Comparison and verification of the deviation between guaranteed and measured wind turbine power performance in complex terrain
After a wind farm construction is completed, the power performance guaranteed by the wind turbine manufacturer is usually verified based on the international standard IEC61400-12-1. Because of an insufficient project budget and the constraint on the minimum separation distance of the meteorological...
Gespeichert in:
Veröffentlicht in: | Energy (Oxford) 2015-06, Vol.85 (1), p.23-29 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 29 |
---|---|
container_issue | 1 |
container_start_page | 23 |
container_title | Energy (Oxford) |
container_volume | 85 |
creator | Oh, Hyunseok Kim, Bumsuk |
description | After a wind farm construction is completed, the power performance guaranteed by the wind turbine manufacturer is usually verified based on the international standard IEC61400-12-1. Because of an insufficient project budget and the constraint on the minimum separation distance of the meteorological mast from the installed wind turbines, it is a common practice to verify the power performance of one representative wind turbine and apply the result as the reference power performance guarantee for all the wind turbines. In this study, the power performances of five wind turbines operating at a commercial wind farm located on complex terrain were measured and analyzed. The results showed large power performance differences between the turbines. Because the power performance of one representative wind turbine cannot guarantee the power performances of all the wind turbines in a wind farm located on complex terrain, we submit that it is necessary to carry out power performance verifications on many or all of the wind turbines.
•We examine the difference in power output of wind turbines operating at a wind farm.•Wind turbine power output showed large differences at a complex terrain wind farm.•Power output of one representative wind turbine cannot be generalized.•Power performance verification should be conducted on many or all of the wind turbines. |
doi_str_mv | 10.1016/j.energy.2015.02.115 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1753541634</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0360544215003631</els_id><sourcerecordid>1753541634</sourcerecordid><originalsourceid>FETCH-LOGICAL-c442t-796bb1acada8b74b5dd71784521dbb1ebbbf7480d3409b4e48819cf2b50c56bb3</originalsourceid><addsrcrecordid>eNqNUblOxDAQTQES5x9QuKTZYCf2JmmQ0IpLQqKB2vIxAa82dhg7u9Dw7RhCjahGb-a9uV5RnDFaMsqWF-sSPODLR1lRJkpalYyJveKQ1ku6EJxXB8VRjGtKqWi77rD4XIVhVOhi8ER5S7aArndGJZcToSfpFYiFrZsTGtIOwJOXSaHyCcD-iAZQccIMdi6jNKF2HsgYdoBkBOwDDsobIM4Tk8dt4J0kQFTOnxT7vdpEOP2Nx8XzzfXT6m7x8Hh7v7p6WJi8clo03VJrpoyyqtUN18LahjUtFxWzuQBa677hLbU1p53mwNuWdaavtKBGZGl9XJzPfUcMbxPEJAcXDWw2ykOYomSNqAVny5r_g1pXbc1ZXWUqn6kGQ4wIvRzRDQo_JKPy2w25lrMb8tsNSSuZ3ciyy1kG-eKtA5TROMgPsg7BJGmD-7vBF2Inmnc</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1732834132</pqid></control><display><type>article</type><title>Comparison and verification of the deviation between guaranteed and measured wind turbine power performance in complex terrain</title><source>Elsevier ScienceDirect Journals Complete - AutoHoldings</source><creator>Oh, Hyunseok ; Kim, Bumsuk</creator><creatorcontrib>Oh, Hyunseok ; Kim, Bumsuk</creatorcontrib><description>After a wind farm construction is completed, the power performance guaranteed by the wind turbine manufacturer is usually verified based on the international standard IEC61400-12-1. Because of an insufficient project budget and the constraint on the minimum separation distance of the meteorological mast from the installed wind turbines, it is a common practice to verify the power performance of one representative wind turbine and apply the result as the reference power performance guarantee for all the wind turbines. In this study, the power performances of five wind turbines operating at a commercial wind farm located on complex terrain were measured and analyzed. The results showed large power performance differences between the turbines. Because the power performance of one representative wind turbine cannot guarantee the power performances of all the wind turbines in a wind farm located on complex terrain, we submit that it is necessary to carry out power performance verifications on many or all of the wind turbines.
•We examine the difference in power output of wind turbines operating at a wind farm.•Wind turbine power output showed large differences at a complex terrain wind farm.•Power output of one representative wind turbine cannot be generalized.•Power performance verification should be conducted on many or all of the wind turbines.</description><identifier>ISSN: 0360-5442</identifier><identifier>DOI: 10.1016/j.energy.2015.02.115</identifier><language>eng</language><publisher>Elsevier Ltd</publisher><subject>Annual energy production ; Budgeting ; Complex terrain ; Deviation ; Masts ; Power performance verification ; Terrain ; Turbines ; Wind farm ; Wind power ; Wind turbine ; Wind turbines</subject><ispartof>Energy (Oxford), 2015-06, Vol.85 (1), p.23-29</ispartof><rights>2015 Elsevier Ltd</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c442t-796bb1acada8b74b5dd71784521dbb1ebbbf7480d3409b4e48819cf2b50c56bb3</citedby><cites>FETCH-LOGICAL-c442t-796bb1acada8b74b5dd71784521dbb1ebbbf7480d3409b4e48819cf2b50c56bb3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://dx.doi.org/10.1016/j.energy.2015.02.115$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,778,782,3539,27911,27912,45982</link.rule.ids></links><search><creatorcontrib>Oh, Hyunseok</creatorcontrib><creatorcontrib>Kim, Bumsuk</creatorcontrib><title>Comparison and verification of the deviation between guaranteed and measured wind turbine power performance in complex terrain</title><title>Energy (Oxford)</title><description>After a wind farm construction is completed, the power performance guaranteed by the wind turbine manufacturer is usually verified based on the international standard IEC61400-12-1. Because of an insufficient project budget and the constraint on the minimum separation distance of the meteorological mast from the installed wind turbines, it is a common practice to verify the power performance of one representative wind turbine and apply the result as the reference power performance guarantee for all the wind turbines. In this study, the power performances of five wind turbines operating at a commercial wind farm located on complex terrain were measured and analyzed. The results showed large power performance differences between the turbines. Because the power performance of one representative wind turbine cannot guarantee the power performances of all the wind turbines in a wind farm located on complex terrain, we submit that it is necessary to carry out power performance verifications on many or all of the wind turbines.
•We examine the difference in power output of wind turbines operating at a wind farm.•Wind turbine power output showed large differences at a complex terrain wind farm.•Power output of one representative wind turbine cannot be generalized.•Power performance verification should be conducted on many or all of the wind turbines.</description><subject>Annual energy production</subject><subject>Budgeting</subject><subject>Complex terrain</subject><subject>Deviation</subject><subject>Masts</subject><subject>Power performance verification</subject><subject>Terrain</subject><subject>Turbines</subject><subject>Wind farm</subject><subject>Wind power</subject><subject>Wind turbine</subject><subject>Wind turbines</subject><issn>0360-5442</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2015</creationdate><recordtype>article</recordtype><recordid>eNqNUblOxDAQTQES5x9QuKTZYCf2JmmQ0IpLQqKB2vIxAa82dhg7u9Dw7RhCjahGb-a9uV5RnDFaMsqWF-sSPODLR1lRJkpalYyJveKQ1ku6EJxXB8VRjGtKqWi77rD4XIVhVOhi8ER5S7aArndGJZcToSfpFYiFrZsTGtIOwJOXSaHyCcD-iAZQccIMdi6jNKF2HsgYdoBkBOwDDsobIM4Tk8dt4J0kQFTOnxT7vdpEOP2Nx8XzzfXT6m7x8Hh7v7p6WJi8clo03VJrpoyyqtUN18LahjUtFxWzuQBa677hLbU1p53mwNuWdaavtKBGZGl9XJzPfUcMbxPEJAcXDWw2ykOYomSNqAVny5r_g1pXbc1ZXWUqn6kGQ4wIvRzRDQo_JKPy2w25lrMb8tsNSSuZ3ciyy1kG-eKtA5TROMgPsg7BJGmD-7vBF2Inmnc</recordid><startdate>20150601</startdate><enddate>20150601</enddate><creator>Oh, Hyunseok</creator><creator>Kim, Bumsuk</creator><general>Elsevier Ltd</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7ST</scope><scope>7U6</scope><scope>C1K</scope><scope>SOI</scope><scope>7SP</scope><scope>7SU</scope><scope>7TB</scope><scope>8FD</scope><scope>F28</scope><scope>FR3</scope><scope>H8D</scope><scope>KR7</scope><scope>L7M</scope></search><sort><creationdate>20150601</creationdate><title>Comparison and verification of the deviation between guaranteed and measured wind turbine power performance in complex terrain</title><author>Oh, Hyunseok ; Kim, Bumsuk</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c442t-796bb1acada8b74b5dd71784521dbb1ebbbf7480d3409b4e48819cf2b50c56bb3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2015</creationdate><topic>Annual energy production</topic><topic>Budgeting</topic><topic>Complex terrain</topic><topic>Deviation</topic><topic>Masts</topic><topic>Power performance verification</topic><topic>Terrain</topic><topic>Turbines</topic><topic>Wind farm</topic><topic>Wind power</topic><topic>Wind turbine</topic><topic>Wind turbines</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Oh, Hyunseok</creatorcontrib><creatorcontrib>Kim, Bumsuk</creatorcontrib><collection>CrossRef</collection><collection>Environment Abstracts</collection><collection>Sustainability Science Abstracts</collection><collection>Environmental Sciences and Pollution Management</collection><collection>Environment Abstracts</collection><collection>Electronics & Communications Abstracts</collection><collection>Environmental Engineering Abstracts</collection><collection>Mechanical & Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>ANTE: Abstracts in New Technology & Engineering</collection><collection>Engineering Research Database</collection><collection>Aerospace Database</collection><collection>Civil Engineering Abstracts</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>Energy (Oxford)</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Oh, Hyunseok</au><au>Kim, Bumsuk</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Comparison and verification of the deviation between guaranteed and measured wind turbine power performance in complex terrain</atitle><jtitle>Energy (Oxford)</jtitle><date>2015-06-01</date><risdate>2015</risdate><volume>85</volume><issue>1</issue><spage>23</spage><epage>29</epage><pages>23-29</pages><issn>0360-5442</issn><abstract>After a wind farm construction is completed, the power performance guaranteed by the wind turbine manufacturer is usually verified based on the international standard IEC61400-12-1. Because of an insufficient project budget and the constraint on the minimum separation distance of the meteorological mast from the installed wind turbines, it is a common practice to verify the power performance of one representative wind turbine and apply the result as the reference power performance guarantee for all the wind turbines. In this study, the power performances of five wind turbines operating at a commercial wind farm located on complex terrain were measured and analyzed. The results showed large power performance differences between the turbines. Because the power performance of one representative wind turbine cannot guarantee the power performances of all the wind turbines in a wind farm located on complex terrain, we submit that it is necessary to carry out power performance verifications on many or all of the wind turbines.
•We examine the difference in power output of wind turbines operating at a wind farm.•Wind turbine power output showed large differences at a complex terrain wind farm.•Power output of one representative wind turbine cannot be generalized.•Power performance verification should be conducted on many or all of the wind turbines.</abstract><pub>Elsevier Ltd</pub><doi>10.1016/j.energy.2015.02.115</doi><tpages>7</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0360-5442 |
ispartof | Energy (Oxford), 2015-06, Vol.85 (1), p.23-29 |
issn | 0360-5442 |
language | eng |
recordid | cdi_proquest_miscellaneous_1753541634 |
source | Elsevier ScienceDirect Journals Complete - AutoHoldings |
subjects | Annual energy production Budgeting Complex terrain Deviation Masts Power performance verification Terrain Turbines Wind farm Wind power Wind turbine Wind turbines |
title | Comparison and verification of the deviation between guaranteed and measured wind turbine power performance in complex terrain |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T05%3A48%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Comparison%20and%20verification%20of%20the%20deviation%20between%20guaranteed%20and%20measured%20wind%20turbine%20power%20performance%20in%20complex%20terrain&rft.jtitle=Energy%20(Oxford)&rft.au=Oh,%20Hyunseok&rft.date=2015-06-01&rft.volume=85&rft.issue=1&rft.spage=23&rft.epage=29&rft.pages=23-29&rft.issn=0360-5442&rft_id=info:doi/10.1016/j.energy.2015.02.115&rft_dat=%3Cproquest_cross%3E1753541634%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1732834132&rft_id=info:pmid/&rft_els_id=S0360544215003631&rfr_iscdi=true |