Predicting Effluent PCBs from Superfund Site Dredged Material

The Corps of Engineers and EPA conducted a feasibility study of using dredges to remove PCBs from the highly contaminated sediments of the New Bedford, Mass., harbor, a Superfund site. Three types of dredges were tested. Also, a confined disposal facility (CDF) was constructed to test the feasibilit...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of environmental engineering (New York, N.Y.) N.Y.), 1992-09, Vol.118 (5), p.657-665
Hauptverfasser: Thackston, Edward L, Palermo, Michael R
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!