Risk Management in International Construction Joint Ventures

This paper identifies the risk factors associated with international construction joint ventures (JVs) from and "integrated" perspective. The risk factors are grouped into three main groups: (1) Internal; (2) Project-specific; and (3) External. It examines the most effective mitigating mea...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of construction engineering and management 1999-07, Vol.125 (4), p.277-284
Hauptverfasser: Bing, Li, Tiong, Robert Lee-Kong, Fan, Wong Wai, Chew, David Ah-Seng
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!