A comparison of two exact methods for passenger railway rolling stock (re)scheduling

•A new method for the rolling stock (re)scheduling problem is introduced.•This approach keeps track of the location of units within a composition.•To speed up the process, row generation techniques are explored.•A comparison is made to a well-known existing model.•Realistic tests are performed on in...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Transportation research. Part E, Logistics and transportation review Logistics and transportation review, 2016-07, Vol.91, p.15-32
Hauptverfasser: Haahr, Jørgen T., Wagenaar, Joris C., Veelenturf, Lucas P., Kroon, Leo G.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!