Comparison of fixed versus variable sampling interval Shewhart x control charts in the presence of positively autocorrelated data
Shewhart x control charts are designed to be used with independent observations. Actual data are, however, often positively autocorrelated. This simulation study compares the performance of the traditional fixed interval Shewhart x control chart with the variable interval technique when the data are...
Gespeichert in:
Veröffentlicht in: | Communications in statistics. Simulation and computation 1997-02, Vol.26 (1), p.83-106 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 106 |
---|---|
container_issue | 1 |
container_start_page | 83 |
container_title | Communications in statistics. Simulation and computation |
container_volume | 26 |
creator | Prybutok, Victor R Clayton, Howard R Harvey, Martha M |
description | Shewhart x control charts are designed to be used with independent observations. Actual data are, however, often positively autocorrelated. This simulation study compares the performance of the traditional fixed interval Shewhart x control chart with the variable interval technique when the data are autocorrelated. Samples of size 1 are employed in the investigation which is conducted by varying the interval length, autocorrelation parameter, and shift in the process mean. Adjustments for false alarms caused by the presence of autocorrelation are implemented. The results suggest that the average time to signal depends on the shift magnitude and the amount of autocorrelation in the process. We show that, in general, when monitoring an autocorrelated process it is advantageous to use the variable interval technique over the fixed interval approach and that this advantage increases in proportion to the shift in the process mean. |
doi_str_mv | 10.1080/03610919708813369 |
format | Article |
fullrecord | <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_miscellaneous_26478007</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>26478007</sourcerecordid><originalsourceid>FETCH-LOGICAL-p99t-a16580f7913758efcafc8b2c24966661a55a71611e765bc1c13a9a4edb44172d3</originalsourceid><addsrcrecordid>eNotjT1PwzAYhD2ARCn8ADZPbAE7TvwxooqPSpUY6F69cd5QIzcOthPKyD8nFdxyukenO0JuOLvjTLN7JiRnhhvFtOZCSHNGFidWzFBfkMuUPhhjQld6QX5W4TBAdCn0NHS0c0ds6YQxjYlOM4fGI01wGLzr36nrM8YJPH3b49ceYqZHakOfY_DUnnKaKzTvkQ4RE_YWT6NDSC67Cf03hTEHG2JED3k-aiHDFTnvwCe8_vcl2T49blcvxeb1eb162BSDMbkALmvNOmW4ULXGzkJndVPasjJyFoe6BsUl56hk3VhuuQADFbZNVXFVtmJJbv9mhxg-R0x5d3DJovfQYxjTrpSV0owp8Qv-t2Pp</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>26478007</pqid></control><display><type>article</type><title>Comparison of fixed versus variable sampling interval Shewhart x control charts in the presence of positively autocorrelated data</title><source>Taylor & Francis Journals Complete</source><creator>Prybutok, Victor R ; Clayton, Howard R ; Harvey, Martha M</creator><creatorcontrib>Prybutok, Victor R ; Clayton, Howard R ; Harvey, Martha M</creatorcontrib><description>Shewhart x control charts are designed to be used with independent observations. Actual data are, however, often positively autocorrelated. This simulation study compares the performance of the traditional fixed interval Shewhart x control chart with the variable interval technique when the data are autocorrelated. Samples of size 1 are employed in the investigation which is conducted by varying the interval length, autocorrelation parameter, and shift in the process mean. Adjustments for false alarms caused by the presence of autocorrelation are implemented. The results suggest that the average time to signal depends on the shift magnitude and the amount of autocorrelation in the process. We show that, in general, when monitoring an autocorrelated process it is advantageous to use the variable interval technique over the fixed interval approach and that this advantage increases in proportion to the shift in the process mean.</description><identifier>ISSN: 0361-0918</identifier><identifier>DOI: 10.1080/03610919708813369</identifier><language>eng</language><ispartof>Communications in statistics. Simulation and computation, 1997-02, Vol.26 (1), p.83-106</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Prybutok, Victor R</creatorcontrib><creatorcontrib>Clayton, Howard R</creatorcontrib><creatorcontrib>Harvey, Martha M</creatorcontrib><title>Comparison of fixed versus variable sampling interval Shewhart x control charts in the presence of positively autocorrelated data</title><title>Communications in statistics. Simulation and computation</title><description>Shewhart x control charts are designed to be used with independent observations. Actual data are, however, often positively autocorrelated. This simulation study compares the performance of the traditional fixed interval Shewhart x control chart with the variable interval technique when the data are autocorrelated. Samples of size 1 are employed in the investigation which is conducted by varying the interval length, autocorrelation parameter, and shift in the process mean. Adjustments for false alarms caused by the presence of autocorrelation are implemented. The results suggest that the average time to signal depends on the shift magnitude and the amount of autocorrelation in the process. We show that, in general, when monitoring an autocorrelated process it is advantageous to use the variable interval technique over the fixed interval approach and that this advantage increases in proportion to the shift in the process mean.</description><issn>0361-0918</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1997</creationdate><recordtype>article</recordtype><recordid>eNotjT1PwzAYhD2ARCn8ADZPbAE7TvwxooqPSpUY6F69cd5QIzcOthPKyD8nFdxyukenO0JuOLvjTLN7JiRnhhvFtOZCSHNGFidWzFBfkMuUPhhjQld6QX5W4TBAdCn0NHS0c0ds6YQxjYlOM4fGI01wGLzr36nrM8YJPH3b49ceYqZHakOfY_DUnnKaKzTvkQ4RE_YWT6NDSC67Cf03hTEHG2JED3k-aiHDFTnvwCe8_vcl2T49blcvxeb1eb162BSDMbkALmvNOmW4ULXGzkJndVPasjJyFoe6BsUl56hk3VhuuQADFbZNVXFVtmJJbv9mhxg-R0x5d3DJovfQYxjTrpSV0owp8Qv-t2Pp</recordid><startdate>19970201</startdate><enddate>19970201</enddate><creator>Prybutok, Victor R</creator><creator>Clayton, Howard R</creator><creator>Harvey, Martha M</creator><scope>7SC</scope><scope>8FD</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>19970201</creationdate><title>Comparison of fixed versus variable sampling interval Shewhart x control charts in the presence of positively autocorrelated data</title><author>Prybutok, Victor R ; Clayton, Howard R ; Harvey, Martha M</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p99t-a16580f7913758efcafc8b2c24966661a55a71611e765bc1c13a9a4edb44172d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1997</creationdate><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Prybutok, Victor R</creatorcontrib><creatorcontrib>Clayton, Howard R</creatorcontrib><creatorcontrib>Harvey, Martha M</creatorcontrib><collection>Computer and Information Systems Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>Communications in statistics. Simulation and computation</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Prybutok, Victor R</au><au>Clayton, Howard R</au><au>Harvey, Martha M</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Comparison of fixed versus variable sampling interval Shewhart x control charts in the presence of positively autocorrelated data</atitle><jtitle>Communications in statistics. Simulation and computation</jtitle><date>1997-02-01</date><risdate>1997</risdate><volume>26</volume><issue>1</issue><spage>83</spage><epage>106</epage><pages>83-106</pages><issn>0361-0918</issn><abstract>Shewhart x control charts are designed to be used with independent observations. Actual data are, however, often positively autocorrelated. This simulation study compares the performance of the traditional fixed interval Shewhart x control chart with the variable interval technique when the data are autocorrelated. Samples of size 1 are employed in the investigation which is conducted by varying the interval length, autocorrelation parameter, and shift in the process mean. Adjustments for false alarms caused by the presence of autocorrelation are implemented. The results suggest that the average time to signal depends on the shift magnitude and the amount of autocorrelation in the process. We show that, in general, when monitoring an autocorrelated process it is advantageous to use the variable interval technique over the fixed interval approach and that this advantage increases in proportion to the shift in the process mean.</abstract><doi>10.1080/03610919708813369</doi><tpages>24</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0361-0918 |
ispartof | Communications in statistics. Simulation and computation, 1997-02, Vol.26 (1), p.83-106 |
issn | 0361-0918 |
language | eng |
recordid | cdi_proquest_miscellaneous_26478007 |
source | Taylor & Francis Journals Complete |
title | Comparison of fixed versus variable sampling interval Shewhart x control charts in the presence of positively autocorrelated data |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-01T12%3A39%3A19IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Comparison%20of%20fixed%20versus%20variable%20sampling%20interval%20Shewhart%20x%20control%20charts%20in%20the%20presence%20of%20positively%20autocorrelated%20data&rft.jtitle=Communications%20in%20statistics.%20Simulation%20and%20computation&rft.au=Prybutok,%20Victor%20R&rft.date=1997-02-01&rft.volume=26&rft.issue=1&rft.spage=83&rft.epage=106&rft.pages=83-106&rft.issn=0361-0918&rft_id=info:doi/10.1080/03610919708813369&rft_dat=%3Cproquest%3E26478007%3C/proquest%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=26478007&rft_id=info:pmid/&rfr_iscdi=true |