Gotthard Base Tunnel - Choice of the tunnel system from today's point of view

The historic rail tunnels in the Alps were consistently built in the form of single-tube twin-track tunnels, starting with the Mont Cenis Tunnel (1871). Only the 19.8 km long Simplon Tunnel at the start of the 20th century was built with two separate single-track tunnels. In 1988, the 53.8 km long S...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Geomechanik und Tunnelbau 2016-04, Vol.9 (2), p.79-93
Hauptverfasser: Vetsch, Hans-Peter, Zbinden, Peter, Maerki, Ernst, Ehrbar, Heinz
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!