Designing Treatment Basin Dimensions to Reduce Cost

A simple procedure for designing large, shallow basins to ensure adequate treatment time and reduce their costs is derived and explained. It considers the cost of perimeter and internal (baffle) dikes, the cost of land, and the retention time, as affected by hydraulic efficiency. Two examples are pr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of environmental engineering (New York, N.Y.) N.Y.), 1991-05, Vol.117 (3), p.381-386
Hauptverfasser: Shields, F. Douglas, Thackston, Edward L
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!