Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China

•Construction waste was classified into five types based on its chemical properties.•Using an improved on-site measurement to collect construction waste generation data.•Developing a support vector machine-based model to estimate waste generation rate.•Case study illustrates the performance and appl...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Waste management (Elmsford) 2021-05, Vol.126, p.791-799
Hauptverfasser: Hu, Ruibo, Chen, Ke, Chen, Weiya, Wang, Qiankun, Luo, Hanbin
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 799
container_issue
container_start_page 791
container_title Waste management (Elmsford)
container_volume 126
creator Hu, Ruibo
Chen, Ke
Chen, Weiya
Wang, Qiankun
Luo, Hanbin
description •Construction waste was classified into five types based on its chemical properties.•Using an improved on-site measurement to collect construction waste generation data.•Developing a support vector machine-based model to estimate waste generation rate.•Case study illustrates the performance and applicability of the proposed approach. Estimation of construction waste generation (CWG) at the field scale is a crucial but challenging task for effective construction waste management (CWM). Extant field-scale CWG modeling approaches have faced difficulties in obtaining accurate results due to a lack of detailed CWG data, and most of them fail to consider the complex relationship among predictive variables. This study attempts to tackle this issue by proposing a novel CWG modeling approach that integrates improved on-site measurement (IOM) and a support vector machine (SVM)-based prediction model. To achieve this goal, 206 ongoing commercial construction sites were investigated to obtain the predictor values and waste generation rates (WGRs) of five types of waste (i.e., inorganic nonmetallic waste, organic waste, metal waste, composite waste, and hazardous waste) generated at three construction stages (i.e., the understructure stage, superstructure stage, and finishing stage). The data were introduced to the SVM to develop the relationships between predictive variables and WGRs. An actual commercial building under construction was used to demonstrate the applicability of the proposed approach. The results showed that the superiority of the IOM can be used as a basis to implement robust CWG data collection. In addition, the SVM-based WGR prediction model (SWPM) can obtain more accurate prediction results (R2 = 86.87%) than the back-propagation neural network (R2 = 75.14%) and multiple linear regression (R2 = 61.93%).
doi_str_mv 10.1016/j.wasman.2021.04.012
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_2518226770</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0956053X21002105</els_id><sourcerecordid>2518226770</sourcerecordid><originalsourceid>FETCH-LOGICAL-c362t-b80934ac70d87bc099d194079209aadcbfe98d43a5b3efc6c191404cc9416e573</originalsourceid><addsrcrecordid>eNp9kc1O3TAQhS3UCi60b4CQl90kHTvOj1kgoSsolai66I-6sxx7Ar6KnYudUPVd-rA1hHbZlT2a78zRzCHklEHJgDXvd-VPnbwOJQfOShAlMH5ANqxrZcFF3bwiG5B1U0Bd_TgixyntAJjoGBySo6rqpKhruSG_r9LsvJ7dFOg0UDOFNMfFPNd5_oz0DgPGFeh1QkvzRwfq_D5Oj89lkVzmPOq0RPQY5ty39Mv3T8Uq2Ee0bh3pJ4vjOb2kJndWQ-8xGqdH2i9utC7cJeoC3d67oN-Q14MeE759eU_It-urr9ub4vbzh4_by9vCVA2fi74DWQltWrBd2xuQ0jIpoJUcpNbW9APKzopK132Fg2kMk0yAMEYK1mDdVifk3To3r_SwYJqVd8ngOOqA05IUr1nHedO2kFGxoiZOKUUc1D7m-8VfioF6ykXt1JqLespFgVA5lyw7e3FYeo_2n-hvEBm4WAHMez46jCoZh8Hky0U0s7KT-7_DH2nzo2s</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2518226770</pqid></control><display><type>article</type><title>Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China</title><source>ScienceDirect Journals (5 years ago - present)</source><creator>Hu, Ruibo ; Chen, Ke ; Chen, Weiya ; Wang, Qiankun ; Luo, Hanbin</creator><creatorcontrib>Hu, Ruibo ; Chen, Ke ; Chen, Weiya ; Wang, Qiankun ; Luo, Hanbin</creatorcontrib><description>•Construction waste was classified into five types based on its chemical properties.•Using an improved on-site measurement to collect construction waste generation data.•Developing a support vector machine-based model to estimate waste generation rate.•Case study illustrates the performance and applicability of the proposed approach. Estimation of construction waste generation (CWG) at the field scale is a crucial but challenging task for effective construction waste management (CWM). Extant field-scale CWG modeling approaches have faced difficulties in obtaining accurate results due to a lack of detailed CWG data, and most of them fail to consider the complex relationship among predictive variables. This study attempts to tackle this issue by proposing a novel CWG modeling approach that integrates improved on-site measurement (IOM) and a support vector machine (SVM)-based prediction model. To achieve this goal, 206 ongoing commercial construction sites were investigated to obtain the predictor values and waste generation rates (WGRs) of five types of waste (i.e., inorganic nonmetallic waste, organic waste, metal waste, composite waste, and hazardous waste) generated at three construction stages (i.e., the understructure stage, superstructure stage, and finishing stage). The data were introduced to the SVM to develop the relationships between predictive variables and WGRs. An actual commercial building under construction was used to demonstrate the applicability of the proposed approach. The results showed that the superiority of the IOM can be used as a basis to implement robust CWG data collection. In addition, the SVM-based WGR prediction model (SWPM) can obtain more accurate prediction results (R2 = 86.87%) than the back-propagation neural network (R2 = 75.14%) and multiple linear regression (R2 = 61.93%).</description><identifier>ISSN: 0956-053X</identifier><identifier>EISSN: 1879-2456</identifier><identifier>DOI: 10.1016/j.wasman.2021.04.012</identifier><identifier>PMID: 33894559</identifier><language>eng</language><publisher>United States: Elsevier Ltd</publisher><subject>Construction waste management ; On-site measurement ; Prediction ; Support vector machine ; Waste generation rate</subject><ispartof>Waste management (Elmsford), 2021-05, Vol.126, p.791-799</ispartof><rights>2021 Elsevier Ltd</rights><rights>Copyright © 2021 Elsevier Ltd. All rights reserved.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c362t-b80934ac70d87bc099d194079209aadcbfe98d43a5b3efc6c191404cc9416e573</citedby><cites>FETCH-LOGICAL-c362t-b80934ac70d87bc099d194079209aadcbfe98d43a5b3efc6c191404cc9416e573</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.wasman.2021.04.012$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,780,784,3550,27924,27925,45995</link.rule.ids><backlink>$$Uhttps://www.ncbi.nlm.nih.gov/pubmed/33894559$$D View this record in MEDLINE/PubMed$$Hfree_for_read</backlink></links><search><creatorcontrib>Hu, Ruibo</creatorcontrib><creatorcontrib>Chen, Ke</creatorcontrib><creatorcontrib>Chen, Weiya</creatorcontrib><creatorcontrib>Wang, Qiankun</creatorcontrib><creatorcontrib>Luo, Hanbin</creatorcontrib><title>Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China</title><title>Waste management (Elmsford)</title><addtitle>Waste Manag</addtitle><description>•Construction waste was classified into five types based on its chemical properties.•Using an improved on-site measurement to collect construction waste generation data.•Developing a support vector machine-based model to estimate waste generation rate.•Case study illustrates the performance and applicability of the proposed approach. Estimation of construction waste generation (CWG) at the field scale is a crucial but challenging task for effective construction waste management (CWM). Extant field-scale CWG modeling approaches have faced difficulties in obtaining accurate results due to a lack of detailed CWG data, and most of them fail to consider the complex relationship among predictive variables. This study attempts to tackle this issue by proposing a novel CWG modeling approach that integrates improved on-site measurement (IOM) and a support vector machine (SVM)-based prediction model. To achieve this goal, 206 ongoing commercial construction sites were investigated to obtain the predictor values and waste generation rates (WGRs) of five types of waste (i.e., inorganic nonmetallic waste, organic waste, metal waste, composite waste, and hazardous waste) generated at three construction stages (i.e., the understructure stage, superstructure stage, and finishing stage). The data were introduced to the SVM to develop the relationships between predictive variables and WGRs. An actual commercial building under construction was used to demonstrate the applicability of the proposed approach. The results showed that the superiority of the IOM can be used as a basis to implement robust CWG data collection. In addition, the SVM-based WGR prediction model (SWPM) can obtain more accurate prediction results (R2 = 86.87%) than the back-propagation neural network (R2 = 75.14%) and multiple linear regression (R2 = 61.93%).</description><subject>Construction waste management</subject><subject>On-site measurement</subject><subject>Prediction</subject><subject>Support vector machine</subject><subject>Waste generation rate</subject><issn>0956-053X</issn><issn>1879-2456</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2021</creationdate><recordtype>article</recordtype><recordid>eNp9kc1O3TAQhS3UCi60b4CQl90kHTvOj1kgoSsolai66I-6sxx7Ar6KnYudUPVd-rA1hHbZlT2a78zRzCHklEHJgDXvd-VPnbwOJQfOShAlMH5ANqxrZcFF3bwiG5B1U0Bd_TgixyntAJjoGBySo6rqpKhruSG_r9LsvJ7dFOg0UDOFNMfFPNd5_oz0DgPGFeh1QkvzRwfq_D5Oj89lkVzmPOq0RPQY5ty39Mv3T8Uq2Ee0bh3pJ4vjOb2kJndWQ-8xGqdH2i9utC7cJeoC3d67oN-Q14MeE759eU_It-urr9ub4vbzh4_by9vCVA2fi74DWQltWrBd2xuQ0jIpoJUcpNbW9APKzopK132Fg2kMk0yAMEYK1mDdVifk3To3r_SwYJqVd8ngOOqA05IUr1nHedO2kFGxoiZOKUUc1D7m-8VfioF6ykXt1JqLespFgVA5lyw7e3FYeo_2n-hvEBm4WAHMez46jCoZh8Hky0U0s7KT-7_DH2nzo2s</recordid><startdate>20210501</startdate><enddate>20210501</enddate><creator>Hu, Ruibo</creator><creator>Chen, Ke</creator><creator>Chen, Weiya</creator><creator>Wang, Qiankun</creator><creator>Luo, Hanbin</creator><general>Elsevier Ltd</general><scope>NPM</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7X8</scope></search><sort><creationdate>20210501</creationdate><title>Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China</title><author>Hu, Ruibo ; Chen, Ke ; Chen, Weiya ; Wang, Qiankun ; Luo, Hanbin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c362t-b80934ac70d87bc099d194079209aadcbfe98d43a5b3efc6c191404cc9416e573</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2021</creationdate><topic>Construction waste management</topic><topic>On-site measurement</topic><topic>Prediction</topic><topic>Support vector machine</topic><topic>Waste generation rate</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Hu, Ruibo</creatorcontrib><creatorcontrib>Chen, Ke</creatorcontrib><creatorcontrib>Chen, Weiya</creatorcontrib><creatorcontrib>Wang, Qiankun</creatorcontrib><creatorcontrib>Luo, Hanbin</creatorcontrib><collection>PubMed</collection><collection>CrossRef</collection><collection>MEDLINE - Academic</collection><jtitle>Waste management (Elmsford)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Hu, Ruibo</au><au>Chen, Ke</au><au>Chen, Weiya</au><au>Wang, Qiankun</au><au>Luo, Hanbin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China</atitle><jtitle>Waste management (Elmsford)</jtitle><addtitle>Waste Manag</addtitle><date>2021-05-01</date><risdate>2021</risdate><volume>126</volume><spage>791</spage><epage>799</epage><pages>791-799</pages><issn>0956-053X</issn><eissn>1879-2456</eissn><abstract>•Construction waste was classified into five types based on its chemical properties.•Using an improved on-site measurement to collect construction waste generation data.•Developing a support vector machine-based model to estimate waste generation rate.•Case study illustrates the performance and applicability of the proposed approach. Estimation of construction waste generation (CWG) at the field scale is a crucial but challenging task for effective construction waste management (CWM). Extant field-scale CWG modeling approaches have faced difficulties in obtaining accurate results due to a lack of detailed CWG data, and most of them fail to consider the complex relationship among predictive variables. This study attempts to tackle this issue by proposing a novel CWG modeling approach that integrates improved on-site measurement (IOM) and a support vector machine (SVM)-based prediction model. To achieve this goal, 206 ongoing commercial construction sites were investigated to obtain the predictor values and waste generation rates (WGRs) of five types of waste (i.e., inorganic nonmetallic waste, organic waste, metal waste, composite waste, and hazardous waste) generated at three construction stages (i.e., the understructure stage, superstructure stage, and finishing stage). The data were introduced to the SVM to develop the relationships between predictive variables and WGRs. An actual commercial building under construction was used to demonstrate the applicability of the proposed approach. The results showed that the superiority of the IOM can be used as a basis to implement robust CWG data collection. In addition, the SVM-based WGR prediction model (SWPM) can obtain more accurate prediction results (R2 = 86.87%) than the back-propagation neural network (R2 = 75.14%) and multiple linear regression (R2 = 61.93%).</abstract><cop>United States</cop><pub>Elsevier Ltd</pub><pmid>33894559</pmid><doi>10.1016/j.wasman.2021.04.012</doi><tpages>9</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0956-053X
ispartof Waste management (Elmsford), 2021-05, Vol.126, p.791-799
issn 0956-053X
1879-2456
language eng
recordid cdi_proquest_miscellaneous_2518226770
source ScienceDirect Journals (5 years ago - present)
subjects Construction waste management
On-site measurement
Prediction
Support vector machine
Waste generation rate
title Estimation of construction waste generation based on an improved on-site measurement and SVM-based prediction model: A case of commercial buildings in China
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-22T16%3A34%3A22IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Estimation%20of%20construction%20waste%20generation%20based%20on%20an%20improved%20on-site%20measurement%20and%20SVM-based%20prediction%20model:%20A%20case%20of%20commercial%20buildings%20in%20China&rft.jtitle=Waste%20management%20(Elmsford)&rft.au=Hu,%20Ruibo&rft.date=2021-05-01&rft.volume=126&rft.spage=791&rft.epage=799&rft.pages=791-799&rft.issn=0956-053X&rft.eissn=1879-2456&rft_id=info:doi/10.1016/j.wasman.2021.04.012&rft_dat=%3Cproquest_cross%3E2518226770%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2518226770&rft_id=info:pmid/33894559&rft_els_id=S0956053X21002105&rfr_iscdi=true