A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards

This article presents a novel matheuristic for solving the hump yard block‐to‐track assignment problem. This is an important problem arising in the railway freight industry and involves scheduling the transitions of a set of rail cars from a set of inbound trains to a set of outbound trains over a c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Networks 2016-03, Vol.67 (2), p.126-138
Hauptverfasser: Haahr, Jørgen Thorlund, Lusby, Richard Martin
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 138
container_issue 2
container_start_page 126
container_title Networks
container_volume 67
creator Haahr, Jørgen Thorlund
Lusby, Richard Martin
description This article presents a novel matheuristic for solving the hump yard block‐to‐track assignment problem. This is an important problem arising in the railway freight industry and involves scheduling the transitions of a set of rail cars from a set of inbound trains to a set of outbound trains over a certain planning horizon. It was also the topic of the 2014 challenge organized by the Railway Applications Section of the Institute for Operations Research and the Management Sciences for which the proposed matheuristic was awarded first prize. Our approach decomposes the problem into three highly dependent subproblems. Optimization‐based strategies are adopted for two of these, while the third is solved using a greedy heuristic. We demonstrate the efficiency of the complete framework on the official datasets, where solutions within 4–14% of a known lower bound (to a relaxed problem) are found. We further show that improvements of around 8% can be achieved if outbound trains are allowed to be delayed by up to 2 h in the hope of ensuring an earlier connection for some of the rail cars. © 2015 Wiley Periodicals, Inc. NETWORKS, Vol. 67(2), 126–138 2016
doi_str_mv 10.1002/net.21665
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1800491443</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>3945434261</sourcerecordid><originalsourceid>FETCH-LOGICAL-c4565-ee5fb4f0e3b35895a0a989fcfb6989f1c5e54fe8e1aa2cc29558d565846e22953</originalsourceid><addsrcrecordid>eNp1kLlOAzEQhi0EEuEoeANLNFAs2F57jzIK4RARpABBZzneWWLYC9sryNvjZIECiWo04-8bjX-Ejig5o4Sw8wb8GaNJIrbQiJI8jQiJ0200Cm9ZFBMudtGec6-EUCpoNkIwxrXyS-itcd5orLrOtkovsW-xaTy8WOUBL_u6M80LVk2Bu76q2t5jB-89NHo9bjsImGkbh5XHVpkq7Cg2Fl4pW7gDtFOqysHhd91Hj5fTh8l1NLu_upmMZ5HmIhERgCgXvCQQL2KR5UIRlWd5qctFsq5UCxC8hAyoUkxrlguRFUHMeAIsdPE-Ohn2hk-E65yXtXEaqko10PZO0owQnlPO44Ae_0Ff29424TpJ04TlnPGcBep0oLRtnbNQys6aWtmVpESuA5chcLkJPLDnA_thKlj9D8q76cOPEQ1GyB4-fw1l32SSxqmQT3dXcn4xeb6dzJnk8Re8yJJD</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1762942492</pqid></control><display><type>article</type><title>A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards</title><source>Access via Wiley Online Library</source><creator>Haahr, Jørgen Thorlund ; Lusby, Richard Martin</creator><creatorcontrib>Haahr, Jørgen Thorlund ; Lusby, Richard Martin</creatorcontrib><description>This article presents a novel matheuristic for solving the hump yard block‐to‐track assignment problem. This is an important problem arising in the railway freight industry and involves scheduling the transitions of a set of rail cars from a set of inbound trains to a set of outbound trains over a certain planning horizon. It was also the topic of the 2014 challenge organized by the Railway Applications Section of the Institute for Operations Research and the Management Sciences for which the proposed matheuristic was awarded first prize. Our approach decomposes the problem into three highly dependent subproblems. Optimization‐based strategies are adopted for two of these, while the third is solved using a greedy heuristic. We demonstrate the efficiency of the complete framework on the official datasets, where solutions within 4–14% of a known lower bound (to a relaxed problem) are found. We further show that improvements of around 8% can be achieved if outbound trains are allowed to be delayed by up to 2 h in the hope of ensuring an earlier connection for some of the rail cars. © 2015 Wiley Periodicals, Inc. NETWORKS, Vol. 67(2), 126–138 2016</description><identifier>ISSN: 0028-3045</identifier><identifier>EISSN: 1097-0037</identifier><identifier>DOI: 10.1002/net.21665</identifier><identifier>CODEN: NTWKAA</identifier><language>eng</language><publisher>New York: Blackwell Publishing Ltd</publisher><subject>block-to-track assignment ; freight train Optimization ; Freight trains ; hump yard optimization ; matheuristic ; mixed integer programming ; Networks ; Operations research ; Railroad cars ; Railroad engineering ; Rails ; Railways ; rolling horizon ; Trains</subject><ispartof>Networks, 2016-03, Vol.67 (2), p.126-138</ispartof><rights>2015 Wiley Periodicals, Inc.</rights><rights>2016 Wiley Periodicals, Inc.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c4565-ee5fb4f0e3b35895a0a989fcfb6989f1c5e54fe8e1aa2cc29558d565846e22953</citedby><cites>FETCH-LOGICAL-c4565-ee5fb4f0e3b35895a0a989fcfb6989f1c5e54fe8e1aa2cc29558d565846e22953</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://onlinelibrary.wiley.com/doi/pdf/10.1002%2Fnet.21665$$EPDF$$P50$$Gwiley$$H</linktopdf><linktohtml>$$Uhttps://onlinelibrary.wiley.com/doi/full/10.1002%2Fnet.21665$$EHTML$$P50$$Gwiley$$H</linktohtml><link.rule.ids>314,780,784,1417,27924,27925,45574,45575</link.rule.ids></links><search><creatorcontrib>Haahr, Jørgen Thorlund</creatorcontrib><creatorcontrib>Lusby, Richard Martin</creatorcontrib><title>A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards</title><title>Networks</title><addtitle>NETWORKS</addtitle><description>This article presents a novel matheuristic for solving the hump yard block‐to‐track assignment problem. This is an important problem arising in the railway freight industry and involves scheduling the transitions of a set of rail cars from a set of inbound trains to a set of outbound trains over a certain planning horizon. It was also the topic of the 2014 challenge organized by the Railway Applications Section of the Institute for Operations Research and the Management Sciences for which the proposed matheuristic was awarded first prize. Our approach decomposes the problem into three highly dependent subproblems. Optimization‐based strategies are adopted for two of these, while the third is solved using a greedy heuristic. We demonstrate the efficiency of the complete framework on the official datasets, where solutions within 4–14% of a known lower bound (to a relaxed problem) are found. We further show that improvements of around 8% can be achieved if outbound trains are allowed to be delayed by up to 2 h in the hope of ensuring an earlier connection for some of the rail cars. © 2015 Wiley Periodicals, Inc. NETWORKS, Vol. 67(2), 126–138 2016</description><subject>block-to-track assignment</subject><subject>freight train Optimization</subject><subject>Freight trains</subject><subject>hump yard optimization</subject><subject>matheuristic</subject><subject>mixed integer programming</subject><subject>Networks</subject><subject>Operations research</subject><subject>Railroad cars</subject><subject>Railroad engineering</subject><subject>Rails</subject><subject>Railways</subject><subject>rolling horizon</subject><subject>Trains</subject><issn>0028-3045</issn><issn>1097-0037</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2016</creationdate><recordtype>article</recordtype><recordid>eNp1kLlOAzEQhi0EEuEoeANLNFAs2F57jzIK4RARpABBZzneWWLYC9sryNvjZIECiWo04-8bjX-Ejig5o4Sw8wb8GaNJIrbQiJI8jQiJ0200Cm9ZFBMudtGec6-EUCpoNkIwxrXyS-itcd5orLrOtkovsW-xaTy8WOUBL_u6M80LVk2Bu76q2t5jB-89NHo9bjsImGkbh5XHVpkq7Cg2Fl4pW7gDtFOqysHhd91Hj5fTh8l1NLu_upmMZ5HmIhERgCgXvCQQL2KR5UIRlWd5qctFsq5UCxC8hAyoUkxrlguRFUHMeAIsdPE-Ohn2hk-E65yXtXEaqko10PZO0owQnlPO44Ae_0Ff29424TpJ04TlnPGcBep0oLRtnbNQys6aWtmVpESuA5chcLkJPLDnA_thKlj9D8q76cOPEQ1GyB4-fw1l32SSxqmQT3dXcn4xeb6dzJnk8Re8yJJD</recordid><startdate>201603</startdate><enddate>201603</enddate><creator>Haahr, Jørgen Thorlund</creator><creator>Lusby, Richard Martin</creator><general>Blackwell Publishing Ltd</general><general>Wiley Subscription Services, Inc</general><scope>BSCLL</scope><scope>AAYXX</scope><scope>CITATION</scope><scope>7SC</scope><scope>8FD</scope><scope>JQ2</scope><scope>L7M</scope><scope>L~C</scope><scope>L~D</scope></search><sort><creationdate>201603</creationdate><title>A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards</title><author>Haahr, Jørgen Thorlund ; Lusby, Richard Martin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c4565-ee5fb4f0e3b35895a0a989fcfb6989f1c5e54fe8e1aa2cc29558d565846e22953</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2016</creationdate><topic>block-to-track assignment</topic><topic>freight train Optimization</topic><topic>Freight trains</topic><topic>hump yard optimization</topic><topic>matheuristic</topic><topic>mixed integer programming</topic><topic>Networks</topic><topic>Operations research</topic><topic>Railroad cars</topic><topic>Railroad engineering</topic><topic>Rails</topic><topic>Railways</topic><topic>rolling horizon</topic><topic>Trains</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Haahr, Jørgen Thorlund</creatorcontrib><creatorcontrib>Lusby, Richard Martin</creatorcontrib><collection>Istex</collection><collection>CrossRef</collection><collection>Computer and Information Systems Abstracts</collection><collection>Technology Research Database</collection><collection>ProQuest Computer Science Collection</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Computer and Information Systems Abstracts – Academic</collection><collection>Computer and Information Systems Abstracts Professional</collection><jtitle>Networks</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Haahr, Jørgen Thorlund</au><au>Lusby, Richard Martin</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards</atitle><jtitle>Networks</jtitle><addtitle>NETWORKS</addtitle><date>2016-03</date><risdate>2016</risdate><volume>67</volume><issue>2</issue><spage>126</spage><epage>138</epage><pages>126-138</pages><issn>0028-3045</issn><eissn>1097-0037</eissn><coden>NTWKAA</coden><abstract>This article presents a novel matheuristic for solving the hump yard block‐to‐track assignment problem. This is an important problem arising in the railway freight industry and involves scheduling the transitions of a set of rail cars from a set of inbound trains to a set of outbound trains over a certain planning horizon. It was also the topic of the 2014 challenge organized by the Railway Applications Section of the Institute for Operations Research and the Management Sciences for which the proposed matheuristic was awarded first prize. Our approach decomposes the problem into three highly dependent subproblems. Optimization‐based strategies are adopted for two of these, while the third is solved using a greedy heuristic. We demonstrate the efficiency of the complete framework on the official datasets, where solutions within 4–14% of a known lower bound (to a relaxed problem) are found. We further show that improvements of around 8% can be achieved if outbound trains are allowed to be delayed by up to 2 h in the hope of ensuring an earlier connection for some of the rail cars. © 2015 Wiley Periodicals, Inc. NETWORKS, Vol. 67(2), 126–138 2016</abstract><cop>New York</cop><pub>Blackwell Publishing Ltd</pub><doi>10.1002/net.21665</doi><tpages>13</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0028-3045
ispartof Networks, 2016-03, Vol.67 (2), p.126-138
issn 0028-3045
1097-0037
language eng
recordid cdi_proquest_miscellaneous_1800491443
source Access via Wiley Online Library
subjects block-to-track assignment
freight train Optimization
Freight trains
hump yard optimization
matheuristic
mixed integer programming
Networks
Operations research
Railroad cars
Railroad engineering
Rails
Railways
rolling horizon
Trains
title A matheuristic approach to integrate humping and pullout sequencing operations at railroad hump yards
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T22%3A10%3A24IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=A%20matheuristic%20approach%20to%20integrate%20humping%20and%20pullout%20sequencing%20operations%20at%20railroad%20hump%20yards&rft.jtitle=Networks&rft.au=Haahr,%20J%C3%B8rgen%20Thorlund&rft.date=2016-03&rft.volume=67&rft.issue=2&rft.spage=126&rft.epage=138&rft.pages=126-138&rft.issn=0028-3045&rft.eissn=1097-0037&rft.coden=NTWKAA&rft_id=info:doi/10.1002/net.21665&rft_dat=%3Cproquest_cross%3E3945434261%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1762942492&rft_id=info:pmid/&rfr_iscdi=true