Instrumentation upgrade for Top-Up operations at the Australian Synchrotron
The Australian Synchrotron introduced Top-Up operations in May 2012. Upgrading the machine for Top-Up has required major developments in many of the accelerator systems. Investigations prior to the start of Top-Up operations demonstrated that the Infrared Microspectroscopy beamline was particularly...
Gespeichert in:
Veröffentlicht in: | Journal of physics. Conference series 2013-01, Vol.425 (4), p.42015-4 |
---|---|
Hauptverfasser: | , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The Australian Synchrotron introduced Top-Up operations in May 2012. Upgrading the machine for Top-Up has required major developments in many of the accelerator systems. Investigations prior to the start of Top-Up operations demonstrated that the Infrared Microspectroscopy beamline was particularly sensitive to injection noise. A gating event has been implemented as part of our timing system upgrade to pause the data collection during injection. In Top-Up mode injections can happen when the gaps of insertion devices are closed. A variable vertical aperture has been installed in the BTS to scape potentially damaging electrons and protect the equipment. |
---|---|
ISSN: | 1742-6588 1742-6596 |
DOI: | 10.1088/1742-6596/425/4/042015 |