The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation

Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random variables govern the system, which causes uncertainty in the supply of raw materials: uncertainty in k...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of the South African Institute of Mining and Metallurgy 2016-03, Vol.116 (2)
Hauptverfasser: Soleymani Shishvan, M., Benndorf, J.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 2
container_start_page
container_title Journal of the South African Institute of Mining and Metallurgy
container_volume 116
creator Soleymani Shishvan, M.
Benndorf, J.
description Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random variables govern the system, which causes uncertainty in the supply of raw materials: uncertainty in knowledge about the reserve, the quantity demanded by the customers, and the breakdown of equipment. This paper presents a stochastic-based mine process simulator capturing different sources of uncertainties. It aims to quantify the effect of geological uncertainty and its impacts on the ability to deliver contractually defined quantities and qualities of coal, and on the system efficiency in terms of utilization of major equipment. Two different areas of research are combined: geostatistical simulation for capturing geological uncertainty, and stochastic process simulation to predict the performance and reliability of a large continuous mining system. The process of modelling and simulation in this specific production environment is discussed in detail. Problem specification and a new integrated simulation approach are presented. A case study in a large coal mine is used to demonstrate the impacts and evaluate the results in terms of reaching optimal production control decisions to increase average equipment utilization and control coal quality and quantity. The new approach is expected to lead to more robust decisions, improved efficiencies, and better coal quality management.
doi_str_mv 10.17159/2411-9717/2016/v116n3a7
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1815995655</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1815995655</sourcerecordid><originalsourceid>FETCH-LOGICAL-c381t-c17964573ce2c2b9d2df57da920b45648d00734c6de3df63908318ea94274ab33</originalsourceid><addsrcrecordid>eNpNkE1PwzAMhiMEEmPwH3LkUpY0adNwmya-pElcxjnKUrcN6pItSSftyD-n2wBxsmU_r2U9CGFKHqighZzlnNJMCipmOaHlbE9p6ZgWF2jyt7n811-jmxg_CeGESjZBX6sOMDQNmIR9g1vwvW-t0T0enIGQtHXpgL3D2nQW9ta1OHY-pCxB2OCkQwspPuI53g3aJZt0snvAersNfkzgIZ4SyZtOx2QNHucGYsTRboZ-hL27RVeN7iPc_dQp-nh-Wi1es-X7y9tivswMq2jKDBWy5IVgBnKTr2Wd100hai1zsuZFyauaEMG4KWtgdVMySSpGK9CS54LrNWNTdH--O76wGyAmtbHRQN9rB36IilajTVmURTGi1Rk1wccYoFHbYDc6HBQl6mRdHX2qo091tK5-rbNvOs55aQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1815995655</pqid></control><display><type>article</type><title>The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation</title><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Soleymani Shishvan, M. ; Benndorf, J.</creator><creatorcontrib>Soleymani Shishvan, M. ; Benndorf, J.</creatorcontrib><description>Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random variables govern the system, which causes uncertainty in the supply of raw materials: uncertainty in knowledge about the reserve, the quantity demanded by the customers, and the breakdown of equipment. This paper presents a stochastic-based mine process simulator capturing different sources of uncertainties. It aims to quantify the effect of geological uncertainty and its impacts on the ability to deliver contractually defined quantities and qualities of coal, and on the system efficiency in terms of utilization of major equipment. Two different areas of research are combined: geostatistical simulation for capturing geological uncertainty, and stochastic process simulation to predict the performance and reliability of a large continuous mining system. The process of modelling and simulation in this specific production environment is discussed in detail. Problem specification and a new integrated simulation approach are presented. A case study in a large coal mine is used to demonstrate the impacts and evaluate the results in terms of reaching optimal production control decisions to increase average equipment utilization and control coal quality and quantity. The new approach is expected to lead to more robust decisions, improved efficiencies, and better coal quality management.</description><identifier>ISSN: 2411-9717</identifier><identifier>ISSN: 0038-223X</identifier><identifier>EISSN: 2411-9717</identifier><identifier>DOI: 10.17159/2411-9717/2016/v116n3a7</identifier><language>eng</language><subject>Coal ; Coal mines ; Computer simulation ; Decisions ; Geology ; Mining ; Raw materials ; Uncertainty</subject><ispartof>Journal of the South African Institute of Mining and Metallurgy, 2016-03, Vol.116 (2)</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c381t-c17964573ce2c2b9d2df57da920b45648d00734c6de3df63908318ea94274ab33</citedby></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,778,782,27907,27908</link.rule.ids></links><search><creatorcontrib>Soleymani Shishvan, M.</creatorcontrib><creatorcontrib>Benndorf, J.</creatorcontrib><title>The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation</title><title>Journal of the South African Institute of Mining and Metallurgy</title><description>Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random variables govern the system, which causes uncertainty in the supply of raw materials: uncertainty in knowledge about the reserve, the quantity demanded by the customers, and the breakdown of equipment. This paper presents a stochastic-based mine process simulator capturing different sources of uncertainties. It aims to quantify the effect of geological uncertainty and its impacts on the ability to deliver contractually defined quantities and qualities of coal, and on the system efficiency in terms of utilization of major equipment. Two different areas of research are combined: geostatistical simulation for capturing geological uncertainty, and stochastic process simulation to predict the performance and reliability of a large continuous mining system. The process of modelling and simulation in this specific production environment is discussed in detail. Problem specification and a new integrated simulation approach are presented. A case study in a large coal mine is used to demonstrate the impacts and evaluate the results in terms of reaching optimal production control decisions to increase average equipment utilization and control coal quality and quantity. The new approach is expected to lead to more robust decisions, improved efficiencies, and better coal quality management.</description><subject>Coal</subject><subject>Coal mines</subject><subject>Computer simulation</subject><subject>Decisions</subject><subject>Geology</subject><subject>Mining</subject><subject>Raw materials</subject><subject>Uncertainty</subject><issn>2411-9717</issn><issn>0038-223X</issn><issn>2411-9717</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><recordid>eNpNkE1PwzAMhiMEEmPwH3LkUpY0adNwmya-pElcxjnKUrcN6pItSSftyD-n2wBxsmU_r2U9CGFKHqighZzlnNJMCipmOaHlbE9p6ZgWF2jyt7n811-jmxg_CeGESjZBX6sOMDQNmIR9g1vwvW-t0T0enIGQtHXpgL3D2nQW9ta1OHY-pCxB2OCkQwspPuI53g3aJZt0snvAersNfkzgIZ4SyZtOx2QNHucGYsTRboZ-hL27RVeN7iPc_dQp-nh-Wi1es-X7y9tivswMq2jKDBWy5IVgBnKTr2Wd100hai1zsuZFyauaEMG4KWtgdVMySSpGK9CS54LrNWNTdH--O76wGyAmtbHRQN9rB36IilajTVmURTGi1Rk1wccYoFHbYDc6HBQl6mRdHX2qo091tK5-rbNvOs55aQ</recordid><startdate>20160301</startdate><enddate>20160301</enddate><creator>Soleymani Shishvan, M.</creator><creator>Benndorf, J.</creator><scope>AAYXX</scope><scope>CITATION</scope><scope>8BQ</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>20160301</creationdate><title>The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation</title><author>Soleymani Shishvan, M. ; Benndorf, J.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c381t-c17964573ce2c2b9d2df57da920b45648d00734c6de3df63908318ea94274ab33</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2016</creationdate><topic>Coal</topic><topic>Coal mines</topic><topic>Computer simulation</topic><topic>Decisions</topic><topic>Geology</topic><topic>Mining</topic><topic>Raw materials</topic><topic>Uncertainty</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Soleymani Shishvan, M.</creatorcontrib><creatorcontrib>Benndorf, J.</creatorcontrib><collection>CrossRef</collection><collection>METADEX</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>Journal of the South African Institute of Mining and Metallurgy</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Soleymani Shishvan, M.</au><au>Benndorf, J.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation</atitle><jtitle>Journal of the South African Institute of Mining and Metallurgy</jtitle><date>2016-03-01</date><risdate>2016</risdate><volume>116</volume><issue>2</issue><issn>2411-9717</issn><issn>0038-223X</issn><eissn>2411-9717</eissn><abstract>Continuous mining systems containing multiple excavators producing multiple products of raw materials are highly complex, exhibiting strong interdependency between constituents. Furthermore, random variables govern the system, which causes uncertainty in the supply of raw materials: uncertainty in knowledge about the reserve, the quantity demanded by the customers, and the breakdown of equipment. This paper presents a stochastic-based mine process simulator capturing different sources of uncertainties. It aims to quantify the effect of geological uncertainty and its impacts on the ability to deliver contractually defined quantities and qualities of coal, and on the system efficiency in terms of utilization of major equipment. Two different areas of research are combined: geostatistical simulation for capturing geological uncertainty, and stochastic process simulation to predict the performance and reliability of a large continuous mining system. The process of modelling and simulation in this specific production environment is discussed in detail. Problem specification and a new integrated simulation approach are presented. A case study in a large coal mine is used to demonstrate the impacts and evaluate the results in terms of reaching optimal production control decisions to increase average equipment utilization and control coal quality and quantity. The new approach is expected to lead to more robust decisions, improved efficiencies, and better coal quality management.</abstract><doi>10.17159/2411-9717/2016/v116n3a7</doi><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2411-9717
ispartof Journal of the South African Institute of Mining and Metallurgy, 2016-03, Vol.116 (2)
issn 2411-9717
0038-223X
2411-9717
language eng
recordid cdi_proquest_miscellaneous_1815995655
source Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals
subjects Coal
Coal mines
Computer simulation
Decisions
Geology
Mining
Raw materials
Uncertainty
title The effect of geological uncertainty on achieving short-term targets: A quantitative approach using stochastic process simulation
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T15%3A45%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20effect%20of%20geological%20uncertainty%20on%20achieving%20short-term%20targets:%20A%20quantitative%20approach%20using%20stochastic%20process%20simulation&rft.jtitle=Journal%20of%20the%20South%20African%20Institute%20of%20Mining%20and%20Metallurgy&rft.au=Soleymani%20Shishvan,%20M.&rft.date=2016-03-01&rft.volume=116&rft.issue=2&rft.issn=2411-9717&rft.eissn=2411-9717&rft_id=info:doi/10.17159/2411-9717/2016/v116n3a7&rft_dat=%3Cproquest_cross%3E1815995655%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1815995655&rft_id=info:pmid/&rfr_iscdi=true