Challenges of construction mining plant
Objective of the study show the reject disposal problem in the mining industry. In this year the plant reported a decrease in the output of nickel and copper in the plant's concentrate compared to last year's, with was due to overall deterioration in the quality of the processed ores. The...
Gespeichert in:
Veröffentlicht in: | Stroitel'stvo unikal'nyh zdanij i sooruhenij 2016-05 (7), p.17-17 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 17 |
---|---|
container_issue | 7 |
container_start_page | 17 |
container_title | Stroitel'stvo unikal'nyh zdanij i sooruhenij |
container_volume | |
creator | Seko, E V Urunov, T Sh |
description | Objective of the study show the reject disposal problem in the mining industry. In this year the plant reported a decrease in the output of nickel and copper in the plant's concentrate compared to last year's, with was due to overall deterioration in the quality of the processed ores. The main factor causing reduction output was lower supply of feedstock. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study showed main factor causing reduction output was lower supply of feedstock but the metals demand goes up. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study proposed the evaluation of the possible volume of construction enterprises in the industry in the near future. |
format | Article |
fullrecord | <record><control><sourceid>proquest</sourceid><recordid>TN_cdi_proquest_miscellaneous_1904208078</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>4322080851</sourcerecordid><originalsourceid>FETCH-LOGICAL-p618-fa8638d409bf30a048ad0d3683cf68a376fff917d359bd625f295d5a01cee0bd3</originalsourceid><addsrcrecordid>eNpdzj1rwzAUhWERKDSk-Q-GDuliuNKVZGkspmkLgS7ZjayP1EGRXMv-_zG0U6ezvByeDdkyBF5LpsUj2ZdyBQCKTCDlW3Jov02MPl18qXKobE5lnhY7DzlVtyEN6VKN0aT5iTwEE4vf_-2OnI9v5_ajPn29f7avp3qUVNXBKInKcdB9QDDAlXHgUCq0QSqDjQwhaNo4FLp3komwopwwQK330DvckZff23HKP4svc3cbivVxJfi8lI5q4AwUNGpNn_-l17xMacV1VGmmOXDB8A5e8EmW</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1892940452</pqid></control><display><type>article</type><title>Challenges of construction mining plant</title><source>EZB Electronic Journals Library</source><creator>Seko, E V ; Urunov, T Sh</creator><creatorcontrib>Seko, E V ; Urunov, T Sh</creatorcontrib><description>Objective of the study show the reject disposal problem in the mining industry. In this year the plant reported a decrease in the output of nickel and copper in the plant's concentrate compared to last year's, with was due to overall deterioration in the quality of the processed ores. The main factor causing reduction output was lower supply of feedstock. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study showed main factor causing reduction output was lower supply of feedstock but the metals demand goes up. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study proposed the evaluation of the possible volume of construction enterprises in the industry in the near future.</description><identifier>EISSN: 2304-6295</identifier><language>eng ; rus</language><publisher>St. Petersburg: Production, Research and Design Institution "Venchur", Technological Cluster of Saint-Petersburg State Polytechnical University</publisher><subject>Concentrates (ores) ; Construction ; Construction industry ; Deposits ; Feedstock ; Mining ; Ores ; Reduction (metal working)</subject><ispartof>Stroitel'stvo unikal'nyh zdanij i sooruhenij, 2016-05 (7), p.17-17</ispartof><rights>Copyright Production, Research and Design Institution "Venchur", Technological Cluster of Saint-Petersburg State Polytechnical University 2016</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780</link.rule.ids></links><search><creatorcontrib>Seko, E V</creatorcontrib><creatorcontrib>Urunov, T Sh</creatorcontrib><title>Challenges of construction mining plant</title><title>Stroitel'stvo unikal'nyh zdanij i sooruhenij</title><description>Objective of the study show the reject disposal problem in the mining industry. In this year the plant reported a decrease in the output of nickel and copper in the plant's concentrate compared to last year's, with was due to overall deterioration in the quality of the processed ores. The main factor causing reduction output was lower supply of feedstock. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study showed main factor causing reduction output was lower supply of feedstock but the metals demand goes up. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study proposed the evaluation of the possible volume of construction enterprises in the industry in the near future.</description><subject>Concentrates (ores)</subject><subject>Construction</subject><subject>Construction industry</subject><subject>Deposits</subject><subject>Feedstock</subject><subject>Mining</subject><subject>Ores</subject><subject>Reduction (metal working)</subject><issn>2304-6295</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><sourceid>BENPR</sourceid><recordid>eNpdzj1rwzAUhWERKDSk-Q-GDuliuNKVZGkspmkLgS7ZjayP1EGRXMv-_zG0U6ezvByeDdkyBF5LpsUj2ZdyBQCKTCDlW3Jov02MPl18qXKobE5lnhY7DzlVtyEN6VKN0aT5iTwEE4vf_-2OnI9v5_ajPn29f7avp3qUVNXBKInKcdB9QDDAlXHgUCq0QSqDjQwhaNo4FLp3komwopwwQK330DvckZff23HKP4svc3cbivVxJfi8lI5q4AwUNGpNn_-l17xMacV1VGmmOXDB8A5e8EmW</recordid><startdate>20160515</startdate><enddate>20160515</enddate><creator>Seko, E V</creator><creator>Urunov, T Sh</creator><general>Production, Research and Design Institution "Venchur", Technological Cluster of Saint-Petersburg State Polytechnical University</general><scope>8FD</scope><scope>8FE</scope><scope>8FG</scope><scope>ABJCF</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>BGLVJ</scope><scope>BYOGL</scope><scope>CCPQU</scope><scope>DWQXO</scope><scope>FR3</scope><scope>HCIFZ</scope><scope>KR7</scope><scope>L6V</scope><scope>M7S</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><scope>PTHSS</scope></search><sort><creationdate>20160515</creationdate><title>Challenges of construction mining plant</title><author>Seko, E V ; Urunov, T Sh</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p618-fa8638d409bf30a048ad0d3683cf68a376fff917d359bd625f295d5a01cee0bd3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng ; rus</language><creationdate>2016</creationdate><topic>Concentrates (ores)</topic><topic>Construction</topic><topic>Construction industry</topic><topic>Deposits</topic><topic>Feedstock</topic><topic>Mining</topic><topic>Ores</topic><topic>Reduction (metal working)</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Seko, E V</creatorcontrib><creatorcontrib>Urunov, T Sh</creatorcontrib><collection>Technology Research Database</collection><collection>ProQuest SciTech Collection</collection><collection>ProQuest Technology Collection</collection><collection>Materials Science & Engineering Collection</collection><collection>ProQuest Central (Alumni)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>Technology Collection</collection><collection>East Europe, Central Europe Database</collection><collection>ProQuest One Community College</collection><collection>ProQuest Central</collection><collection>Engineering Research Database</collection><collection>SciTech Premium Collection</collection><collection>Civil Engineering Abstracts</collection><collection>ProQuest Engineering Collection</collection><collection>Engineering Database</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><collection>Engineering collection</collection><jtitle>Stroitel'stvo unikal'nyh zdanij i sooruhenij</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Seko, E V</au><au>Urunov, T Sh</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Challenges of construction mining plant</atitle><jtitle>Stroitel'stvo unikal'nyh zdanij i sooruhenij</jtitle><date>2016-05-15</date><risdate>2016</risdate><issue>7</issue><spage>17</spage><epage>17</epage><pages>17-17</pages><eissn>2304-6295</eissn><abstract>Objective of the study show the reject disposal problem in the mining industry. In this year the plant reported a decrease in the output of nickel and copper in the plant's concentrate compared to last year's, with was due to overall deterioration in the quality of the processed ores. The main factor causing reduction output was lower supply of feedstock. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study showed main factor causing reduction output was lower supply of feedstock but the metals demand goes up. The solution of this problem is the opening of a deposit and construction of modern mining enterprises. The study proposed the evaluation of the possible volume of construction enterprises in the industry in the near future.</abstract><cop>St. Petersburg</cop><pub>Production, Research and Design Institution "Venchur", Technological Cluster of Saint-Petersburg State Polytechnical University</pub><tpages>1</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | EISSN: 2304-6295 |
ispartof | Stroitel'stvo unikal'nyh zdanij i sooruhenij, 2016-05 (7), p.17-17 |
issn | 2304-6295 |
language | eng ; rus |
recordid | cdi_proquest_miscellaneous_1904208078 |
source | EZB Electronic Journals Library |
subjects | Concentrates (ores) Construction Construction industry Deposits Feedstock Mining Ores Reduction (metal working) |
title | Challenges of construction mining plant |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T00%3A20%3A48IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Challenges%20of%20construction%20mining%20plant&rft.jtitle=Stroitel'stvo%20unikal'nyh%20zdanij%20i%20sooruhenij&rft.au=Seko,%20E%20V&rft.date=2016-05-15&rft.issue=7&rft.spage=17&rft.epage=17&rft.pages=17-17&rft.eissn=2304-6295&rft_id=info:doi/&rft_dat=%3Cproquest%3E4322080851%3C/proquest%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1892940452&rft_id=info:pmid/&rfr_iscdi=true |