Experience with the commissioning of the superconducting stellarator Wendelstein 7-X
•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned. The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Ger...
Gespeichert in:
Veröffentlicht in: | Fusion engineering and design 2015-10, Vol.96-97, p.22-27 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 27 |
---|---|
container_issue | |
container_start_page | 22 |
container_title | Fusion engineering and design |
container_volume | 96-97 |
creator | Bosch, Hans-Stephan Bykov, V. Brakel, R. van Eeten, P. Feist, J.-H. Gasparotto, M. Grote, H. Klinger, T. Nagel, M. Naujoks, D. Neilson, G.H. Rummel, T. Schacht, J. Vilbrandt, R. Wegener, L. Werner, A. |
description | •Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned.
The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe. |
doi_str_mv | 10.1016/j.fusengdes.2015.05.010 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1786182549</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0920379615003087</els_id><sourcerecordid>1786182549</sourcerecordid><originalsourceid>FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</originalsourceid><addsrcrecordid>eNqFUMtKAzEUDaJgrX6Ds3QzYzKZPGZZSn1AwY2iu5Dm0aZMJzXJ-Ph7M624FQ5c7uGcy7kHgGsEKwQRvd1WdoimX2sTqxoiUsEMBE_ABHGGS4ZaegomsK1hiVlLz8FFjFsIEcuYgOfF194EZ3plik-XNkXamEL53c7F6Hzv-nXh7YGMQxYq3-tBpZGOyXSdDDL5ULyaXpsuM64vWPl2Cc6s7KK5-p1T8HK3eJ4_lMun-8f5bFmqhrJUaqkt0ZJbKimxzBKCmlWtNSeEM0qQamqKOaZ51zKLVlhiWsO6VRhiwjWegpvj3X3w74OJSeTYaozVGz9EgRiniNekabOUHaUq-BiDsWIf3E6Gb4GgGHsUW_HXoxh7FDADweycHZ35QfPhTBBRHfrSLhiVhPbu3xs_3pGBRw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1786182549</pqid></control><display><type>article</type><title>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</title><source>Elsevier ScienceDirect Journals</source><creator>Bosch, Hans-Stephan ; Bykov, V. ; Brakel, R. ; van Eeten, P. ; Feist, J.-H. ; Gasparotto, M. ; Grote, H. ; Klinger, T. ; Nagel, M. ; Naujoks, D. ; Neilson, G.H. ; Rummel, T. ; Schacht, J. ; Vilbrandt, R. ; Wegener, L. ; Werner, A.</creator><creatorcontrib>Bosch, Hans-Stephan ; Bykov, V. ; Brakel, R. ; van Eeten, P. ; Feist, J.-H. ; Gasparotto, M. ; Grote, H. ; Klinger, T. ; Nagel, M. ; Naujoks, D. ; Neilson, G.H. ; Rummel, T. ; Schacht, J. ; Vilbrandt, R. ; Wegener, L. ; Werner, A.</creatorcontrib><description>•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned.
The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.</description><identifier>ISSN: 0920-3796</identifier><identifier>EISSN: 1873-7196</identifier><identifier>DOI: 10.1016/j.fusengdes.2015.05.010</identifier><language>eng</language><publisher>Elsevier B.V</publisher><subject>Assembly ; Commissioning ; Design engineering ; Devices ; Diagnostic systems ; Heating systems ; Stellarator ; Stellarators ; Superconductivity ; Wendelstein 7-X</subject><ispartof>Fusion engineering and design, 2015-10, Vol.96-97, p.22-27</ispartof><rights>2015 Elsevier B.V.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</citedby><cites>FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0920379615003087$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Bosch, Hans-Stephan</creatorcontrib><creatorcontrib>Bykov, V.</creatorcontrib><creatorcontrib>Brakel, R.</creatorcontrib><creatorcontrib>van Eeten, P.</creatorcontrib><creatorcontrib>Feist, J.-H.</creatorcontrib><creatorcontrib>Gasparotto, M.</creatorcontrib><creatorcontrib>Grote, H.</creatorcontrib><creatorcontrib>Klinger, T.</creatorcontrib><creatorcontrib>Nagel, M.</creatorcontrib><creatorcontrib>Naujoks, D.</creatorcontrib><creatorcontrib>Neilson, G.H.</creatorcontrib><creatorcontrib>Rummel, T.</creatorcontrib><creatorcontrib>Schacht, J.</creatorcontrib><creatorcontrib>Vilbrandt, R.</creatorcontrib><creatorcontrib>Wegener, L.</creatorcontrib><creatorcontrib>Werner, A.</creatorcontrib><title>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</title><title>Fusion engineering and design</title><description>•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned.
The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.</description><subject>Assembly</subject><subject>Commissioning</subject><subject>Design engineering</subject><subject>Devices</subject><subject>Diagnostic systems</subject><subject>Heating systems</subject><subject>Stellarator</subject><subject>Stellarators</subject><subject>Superconductivity</subject><subject>Wendelstein 7-X</subject><issn>0920-3796</issn><issn>1873-7196</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNqFUMtKAzEUDaJgrX6Ds3QzYzKZPGZZSn1AwY2iu5Dm0aZMJzXJ-Ph7M624FQ5c7uGcy7kHgGsEKwQRvd1WdoimX2sTqxoiUsEMBE_ABHGGS4ZaegomsK1hiVlLz8FFjFsIEcuYgOfF194EZ3plik-XNkXamEL53c7F6Hzv-nXh7YGMQxYq3-tBpZGOyXSdDDL5ULyaXpsuM64vWPl2Cc6s7KK5-p1T8HK3eJ4_lMun-8f5bFmqhrJUaqkt0ZJbKimxzBKCmlWtNSeEM0qQamqKOaZ51zKLVlhiWsO6VRhiwjWegpvj3X3w74OJSeTYaozVGz9EgRiniNekabOUHaUq-BiDsWIf3E6Gb4GgGHsUW_HXoxh7FDADweycHZ35QfPhTBBRHfrSLhiVhPbu3xs_3pGBRw</recordid><startdate>20151001</startdate><enddate>20151001</enddate><creator>Bosch, Hans-Stephan</creator><creator>Bykov, V.</creator><creator>Brakel, R.</creator><creator>van Eeten, P.</creator><creator>Feist, J.-H.</creator><creator>Gasparotto, M.</creator><creator>Grote, H.</creator><creator>Klinger, T.</creator><creator>Nagel, M.</creator><creator>Naujoks, D.</creator><creator>Neilson, G.H.</creator><creator>Rummel, T.</creator><creator>Schacht, J.</creator><creator>Vilbrandt, R.</creator><creator>Wegener, L.</creator><creator>Werner, A.</creator><general>Elsevier B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>7U5</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope></search><sort><creationdate>20151001</creationdate><title>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</title><author>Bosch, Hans-Stephan ; Bykov, V. ; Brakel, R. ; van Eeten, P. ; Feist, J.-H. ; Gasparotto, M. ; Grote, H. ; Klinger, T. ; Nagel, M. ; Naujoks, D. ; Neilson, G.H. ; Rummel, T. ; Schacht, J. ; Vilbrandt, R. ; Wegener, L. ; Werner, A.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Assembly</topic><topic>Commissioning</topic><topic>Design engineering</topic><topic>Devices</topic><topic>Diagnostic systems</topic><topic>Heating systems</topic><topic>Stellarator</topic><topic>Stellarators</topic><topic>Superconductivity</topic><topic>Wendelstein 7-X</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Bosch, Hans-Stephan</creatorcontrib><creatorcontrib>Bykov, V.</creatorcontrib><creatorcontrib>Brakel, R.</creatorcontrib><creatorcontrib>van Eeten, P.</creatorcontrib><creatorcontrib>Feist, J.-H.</creatorcontrib><creatorcontrib>Gasparotto, M.</creatorcontrib><creatorcontrib>Grote, H.</creatorcontrib><creatorcontrib>Klinger, T.</creatorcontrib><creatorcontrib>Nagel, M.</creatorcontrib><creatorcontrib>Naujoks, D.</creatorcontrib><creatorcontrib>Neilson, G.H.</creatorcontrib><creatorcontrib>Rummel, T.</creatorcontrib><creatorcontrib>Schacht, J.</creatorcontrib><creatorcontrib>Vilbrandt, R.</creatorcontrib><creatorcontrib>Wegener, L.</creatorcontrib><creatorcontrib>Werner, A.</creatorcontrib><collection>CrossRef</collection><collection>Electronics & Communications Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Solid State and Superconductivity Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Fusion engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Bosch, Hans-Stephan</au><au>Bykov, V.</au><au>Brakel, R.</au><au>van Eeten, P.</au><au>Feist, J.-H.</au><au>Gasparotto, M.</au><au>Grote, H.</au><au>Klinger, T.</au><au>Nagel, M.</au><au>Naujoks, D.</au><au>Neilson, G.H.</au><au>Rummel, T.</au><au>Schacht, J.</au><au>Vilbrandt, R.</au><au>Wegener, L.</au><au>Werner, A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</atitle><jtitle>Fusion engineering and design</jtitle><date>2015-10-01</date><risdate>2015</risdate><volume>96-97</volume><spage>22</spage><epage>27</epage><pages>22-27</pages><issn>0920-3796</issn><eissn>1873-7196</eissn><abstract>•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned.
The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.</abstract><pub>Elsevier B.V</pub><doi>10.1016/j.fusengdes.2015.05.010</doi><tpages>6</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0920-3796 |
ispartof | Fusion engineering and design, 2015-10, Vol.96-97, p.22-27 |
issn | 0920-3796 1873-7196 |
language | eng |
recordid | cdi_proquest_miscellaneous_1786182549 |
source | Elsevier ScienceDirect Journals |
subjects | Assembly Commissioning Design engineering Devices Diagnostic systems Heating systems Stellarator Stellarators Superconductivity Wendelstein 7-X |
title | Experience with the commissioning of the superconducting stellarator Wendelstein 7-X |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T06%3A23%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Experience%20with%20the%20commissioning%20of%20the%20superconducting%20stellarator%20Wendelstein%207-X&rft.jtitle=Fusion%20engineering%20and%20design&rft.au=Bosch,%20Hans-Stephan&rft.date=2015-10-01&rft.volume=96-97&rft.spage=22&rft.epage=27&rft.pages=22-27&rft.issn=0920-3796&rft.eissn=1873-7196&rft_id=info:doi/10.1016/j.fusengdes.2015.05.010&rft_dat=%3Cproquest_cross%3E1786182549%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1786182549&rft_id=info:pmid/&rft_els_id=S0920379615003087&rfr_iscdi=true |