Long term operation in 200 m class superconducting DC power transmission test facility in Chubu University

We constructed the 200 m class superconducting DC power transmission test facility (CASER-2) in 2010, and have carried out the cooling down and operation test. The 5th cooling down and operation test was carried out from August to November 2012. Long term current feeding was tested for a month with...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of physics. Conference series 2014-01, Vol.507 (3), p.32020-4
Hauptverfasser: Hamabe, M, Watanabe, H, Sun, J, Kawahara, T, Yamaguchi, S
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!