HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects
Multistory buildings are characterized by many repetitive units or typical floors, which involve identical activities repeated consecutively from one floor to the next. The scheduling of these activities is controlled by the logical sequence between activities executed on the same floor, horizontal...
Gespeichert in:
Veröffentlicht in: | Journal of construction engineering and management 1994-12, Vol.120 (4), p.875-892 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 892 |
---|---|
container_issue | 4 |
container_start_page | 875 |
container_title | Journal of construction engineering and management |
container_volume | 120 |
creator | Thabet, Walid Y Beliveau, Yvan J |
description | Multistory buildings are characterized by many repetitive units or typical floors, which involve identical activities repeated consecutively from one floor to the next. The scheduling of these activities is controlled by the logical sequence between activities executed on the same floor, horizontal logic, and between activities executed on different floors, vertical logic. Linear scheduling techniques have been developed for scheduling repetitive work in multistory projects. Although these techniques consider horizontal and vertical constraints in their scheduling approaches, they do not provide a formalized methodology for incorporating such constraints to generate schedules. This paper describes a structured procedure to incorporate horizontal and vertical constraints to schedule repetitive work. The procedure defines "critical floors" at which these constraints need to be checked to ensure that all other floors are satisfactory. The critical floors are grouped in a set of scheduling cases. For every activity, the procedure identifies applicable cases from the set of scheduling cases defined. To validate the constraints, the procedure only checks the critical floors defined in the selected scheduling cases and makes decisions to sequence activity. |
doi_str_mv | 10.1061/(ASCE)0733-9364(1994)120:4(875) |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_26423361</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>26423361</sourcerecordid><originalsourceid>FETCH-LOGICAL-a409t-1c0b288be0ebf2511cc49578d20f4dd7d480b4472c07194e5e60e907cbf336af3</originalsourceid><addsrcrecordid>eNp9kMlOwzAURS0EEmX4hywQtIvA85DBXSBVpaWgViAVEDvLcZySKsTFThbl63EosMQbP0tH910fhC4wXGKI8VV_tBxPBpBQGnIasz7mnA0wgSHrp0k02EM9zBkNkzQm-6j3xx2iI-fWAJjFPOqh6exlvhwGM2PLT1M3sgpknQcv2jal8o-5WZUqWKo3nbdVWa-Cwthg0VZN6Rpjt8GjNWutGneCDgpZOX36cx-j5-nkaTwL5w-3d-PRPJQMeBNiBRlJ00yDzgoSYawU41GS5gQKludJzlLIGEuIgsS315GOQXNIVFZQGsuCHqPzXe7Gmo9Wu0a8l07pqpK1Nq0TJGbEk9iD1ztQWeOc1YXY2PJd2q3AIDp_QnT-ROdFdF5E5094f4IJ788HnP1sks6bKKysVen-UihNY866Pa87zFNarE1ra_9_cT-eLG4YeM0Evk83-9jvGf9W-L_BFz3giEA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>26423361</pqid></control><display><type>article</type><title>HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Thabet, Walid Y ; Beliveau, Yvan J</creator><creatorcontrib>Thabet, Walid Y ; Beliveau, Yvan J</creatorcontrib><description>Multistory buildings are characterized by many repetitive units or typical floors, which involve identical activities repeated consecutively from one floor to the next. The scheduling of these activities is controlled by the logical sequence between activities executed on the same floor, horizontal logic, and between activities executed on different floors, vertical logic. Linear scheduling techniques have been developed for scheduling repetitive work in multistory projects. Although these techniques consider horizontal and vertical constraints in their scheduling approaches, they do not provide a formalized methodology for incorporating such constraints to generate schedules. This paper describes a structured procedure to incorporate horizontal and vertical constraints to schedule repetitive work. The procedure defines "critical floors" at which these constraints need to be checked to ensure that all other floors are satisfactory. The critical floors are grouped in a set of scheduling cases. For every activity, the procedure identifies applicable cases from the set of scheduling cases defined. To validate the constraints, the procedure only checks the critical floors defined in the selected scheduling cases and makes decisions to sequence activity.</description><identifier>ISSN: 0733-9364</identifier><identifier>EISSN: 1943-7862</identifier><identifier>DOI: 10.1061/(ASCE)0733-9364(1994)120:4(875)</identifier><identifier>CODEN: JCEMD4</identifier><language>eng</language><publisher>Reston, VA: American Society of Civil Engineers</publisher><subject>Applied sciences ; Buildings. Public works ; Construction works ; Exact sciences and technology ; Site organization ; TECHNICAL PAPERS</subject><ispartof>Journal of construction engineering and management, 1994-12, Vol.120 (4), p.875-892</ispartof><rights>Copyright © 1994 American Society of Civil Engineers</rights><rights>1995 INIST-CNRS</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a409t-1c0b288be0ebf2511cc49578d20f4dd7d480b4472c07194e5e60e907cbf336af3</citedby><cites>FETCH-LOGICAL-a409t-1c0b288be0ebf2511cc49578d20f4dd7d480b4472c07194e5e60e907cbf336af3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)0733-9364(1994)120:4(875)$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)0733-9364(1994)120:4(875)$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,776,780,27903,27904,75939,75947</link.rule.ids><backlink>$$Uhttp://pascal-francis.inist.fr/vibad/index.php?action=getRecordDetail&idt=3386941$$DView record in Pascal Francis$$Hfree_for_read</backlink></links><search><creatorcontrib>Thabet, Walid Y</creatorcontrib><creatorcontrib>Beliveau, Yvan J</creatorcontrib><title>HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects</title><title>Journal of construction engineering and management</title><description>Multistory buildings are characterized by many repetitive units or typical floors, which involve identical activities repeated consecutively from one floor to the next. The scheduling of these activities is controlled by the logical sequence between activities executed on the same floor, horizontal logic, and between activities executed on different floors, vertical logic. Linear scheduling techniques have been developed for scheduling repetitive work in multistory projects. Although these techniques consider horizontal and vertical constraints in their scheduling approaches, they do not provide a formalized methodology for incorporating such constraints to generate schedules. This paper describes a structured procedure to incorporate horizontal and vertical constraints to schedule repetitive work. The procedure defines "critical floors" at which these constraints need to be checked to ensure that all other floors are satisfactory. The critical floors are grouped in a set of scheduling cases. For every activity, the procedure identifies applicable cases from the set of scheduling cases defined. To validate the constraints, the procedure only checks the critical floors defined in the selected scheduling cases and makes decisions to sequence activity.</description><subject>Applied sciences</subject><subject>Buildings. Public works</subject><subject>Construction works</subject><subject>Exact sciences and technology</subject><subject>Site organization</subject><subject>TECHNICAL PAPERS</subject><issn>0733-9364</issn><issn>1943-7862</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1994</creationdate><recordtype>article</recordtype><recordid>eNp9kMlOwzAURS0EEmX4hywQtIvA85DBXSBVpaWgViAVEDvLcZySKsTFThbl63EosMQbP0tH910fhC4wXGKI8VV_tBxPBpBQGnIasz7mnA0wgSHrp0k02EM9zBkNkzQm-6j3xx2iI-fWAJjFPOqh6exlvhwGM2PLT1M3sgpknQcv2jal8o-5WZUqWKo3nbdVWa-Cwthg0VZN6Rpjt8GjNWutGneCDgpZOX36cx-j5-nkaTwL5w-3d-PRPJQMeBNiBRlJ00yDzgoSYawU41GS5gQKludJzlLIGEuIgsS315GOQXNIVFZQGsuCHqPzXe7Gmo9Wu0a8l07pqpK1Nq0TJGbEk9iD1ztQWeOc1YXY2PJd2q3AIDp_QnT-ROdFdF5E5094f4IJ788HnP1sks6bKKysVen-UihNY866Pa87zFNarE1ra_9_cT-eLG4YeM0Evk83-9jvGf9W-L_BFz3giEA</recordid><startdate>19941201</startdate><enddate>19941201</enddate><creator>Thabet, Walid Y</creator><creator>Beliveau, Yvan J</creator><general>American Society of Civil Engineers</general><scope>IQODW</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>19941201</creationdate><title>HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects</title><author>Thabet, Walid Y ; Beliveau, Yvan J</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a409t-1c0b288be0ebf2511cc49578d20f4dd7d480b4472c07194e5e60e907cbf336af3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1994</creationdate><topic>Applied sciences</topic><topic>Buildings. Public works</topic><topic>Construction works</topic><topic>Exact sciences and technology</topic><topic>Site organization</topic><topic>TECHNICAL PAPERS</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Thabet, Walid Y</creatorcontrib><creatorcontrib>Beliveau, Yvan J</creatorcontrib><collection>Pascal-Francis</collection><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of construction engineering and management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Thabet, Walid Y</au><au>Beliveau, Yvan J</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects</atitle><jtitle>Journal of construction engineering and management</jtitle><date>1994-12-01</date><risdate>1994</risdate><volume>120</volume><issue>4</issue><spage>875</spage><epage>892</epage><pages>875-892</pages><issn>0733-9364</issn><eissn>1943-7862</eissn><coden>JCEMD4</coden><abstract>Multistory buildings are characterized by many repetitive units or typical floors, which involve identical activities repeated consecutively from one floor to the next. The scheduling of these activities is controlled by the logical sequence between activities executed on the same floor, horizontal logic, and between activities executed on different floors, vertical logic. Linear scheduling techniques have been developed for scheduling repetitive work in multistory projects. Although these techniques consider horizontal and vertical constraints in their scheduling approaches, they do not provide a formalized methodology for incorporating such constraints to generate schedules. This paper describes a structured procedure to incorporate horizontal and vertical constraints to schedule repetitive work. The procedure defines "critical floors" at which these constraints need to be checked to ensure that all other floors are satisfactory. The critical floors are grouped in a set of scheduling cases. For every activity, the procedure identifies applicable cases from the set of scheduling cases defined. To validate the constraints, the procedure only checks the critical floors defined in the selected scheduling cases and makes decisions to sequence activity.</abstract><cop>Reston, VA</cop><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)0733-9364(1994)120:4(875)</doi><tpages>18</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0733-9364 |
ispartof | Journal of construction engineering and management, 1994-12, Vol.120 (4), p.875-892 |
issn | 0733-9364 1943-7862 |
language | eng |
recordid | cdi_proquest_miscellaneous_26423361 |
source | American Society of Civil Engineers:NESLI2:Journals:2014 |
subjects | Applied sciences Buildings. Public works Construction works Exact sciences and technology Site organization TECHNICAL PAPERS |
title | HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T02%3A41%3A27IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=HVLS:%20Horizontal%20and%20Vertical%20Logic%20Scheduling%20for%20Multistory%20Projects&rft.jtitle=Journal%20of%20construction%20engineering%20and%20management&rft.au=Thabet,%20Walid%20Y&rft.date=1994-12-01&rft.volume=120&rft.issue=4&rft.spage=875&rft.epage=892&rft.pages=875-892&rft.issn=0733-9364&rft.eissn=1943-7862&rft.coden=JCEMD4&rft_id=info:doi/10.1061/(ASCE)0733-9364(1994)120:4(875)&rft_dat=%3Cproquest_cross%3E26423361%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=26423361&rft_id=info:pmid/&rfr_iscdi=true |