn7GBEAMsbxNR6x8QEa4IQGfkhZcogGe-gYnVi7AkcywAN0_WJ0q9tNI72ZLmTlKW28266sCn_eSCNa6S-MqK2Sxnst7aeXWiutXcu6PUVHSlRWnv3kEL3fZYvJgz-d3z9O0qkvKJDWX0Z5QcI8CIEGSRzmNIpDzKSKBbhImAKyBKkkCZZYFaECFamCBCHNMWMFyYMhutj1NkZ_ddK2fF3aXFaVqKXuLCcsclMi_C-IYwqU0ciBNzswN9paIxVvTLkWZsMx8N4s571Z3kvjvTTem3X3HHMW7HcKV85XujO1m8-fZtlzljqxgGPYxvZlu_9v8R-938bag38</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>18404746</pqid></control><display><type>article</type><title>Prototype Model for Build-Operate-Transfer Risk Assessment</title><source>Business Source Complete</source><creator>Zayed, Tarek M ; Chang, Luh-Maan</creator><creatorcontrib>Zayed, Tarek M ; Chang, Luh-Maan</creatorcontrib><description>The build-operate-transfer (BOT) approach for project delivery, where the private sector has to finance, design, build, operate, and maintain the facility and then transfer it to the government after a specified concession period, is now gaining widespread popularity in developing countries. Compared with conventional project delivery methods, BOT sponsors expose themselves to a high risk, so that special attention must be paid to analyzing and managing risks. The identification, analysis, and allocation of various types of risks are an important aspect for the validation of privately promoted infrastructure projects. The BOT risk model presented in this paper is a prototype evaluation model that provides a logical, reliable, and consistent procedure for assessing the BOT project risk. The proposed model introduced the BOT risk index (F), which relied on the actual performance of eight main BOT risk areas. Two different modeling approaches were used in constructing this index: a new developed and an adapted Dias and Ioannou model. Not only can this index be used for BOT projects' risk evaluation, but also for ranking them to select the lowest risk project as well.</description><identifier>ISSN: 0742-597X</identifier><identifier>EISSN: 1943-5479</identifier><identifier>DOI: 10.1061/(ASCE)0742-597X(2002)18:1(7)</identifier><language>eng</language><publisher>American Society of Civil Engineers</publisher><subject>TECHNICAL PAPERS</subject><ispartof>Journal of management in engineering, 2002-01, Vol.18 (1), p.7-16</ispartof><rights>Copyright © 2002 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a402t-b6cd25c35043985c468517ef8a017e97f02b0efe23b1fd5f0f6fd2354c177d2c3</citedby><cites>FETCH-LOGICAL-a402t-b6cd25c35043985c468517ef8a017e97f02b0efe23b1fd5f0f6fd2354c177d2c3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Zayed, Tarek M</creatorcontrib><creatorcontrib>Chang, Luh-Maan</creatorcontrib><title>Prototype Model for Build-Operate-Transfer Risk Assessment</title><title>Journal of management in engineering</title><description>The build-operate-transfer (BOT) approach for project delivery, where the private sector has to finance, design, build, operate, and maintain the facility and then transfer it to the government after a specified concession period, is now gaining widespread popularity in developing countries. Compared with conventional project delivery methods, BOT sponsors expose themselves to a high risk, so that special attention must be paid to analyzing and managing risks. The identification, analysis, and allocation of various types of risks are an important aspect for the validation of privately promoted infrastructure projects. The BOT risk model presented in this paper is a prototype evaluation model that provides a logical, reliable, and consistent procedure for assessing the BOT project risk. The proposed model introduced the BOT risk index (F), which relied on the actual performance of eight main BOT risk areas. Two different modeling approaches were used in constructing this index: a new developed and an adapted Dias and Ioannou model. Not only can this index be used for BOT projects' risk evaluation, but also for ranking them to select the lowest risk project as well.</description><subject>TECHNICAL PAPERS</subject><issn>0742-597X</issn><issn>1943-5479</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2002</creationdate><recordtype>article</recordtype><recordid>eNqFkD1PwzAURS0EEqXwHzIg1A6BZ8eJE5hCFb7UUgRFYrPcxJZS0jjYydB_j9NCR1h8PZx3pXsQOsdwiSHCV6P0bZKNgVHihwn7GBEAMsbxNR6x8QEa4IQGfkhZcogGe-gYnVi7AkcywAN0_WJ0q9tNI72ZLmTlKW28266sCn_eSCNa6S-MqK2Sxnst7aeXWiutXcu6PUVHSlRWnv3kEL3fZYvJgz-d3z9O0qkvKJDWX0Z5QcI8CIEGSRzmNIpDzKSKBbhImAKyBKkkCZZYFaECFamCBCHNMWMFyYMhutj1NkZ_ddK2fF3aXFaVqKXuLCcsclMi_C-IYwqU0ciBNzswN9paIxVvTLkWZsMx8N4s571Z3kvjvTTem3X3HHMW7HcKV85XujO1m8-fZtlzljqxgGPYxvZlu_9v8R-938bag38</recordid><startdate>200201</startdate><enddate>200201</enddate><creator>Zayed, Tarek M</creator><creator>Chang, Luh-Maan</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7U1</scope><scope>7U2</scope><scope>C1K</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>200201</creationdate><title>Prototype Model for Build-Operate-Transfer Risk Assessment</title><author>Zayed, Tarek M ; Chang, Luh-Maan</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a402t-b6cd25c35043985c468517ef8a017e97f02b0efe23b1fd5f0f6fd2354c177d2c3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2002</creationdate><topic>TECHNICAL PAPERS</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Zayed, Tarek M</creatorcontrib><creatorcontrib>Chang, Luh-Maan</creatorcontrib><collection>CrossRef</collection><collection>Risk Abstracts</collection><collection>Safety Science and Risk</collection><collection>Environmental Sciences and Pollution Management</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of management in engineering</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Zayed, Tarek M</au><au>Chang, Luh-Maan</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Prototype Model for Build-Operate-Transfer Risk Assessment</atitle><jtitle>Journal of management in engineering</jtitle><date>2002-01</date><risdate>2002</risdate><volume>18</volume><issue>1</issue><spage>7</spage><epage>16</epage><pages>7-16</pages><issn>0742-597X</issn><eissn>1943-5479</eissn><abstract>The build-operate-transfer (BOT) approach for project delivery, where the private sector has to finance, design, build, operate, and maintain the facility and then transfer it to the government after a specified concession period, is now gaining widespread popularity in developing countries. Compared with conventional project delivery methods, BOT sponsors expose themselves to a high risk, so that special attention must be paid to analyzing and managing risks. The identification, analysis, and allocation of various types of risks are an important aspect for the validation of privately promoted infrastructure projects. The BOT risk model presented in this paper is a prototype evaluation model that provides a logical, reliable, and consistent procedure for assessing the BOT project risk. The proposed model introduced the BOT risk index (F), which relied on the actual performance of eight main BOT risk areas. Two different modeling approaches were used in constructing this index: a new developed and an adapted Dias and Ioannou model. Not only can this index be used for BOT projects' risk evaluation, but also for ranking them to select the lowest risk project as well.</abstract><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)0742-597X(2002)18:1(7)</doi><tpages>10</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0742-597X
ispartof Journal of management in engineering, 2002-01, Vol.18 (1), p.7-16
issn 0742-597X
1943-5479
language eng
recordid cdi_proquest_miscellaneous_27670161
source Business Source Complete
subjects TECHNICAL PAPERS
title Prototype Model for Build-Operate-Transfer Risk Assessment
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T15%3A58%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Prototype%20Model%20for%20Build-Operate-Transfer%20Risk%20Assessment&rft.jtitle=Journal%20of%20management%20in%20engineering&rft.au=Zayed,%20Tarek%20M&rft.date=2002-01&rft.volume=18&rft.issue=1&rft.spage=7&rft.epage=16&rft.pages=7-16&rft.issn=0742-597X&rft.eissn=1943-5479&rft_id=info:doi/10.1061/(ASCE)0742-597X(2002)18:1(7)&rft_dat=%3Cproquest_cross%3E18404746%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=18404746&rft_id=info:pmid/&rfr_iscdi=true