Lessons Learned from the Failure of a Bituminous Surface Treatment in Central Oregon
During October 1996 a 10-km-long, double-lane, two-layer bituminous surface treatment (BST) was constructed near Bend, Oregon. The bottom BST layer consisted of an application of rapid setting high float emulsion (HFRS-2) followed by an application of 19- to 12.5-mm chips. The top layer consisted of...
Gespeichert in:
Veröffentlicht in: | Transportation research record 1999, Vol.1652 (1), p.51-58 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!