Experience with the commissioning of the superconducting stellarator Wendelstein 7-X

•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned. The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Ger...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Fusion engineering and design 2015-10, Vol.96-97, p.22-27
Hauptverfasser: Bosch, Hans-Stephan, Bykov, V., Brakel, R., van Eeten, P., Feist, J.-H., Gasparotto, M., Grote, H., Klinger, T., Nagel, M., Naujoks, D., Neilson, G.H., Rummel, T., Schacht, J., Vilbrandt, R., Wegener, L., Werner, A.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 27
container_issue
container_start_page 22
container_title Fusion engineering and design
container_volume 96-97
creator Bosch, Hans-Stephan
Bykov, V.
Brakel, R.
van Eeten, P.
Feist, J.-H.
Gasparotto, M.
Grote, H.
Klinger, T.
Nagel, M.
Naujoks, D.
Neilson, G.H.
Rummel, T.
Schacht, J.
Vilbrandt, R.
Wegener, L.
Werner, A.
description •Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned. The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.
doi_str_mv 10.1016/j.fusengdes.2015.05.010
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1786182549</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0920379615003087</els_id><sourcerecordid>1786182549</sourcerecordid><originalsourceid>FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</originalsourceid><addsrcrecordid>eNqFUMtKAzEUDaJgrX6Ds3QzYzKZPGZZSn1AwY2iu5Dm0aZMJzXJ-Ph7M624FQ5c7uGcy7kHgGsEKwQRvd1WdoimX2sTqxoiUsEMBE_ABHGGS4ZaegomsK1hiVlLz8FFjFsIEcuYgOfF194EZ3plik-XNkXamEL53c7F6Hzv-nXh7YGMQxYq3-tBpZGOyXSdDDL5ULyaXpsuM64vWPl2Cc6s7KK5-p1T8HK3eJ4_lMun-8f5bFmqhrJUaqkt0ZJbKimxzBKCmlWtNSeEM0qQamqKOaZ51zKLVlhiWsO6VRhiwjWegpvj3X3w74OJSeTYaozVGz9EgRiniNekabOUHaUq-BiDsWIf3E6Gb4GgGHsUW_HXoxh7FDADweycHZ35QfPhTBBRHfrSLhiVhPbu3xs_3pGBRw</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1786182549</pqid></control><display><type>article</type><title>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</title><source>Elsevier ScienceDirect Journals</source><creator>Bosch, Hans-Stephan ; Bykov, V. ; Brakel, R. ; van Eeten, P. ; Feist, J.-H. ; Gasparotto, M. ; Grote, H. ; Klinger, T. ; Nagel, M. ; Naujoks, D. ; Neilson, G.H. ; Rummel, T. ; Schacht, J. ; Vilbrandt, R. ; Wegener, L. ; Werner, A.</creator><creatorcontrib>Bosch, Hans-Stephan ; Bykov, V. ; Brakel, R. ; van Eeten, P. ; Feist, J.-H. ; Gasparotto, M. ; Grote, H. ; Klinger, T. ; Nagel, M. ; Naujoks, D. ; Neilson, G.H. ; Rummel, T. ; Schacht, J. ; Vilbrandt, R. ; Wegener, L. ; Werner, A.</creatorcontrib><description>•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned. The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.</description><identifier>ISSN: 0920-3796</identifier><identifier>EISSN: 1873-7196</identifier><identifier>DOI: 10.1016/j.fusengdes.2015.05.010</identifier><language>eng</language><publisher>Elsevier B.V</publisher><subject>Assembly ; Commissioning ; Design engineering ; Devices ; Diagnostic systems ; Heating systems ; Stellarator ; Stellarators ; Superconductivity ; Wendelstein 7-X</subject><ispartof>Fusion engineering and design, 2015-10, Vol.96-97, p.22-27</ispartof><rights>2015 Elsevier B.V.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</citedby><cites>FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0920379615003087$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Bosch, Hans-Stephan</creatorcontrib><creatorcontrib>Bykov, V.</creatorcontrib><creatorcontrib>Brakel, R.</creatorcontrib><creatorcontrib>van Eeten, P.</creatorcontrib><creatorcontrib>Feist, J.-H.</creatorcontrib><creatorcontrib>Gasparotto, M.</creatorcontrib><creatorcontrib>Grote, H.</creatorcontrib><creatorcontrib>Klinger, T.</creatorcontrib><creatorcontrib>Nagel, M.</creatorcontrib><creatorcontrib>Naujoks, D.</creatorcontrib><creatorcontrib>Neilson, G.H.</creatorcontrib><creatorcontrib>Rummel, T.</creatorcontrib><creatorcontrib>Schacht, J.</creatorcontrib><creatorcontrib>Vilbrandt, R.</creatorcontrib><creatorcontrib>Wegener, L.</creatorcontrib><creatorcontrib>Werner, A.</creatorcontrib><title>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</title><title>Fusion engineering and design</title><description>•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned. The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.</description><subject>Assembly</subject><subject>Commissioning</subject><subject>Design engineering</subject><subject>Devices</subject><subject>Diagnostic systems</subject><subject>Heating systems</subject><subject>Stellarator</subject><subject>Stellarators</subject><subject>Superconductivity</subject><subject>Wendelstein 7-X</subject><issn>0920-3796</issn><issn>1873-7196</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNqFUMtKAzEUDaJgrX6Ds3QzYzKZPGZZSn1AwY2iu5Dm0aZMJzXJ-Ph7M624FQ5c7uGcy7kHgGsEKwQRvd1WdoimX2sTqxoiUsEMBE_ABHGGS4ZaegomsK1hiVlLz8FFjFsIEcuYgOfF194EZ3plik-XNkXamEL53c7F6Hzv-nXh7YGMQxYq3-tBpZGOyXSdDDL5ULyaXpsuM64vWPl2Cc6s7KK5-p1T8HK3eJ4_lMun-8f5bFmqhrJUaqkt0ZJbKimxzBKCmlWtNSeEM0qQamqKOaZ51zKLVlhiWsO6VRhiwjWegpvj3X3w74OJSeTYaozVGz9EgRiniNekabOUHaUq-BiDsWIf3E6Gb4GgGHsUW_HXoxh7FDADweycHZ35QfPhTBBRHfrSLhiVhPbu3xs_3pGBRw</recordid><startdate>20151001</startdate><enddate>20151001</enddate><creator>Bosch, Hans-Stephan</creator><creator>Bykov, V.</creator><creator>Brakel, R.</creator><creator>van Eeten, P.</creator><creator>Feist, J.-H.</creator><creator>Gasparotto, M.</creator><creator>Grote, H.</creator><creator>Klinger, T.</creator><creator>Nagel, M.</creator><creator>Naujoks, D.</creator><creator>Neilson, G.H.</creator><creator>Rummel, T.</creator><creator>Schacht, J.</creator><creator>Vilbrandt, R.</creator><creator>Wegener, L.</creator><creator>Werner, A.</creator><general>Elsevier B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7SP</scope><scope>7TB</scope><scope>7U5</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>L7M</scope></search><sort><creationdate>20151001</creationdate><title>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</title><author>Bosch, Hans-Stephan ; Bykov, V. ; Brakel, R. ; van Eeten, P. ; Feist, J.-H. ; Gasparotto, M. ; Grote, H. ; Klinger, T. ; Nagel, M. ; Naujoks, D. ; Neilson, G.H. ; Rummel, T. ; Schacht, J. ; Vilbrandt, R. ; Wegener, L. ; Werner, A.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c467t-dadf5da8f6a65f7f5514b2dd85587651c4263836855daf6ab3a362029c30358d3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Assembly</topic><topic>Commissioning</topic><topic>Design engineering</topic><topic>Devices</topic><topic>Diagnostic systems</topic><topic>Heating systems</topic><topic>Stellarator</topic><topic>Stellarators</topic><topic>Superconductivity</topic><topic>Wendelstein 7-X</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Bosch, Hans-Stephan</creatorcontrib><creatorcontrib>Bykov, V.</creatorcontrib><creatorcontrib>Brakel, R.</creatorcontrib><creatorcontrib>van Eeten, P.</creatorcontrib><creatorcontrib>Feist, J.-H.</creatorcontrib><creatorcontrib>Gasparotto, M.</creatorcontrib><creatorcontrib>Grote, H.</creatorcontrib><creatorcontrib>Klinger, T.</creatorcontrib><creatorcontrib>Nagel, M.</creatorcontrib><creatorcontrib>Naujoks, D.</creatorcontrib><creatorcontrib>Neilson, G.H.</creatorcontrib><creatorcontrib>Rummel, T.</creatorcontrib><creatorcontrib>Schacht, J.</creatorcontrib><creatorcontrib>Vilbrandt, R.</creatorcontrib><creatorcontrib>Wegener, L.</creatorcontrib><creatorcontrib>Werner, A.</creatorcontrib><collection>CrossRef</collection><collection>Electronics &amp; Communications Abstracts</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Solid State and Superconductivity Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Fusion engineering and design</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Bosch, Hans-Stephan</au><au>Bykov, V.</au><au>Brakel, R.</au><au>van Eeten, P.</au><au>Feist, J.-H.</au><au>Gasparotto, M.</au><au>Grote, H.</au><au>Klinger, T.</au><au>Nagel, M.</au><au>Naujoks, D.</au><au>Neilson, G.H.</au><au>Rummel, T.</au><au>Schacht, J.</au><au>Vilbrandt, R.</au><au>Wegener, L.</au><au>Werner, A.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Experience with the commissioning of the superconducting stellarator Wendelstein 7-X</atitle><jtitle>Fusion engineering and design</jtitle><date>2015-10-01</date><risdate>2015</risdate><volume>96-97</volume><spage>22</spage><epage>27</epage><pages>22-27</pages><issn>0920-3796</issn><eissn>1873-7196</eissn><abstract>•Present status of W7-X assembly.•Preparation of commissioning.•Recent results of commission.•Further step in the commissioning of W7-X.•Lessens learned. The super-conducting stellarator Wendelstein 7-X is presently under construction at the Max-Planck-Institute for Plasma Physics in Greifswald, Germany. Assembly of the device is almost completed and the periphery systems and the diagnostic and heating systems are well advanced. Commissioning of the device has been prepared over the last 2 years and has started in April 2014. This is the first time since decades that a superconducting fusion device is commissioned in Europe.</abstract><pub>Elsevier B.V</pub><doi>10.1016/j.fusengdes.2015.05.010</doi><tpages>6</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0920-3796
ispartof Fusion engineering and design, 2015-10, Vol.96-97, p.22-27
issn 0920-3796
1873-7196
language eng
recordid cdi_proquest_miscellaneous_1786182549
source Elsevier ScienceDirect Journals
subjects Assembly
Commissioning
Design engineering
Devices
Diagnostic systems
Heating systems
Stellarator
Stellarators
Superconductivity
Wendelstein 7-X
title Experience with the commissioning of the superconducting stellarator Wendelstein 7-X
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T06%3A23%3A34IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Experience%20with%20the%20commissioning%20of%20the%20superconducting%20stellarator%20Wendelstein%207-X&rft.jtitle=Fusion%20engineering%20and%20design&rft.au=Bosch,%20Hans-Stephan&rft.date=2015-10-01&rft.volume=96-97&rft.spage=22&rft.epage=27&rft.pages=22-27&rft.issn=0920-3796&rft.eissn=1873-7196&rft_id=info:doi/10.1016/j.fusengdes.2015.05.010&rft_dat=%3Cproquest_cross%3E1786182549%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1786182549&rft_id=info:pmid/&rft_els_id=S0920379615003087&rfr_iscdi=true