Experimental Study of Pulsed Removal of Insoluble Fragments of a Simulator of the Fuel Elements of Spent Fuel Assemblies from a Batch Apparatus

The lead operation in the reprocessing of spent fuel assemblies at the RT-1 plant is leaching fuel, which is done in batch, semicontinuous and continuous regimes depending on the technology and equipment [14]. In the batch regime, fragments of length 2040 mm containing the fuel-element cladding meta...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Atomic energy (New York, N.Y.) N.Y.), 2014-10, Vol.116 (6), p.443-447
Hauptverfasser: Istomin, V. L., Khlebus, K. A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!