Method to Evaluate the Long-Term Surface Movements by Tunneling in London Clay

AbstractLong-term ground movements occur after tunnel construction in clayey soils due to dissipation of excess pore pressure generated during construction and a new seepage state that depends on the drainage conditions of the tunnel. A methodology was proposed in the past to evaluate the long-term...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of geotechnical and geoenvironmental engineering 2017-03, Vol.143 (3)
Hauptverfasser: Laver, Richard George, Li, Zili, Soga, Kenichi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!