Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects
AbstractCost overruns are a recurrent problem in hydrocarbon (oil and gas) megaprojects. An understanding of why and how they occur is needed if they are to be mitigated; such knowledge can provide managers with the foundations to develop techniques to reduce and contain their negative impacts on a...
Gespeichert in:
Veröffentlicht in: | Journal of construction engineering and management 2017-02, Vol.143 (2) |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 2 |
container_start_page | |
container_title | Journal of construction engineering and management |
container_volume | 143 |
creator | Olaniran, O. J Love, P. E. D Edwards, D. J Olatunji, O Matthews, J |
description | AbstractCost overruns are a recurrent problem in hydrocarbon (oil and gas) megaprojects. An understanding of why and how they occur is needed if they are to be mitigated; such knowledge can provide managers with the foundations to develop techniques to reduce and contain their negative impacts on a project’s performance. This paper examines the nature of cost overruns in hydrocarbon megaprojects using the theoretical lens of chaos theory. The underlying principles of chaos theory are reviewed and its research implications for examining cost overruns identified. By viewing megaprojects as chaotic or dynamic systems, the industry and research community may be better positioned to develop innovative solutions to mitigate cost overrun occurrence. |
doi_str_mv | 10.1061/(ASCE)CO.1943-7862.0001227 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1879999811</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1879999811</sourcerecordid><originalsourceid>FETCH-LOGICAL-a441t-652d333ede4ba8817d2e1942bf401482d90d2fcb5cb7fdda12262518c0bc88753</originalsourceid><addsrcrecordid>eNp1kMtOwzAQRS0EEqXwDxarskjxIw-nu8oqtFJREJS15dgOTZXGxU6Q-vc4atUdsxlpdO_MnQPAI0ZTjFL8PJl_8sUTL6Y4j2mUsZRMEUKYkOwKjC6zazBCGaVRTtP4Ftx5vwuaOM2TEXjnW2k93GyNdccZXO0PTa1kV9vWw8o6yK3vYPFrnOtb-GG8kU5tYd3C5VE7q6QrbQvfzLc8OLszqvP34KaSjTcP5z4GXy-LDV9G6-J1xefrSMYx7qI0IZpSarSJS8kYzjQxIS8pqzhEY0TnSJNKlYkqs0prGV5KSYKZQqViLEvoGExOe8Phn974Tuxrr0zTyNbY3gvMsjwUwzhIZyepctZ7ZypxcPVeuqPASAwYhRgwCl6IAZkYkIkzxmBOT2YZtoud7V0b3ro4_zf-AVb9dv0</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1879999811</pqid></control><display><type>article</type><title>Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects</title><source>American Society of Civil Engineers:NESLI2:Journals:2014</source><creator>Olaniran, O. J ; Love, P. E. D ; Edwards, D. J ; Olatunji, O ; Matthews, J</creator><creatorcontrib>Olaniran, O. J ; Love, P. E. D ; Edwards, D. J ; Olatunji, O ; Matthews, J</creatorcontrib><description>AbstractCost overruns are a recurrent problem in hydrocarbon (oil and gas) megaprojects. An understanding of why and how they occur is needed if they are to be mitigated; such knowledge can provide managers with the foundations to develop techniques to reduce and contain their negative impacts on a project’s performance. This paper examines the nature of cost overruns in hydrocarbon megaprojects using the theoretical lens of chaos theory. The underlying principles of chaos theory are reviewed and its research implications for examining cost overruns identified. By viewing megaprojects as chaotic or dynamic systems, the industry and research community may be better positioned to develop innovative solutions to mitigate cost overrun occurrence.</description><identifier>ISSN: 0733-9364</identifier><identifier>EISSN: 1943-7862</identifier><identifier>DOI: 10.1061/(ASCE)CO.1943-7862.0001227</identifier><language>eng</language><publisher>American Society of Civil Engineers</publisher><subject>Case Studies ; Case Study ; Chaos theory ; Communities ; Construction engineering ; Dynamical systems ; Foundations ; Hydrocarbons ; Management ; Natural gas</subject><ispartof>Journal of construction engineering and management, 2017-02, Vol.143 (2)</ispartof><rights>2016 American Society of Civil Engineers</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a441t-652d333ede4ba8817d2e1942bf401482d90d2fcb5cb7fdda12262518c0bc88753</citedby><cites>FETCH-LOGICAL-a441t-652d333ede4ba8817d2e1942bf401482d90d2fcb5cb7fdda12262518c0bc88753</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)CO.1943-7862.0001227$$EPDF$$P50$$Gasce$$H</linktopdf><linktohtml>$$Uhttp://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0001227$$EHTML$$P50$$Gasce$$H</linktohtml><link.rule.ids>314,776,780,27901,27902,75935,75943</link.rule.ids></links><search><creatorcontrib>Olaniran, O. J</creatorcontrib><creatorcontrib>Love, P. E. D</creatorcontrib><creatorcontrib>Edwards, D. J</creatorcontrib><creatorcontrib>Olatunji, O</creatorcontrib><creatorcontrib>Matthews, J</creatorcontrib><title>Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects</title><title>Journal of construction engineering and management</title><description>AbstractCost overruns are a recurrent problem in hydrocarbon (oil and gas) megaprojects. An understanding of why and how they occur is needed if they are to be mitigated; such knowledge can provide managers with the foundations to develop techniques to reduce and contain their negative impacts on a project’s performance. This paper examines the nature of cost overruns in hydrocarbon megaprojects using the theoretical lens of chaos theory. The underlying principles of chaos theory are reviewed and its research implications for examining cost overruns identified. By viewing megaprojects as chaotic or dynamic systems, the industry and research community may be better positioned to develop innovative solutions to mitigate cost overrun occurrence.</description><subject>Case Studies</subject><subject>Case Study</subject><subject>Chaos theory</subject><subject>Communities</subject><subject>Construction engineering</subject><subject>Dynamical systems</subject><subject>Foundations</subject><subject>Hydrocarbons</subject><subject>Management</subject><subject>Natural gas</subject><issn>0733-9364</issn><issn>1943-7862</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2017</creationdate><recordtype>article</recordtype><recordid>eNp1kMtOwzAQRS0EEqXwDxarskjxIw-nu8oqtFJREJS15dgOTZXGxU6Q-vc4atUdsxlpdO_MnQPAI0ZTjFL8PJl_8sUTL6Y4j2mUsZRMEUKYkOwKjC6zazBCGaVRTtP4Ftx5vwuaOM2TEXjnW2k93GyNdccZXO0PTa1kV9vWw8o6yK3vYPFrnOtb-GG8kU5tYd3C5VE7q6QrbQvfzLc8OLszqvP34KaSjTcP5z4GXy-LDV9G6-J1xefrSMYx7qI0IZpSarSJS8kYzjQxIS8pqzhEY0TnSJNKlYkqs0prGV5KSYKZQqViLEvoGExOe8Phn974Tuxrr0zTyNbY3gvMsjwUwzhIZyepctZ7ZypxcPVeuqPASAwYhRgwCl6IAZkYkIkzxmBOT2YZtoud7V0b3ro4_zf-AVb9dv0</recordid><startdate>20170201</startdate><enddate>20170201</enddate><creator>Olaniran, O. J</creator><creator>Love, P. E. D</creator><creator>Edwards, D. J</creator><creator>Olatunji, O</creator><creator>Matthews, J</creator><general>American Society of Civil Engineers</general><scope>AAYXX</scope><scope>CITATION</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>KR7</scope></search><sort><creationdate>20170201</creationdate><title>Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects</title><author>Olaniran, O. J ; Love, P. E. D ; Edwards, D. J ; Olatunji, O ; Matthews, J</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a441t-652d333ede4ba8817d2e1942bf401482d90d2fcb5cb7fdda12262518c0bc88753</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2017</creationdate><topic>Case Studies</topic><topic>Case Study</topic><topic>Chaos theory</topic><topic>Communities</topic><topic>Construction engineering</topic><topic>Dynamical systems</topic><topic>Foundations</topic><topic>Hydrocarbons</topic><topic>Management</topic><topic>Natural gas</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Olaniran, O. J</creatorcontrib><creatorcontrib>Love, P. E. D</creatorcontrib><creatorcontrib>Edwards, D. J</creatorcontrib><creatorcontrib>Olatunji, O</creatorcontrib><creatorcontrib>Matthews, J</creatorcontrib><collection>CrossRef</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology & Engineering</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of construction engineering and management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Olaniran, O. J</au><au>Love, P. E. D</au><au>Edwards, D. J</au><au>Olatunji, O</au><au>Matthews, J</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects</atitle><jtitle>Journal of construction engineering and management</jtitle><date>2017-02-01</date><risdate>2017</risdate><volume>143</volume><issue>2</issue><issn>0733-9364</issn><eissn>1943-7862</eissn><abstract>AbstractCost overruns are a recurrent problem in hydrocarbon (oil and gas) megaprojects. An understanding of why and how they occur is needed if they are to be mitigated; such knowledge can provide managers with the foundations to develop techniques to reduce and contain their negative impacts on a project’s performance. This paper examines the nature of cost overruns in hydrocarbon megaprojects using the theoretical lens of chaos theory. The underlying principles of chaos theory are reviewed and its research implications for examining cost overruns identified. By viewing megaprojects as chaotic or dynamic systems, the industry and research community may be better positioned to develop innovative solutions to mitigate cost overrun occurrence.</abstract><pub>American Society of Civil Engineers</pub><doi>10.1061/(ASCE)CO.1943-7862.0001227</doi><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0733-9364 |
ispartof | Journal of construction engineering and management, 2017-02, Vol.143 (2) |
issn | 0733-9364 1943-7862 |
language | eng |
recordid | cdi_proquest_miscellaneous_1879999811 |
source | American Society of Civil Engineers:NESLI2:Journals:2014 |
subjects | Case Studies Case Study Chaos theory Communities Construction engineering Dynamical systems Foundations Hydrocarbons Management Natural gas |
title | Chaos Theory: Implications for Cost Overrun Research in Hydrocarbon Megaprojects |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-12T20%3A15%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Chaos%20Theory:%20Implications%20for%20Cost%20Overrun%20Research%20in%20Hydrocarbon%20Megaprojects&rft.jtitle=Journal%20of%20construction%20engineering%20and%20management&rft.au=Olaniran,%20O.%20J&rft.date=2017-02-01&rft.volume=143&rft.issue=2&rft.issn=0733-9364&rft.eissn=1943-7862&rft_id=info:doi/10.1061/(ASCE)CO.1943-7862.0001227&rft_dat=%3Cproquest_cross%3E1879999811%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1879999811&rft_id=info:pmid/&rfr_iscdi=true |