The upgrade of the CMS RPC system during the first LHC long shutdown
The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of the Large Hadron Collider gradually increases. During the L...
Gespeichert in:
Veröffentlicht in: | Journal of instrumentation 2013-02, Vol.7 (2), p.1-7 |
---|---|
Hauptverfasser: | , , , , , , , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 7 |
---|---|
container_issue | 2 |
container_start_page | 1 |
container_title | Journal of instrumentation |
container_volume | 7 |
creator | Tytgat, M Marinov, A Verwilligen, P Zaganidis, N Aleksandrov, A Genchev, V Iaydjiev, P Rodozov, M Shopova, M Sultanov, G Assran, Y Abbrescia, M Calabria, C Colaleo, A |
description | The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of the Large Hadron Collider gradually increases. During the LHC Phase 1 ( similar to first 10 years of operation) an ultimate luminosity is expected above its design value of 10 super(34) cm super(-2)s super(-1) at 14 TeV. To prepare the machine and also the experiments for this, two long shutdown periods are scheduled for 2013-2014 and 2018-2019. The CMS Collaboration is planning several detector upgrades during these long shutdowns. In particular, the muon detection system should be able to maintain a low-pT threshold for an efficient Level-1 Muon Trigger at high particle rates. One of the measures to ensure this, is to extend the present RPC system with the addition of a 4th layer in both endcap regions. During the first long shutdown, these two new stations will be equipped in the region degree ' eta degree ' < 1.6 with 144 High Pressure Laminate (HPL) double-layer RPCs operating in avalanche mode, with a similar design as the existing CMS endcap chambers. Here, we present the upgrade plans for the CMS RPC system for the fist long shutdown, including trigger simulation studies for the extended system, and details on the new HPL production, the chamber assembly and the quality control procedures. |
doi_str_mv | 10.1088/1748-0221/8/02/T02002 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1753528948</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>1448708446</sourcerecordid><originalsourceid>FETCH-LOGICAL-c366t-18e9a6ea28235e2d00058052cfa345ee15af0d07bf186b29441d18685bc28b883</originalsourceid><addsrcrecordid>eNqNkEFLxDAQhYMouK7-BCFHL7WTNGmnR6m6K6woup5D2ia7le62Ji2y_97Winj09N68eQzDR8glg2sGiCFLBAbAOQsxBB6ugQPwIzL7zY__-FNy5v07gEylgBm5XW8N7duN06WhjaXdMGaPr_TlOaP-4Duzo2Xvqv3me2Mr5zu6Wma0bobIb_uubD735-TE6tqbix-dk7f7u3W2DFZPi4fsZhUUURx3AUOT6thojjyShpcwfIEgeWF1JKQxTGoLJSS5ZRjnPBWClYNDmRccc8RoTq6mu61rPnrjO7WrfGHqWu9N03vFEhlJjqn4R1UITACFiIeqnKqFa7x3xqrWVTvtDoqBGgGrEZ4a4alR1AQ4-gKisWtY</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1448708446</pqid></control><display><type>article</type><title>The upgrade of the CMS RPC system during the first LHC long shutdown</title><source>IOP Publishing Journals</source><source>Institute of Physics (IOP) Journals - HEAL-Link</source><creator>Tytgat, M ; Marinov, A ; Verwilligen, P ; Zaganidis, N ; Aleksandrov, A ; Genchev, V ; Iaydjiev, P ; Rodozov, M ; Shopova, M ; Sultanov, G ; Assran, Y ; Abbrescia, M ; Calabria, C ; Colaleo, A</creator><creatorcontrib>Tytgat, M ; Marinov, A ; Verwilligen, P ; Zaganidis, N ; Aleksandrov, A ; Genchev, V ; Iaydjiev, P ; Rodozov, M ; Shopova, M ; Sultanov, G ; Assran, Y ; Abbrescia, M ; Calabria, C ; Colaleo, A</creatorcontrib><description>The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of the Large Hadron Collider gradually increases. During the LHC Phase 1 ( similar to first 10 years of operation) an ultimate luminosity is expected above its design value of 10 super(34) cm super(-2)s super(-1) at 14 TeV. To prepare the machine and also the experiments for this, two long shutdown periods are scheduled for 2013-2014 and 2018-2019. The CMS Collaboration is planning several detector upgrades during these long shutdowns. In particular, the muon detection system should be able to maintain a low-pT threshold for an efficient Level-1 Muon Trigger at high particle rates. One of the measures to ensure this, is to extend the present RPC system with the addition of a 4th layer in both endcap regions. During the first long shutdown, these two new stations will be equipped in the region degree ' eta degree ' < 1.6 with 144 High Pressure Laminate (HPL) double-layer RPCs operating in avalanche mode, with a similar design as the existing CMS endcap chambers. Here, we present the upgrade plans for the CMS RPC system for the fist long shutdown, including trigger simulation studies for the extended system, and details on the new HPL production, the chamber assembly and the quality control procedures.</description><identifier>ISSN: 1748-0221</identifier><identifier>EISSN: 1748-0221</identifier><identifier>DOI: 10.1088/1748-0221/8/02/T02002</identifier><language>eng</language><subject>Chambers ; Design engineering ; Detectors ; Large Hadron Collider ; Luminosity ; Muons ; Resistive plate chambers ; Shutdowns</subject><ispartof>Journal of instrumentation, 2013-02, Vol.7 (2), p.1-7</ispartof><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c366t-18e9a6ea28235e2d00058052cfa345ee15af0d07bf186b29441d18685bc28b883</citedby><cites>FETCH-LOGICAL-c366t-18e9a6ea28235e2d00058052cfa345ee15af0d07bf186b29441d18685bc28b883</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27901,27902</link.rule.ids></links><search><creatorcontrib>Tytgat, M</creatorcontrib><creatorcontrib>Marinov, A</creatorcontrib><creatorcontrib>Verwilligen, P</creatorcontrib><creatorcontrib>Zaganidis, N</creatorcontrib><creatorcontrib>Aleksandrov, A</creatorcontrib><creatorcontrib>Genchev, V</creatorcontrib><creatorcontrib>Iaydjiev, P</creatorcontrib><creatorcontrib>Rodozov, M</creatorcontrib><creatorcontrib>Shopova, M</creatorcontrib><creatorcontrib>Sultanov, G</creatorcontrib><creatorcontrib>Assran, Y</creatorcontrib><creatorcontrib>Abbrescia, M</creatorcontrib><creatorcontrib>Calabria, C</creatorcontrib><creatorcontrib>Colaleo, A</creatorcontrib><title>The upgrade of the CMS RPC system during the first LHC long shutdown</title><title>Journal of instrumentation</title><description>The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of the Large Hadron Collider gradually increases. During the LHC Phase 1 ( similar to first 10 years of operation) an ultimate luminosity is expected above its design value of 10 super(34) cm super(-2)s super(-1) at 14 TeV. To prepare the machine and also the experiments for this, two long shutdown periods are scheduled for 2013-2014 and 2018-2019. The CMS Collaboration is planning several detector upgrades during these long shutdowns. In particular, the muon detection system should be able to maintain a low-pT threshold for an efficient Level-1 Muon Trigger at high particle rates. One of the measures to ensure this, is to extend the present RPC system with the addition of a 4th layer in both endcap regions. During the first long shutdown, these two new stations will be equipped in the region degree ' eta degree ' < 1.6 with 144 High Pressure Laminate (HPL) double-layer RPCs operating in avalanche mode, with a similar design as the existing CMS endcap chambers. Here, we present the upgrade plans for the CMS RPC system for the fist long shutdown, including trigger simulation studies for the extended system, and details on the new HPL production, the chamber assembly and the quality control procedures.</description><subject>Chambers</subject><subject>Design engineering</subject><subject>Detectors</subject><subject>Large Hadron Collider</subject><subject>Luminosity</subject><subject>Muons</subject><subject>Resistive plate chambers</subject><subject>Shutdowns</subject><issn>1748-0221</issn><issn>1748-0221</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2013</creationdate><recordtype>article</recordtype><recordid>eNqNkEFLxDAQhYMouK7-BCFHL7WTNGmnR6m6K6woup5D2ia7le62Ji2y_97Winj09N68eQzDR8glg2sGiCFLBAbAOQsxBB6ugQPwIzL7zY__-FNy5v07gEylgBm5XW8N7duN06WhjaXdMGaPr_TlOaP-4Duzo2Xvqv3me2Mr5zu6Wma0bobIb_uubD735-TE6tqbix-dk7f7u3W2DFZPi4fsZhUUURx3AUOT6thojjyShpcwfIEgeWF1JKQxTGoLJSS5ZRjnPBWClYNDmRccc8RoTq6mu61rPnrjO7WrfGHqWu9N03vFEhlJjqn4R1UITACFiIeqnKqFa7x3xqrWVTvtDoqBGgGrEZ4a4alR1AQ4-gKisWtY</recordid><startdate>20130201</startdate><enddate>20130201</enddate><creator>Tytgat, M</creator><creator>Marinov, A</creator><creator>Verwilligen, P</creator><creator>Zaganidis, N</creator><creator>Aleksandrov, A</creator><creator>Genchev, V</creator><creator>Iaydjiev, P</creator><creator>Rodozov, M</creator><creator>Shopova, M</creator><creator>Sultanov, G</creator><creator>Assran, Y</creator><creator>Abbrescia, M</creator><creator>Calabria, C</creator><creator>Colaleo, A</creator><scope>AAYXX</scope><scope>CITATION</scope><scope>7U5</scope><scope>8FD</scope><scope>L7M</scope><scope>H8D</scope></search><sort><creationdate>20130201</creationdate><title>The upgrade of the CMS RPC system during the first LHC long shutdown</title><author>Tytgat, M ; Marinov, A ; Verwilligen, P ; Zaganidis, N ; Aleksandrov, A ; Genchev, V ; Iaydjiev, P ; Rodozov, M ; Shopova, M ; Sultanov, G ; Assran, Y ; Abbrescia, M ; Calabria, C ; Colaleo, A</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c366t-18e9a6ea28235e2d00058052cfa345ee15af0d07bf186b29441d18685bc28b883</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2013</creationdate><topic>Chambers</topic><topic>Design engineering</topic><topic>Detectors</topic><topic>Large Hadron Collider</topic><topic>Luminosity</topic><topic>Muons</topic><topic>Resistive plate chambers</topic><topic>Shutdowns</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Tytgat, M</creatorcontrib><creatorcontrib>Marinov, A</creatorcontrib><creatorcontrib>Verwilligen, P</creatorcontrib><creatorcontrib>Zaganidis, N</creatorcontrib><creatorcontrib>Aleksandrov, A</creatorcontrib><creatorcontrib>Genchev, V</creatorcontrib><creatorcontrib>Iaydjiev, P</creatorcontrib><creatorcontrib>Rodozov, M</creatorcontrib><creatorcontrib>Shopova, M</creatorcontrib><creatorcontrib>Sultanov, G</creatorcontrib><creatorcontrib>Assran, Y</creatorcontrib><creatorcontrib>Abbrescia, M</creatorcontrib><creatorcontrib>Calabria, C</creatorcontrib><creatorcontrib>Colaleo, A</creatorcontrib><collection>CrossRef</collection><collection>Solid State and Superconductivity Abstracts</collection><collection>Technology Research Database</collection><collection>Advanced Technologies Database with Aerospace</collection><collection>Aerospace Database</collection><jtitle>Journal of instrumentation</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Tytgat, M</au><au>Marinov, A</au><au>Verwilligen, P</au><au>Zaganidis, N</au><au>Aleksandrov, A</au><au>Genchev, V</au><au>Iaydjiev, P</au><au>Rodozov, M</au><au>Shopova, M</au><au>Sultanov, G</au><au>Assran, Y</au><au>Abbrescia, M</au><au>Calabria, C</au><au>Colaleo, A</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The upgrade of the CMS RPC system during the first LHC long shutdown</atitle><jtitle>Journal of instrumentation</jtitle><date>2013-02-01</date><risdate>2013</risdate><volume>7</volume><issue>2</issue><spage>1</spage><epage>7</epage><pages>1-7</pages><issn>1748-0221</issn><eissn>1748-0221</eissn><abstract>The CMS muon system includes in both the barrel and endcap region Resistive Plate Chambers (RPC). They mainly serve as trigger detectors and also improve the reconstruction of muon parameters. Over the years, the instantaneous luminosity of the Large Hadron Collider gradually increases. During the LHC Phase 1 ( similar to first 10 years of operation) an ultimate luminosity is expected above its design value of 10 super(34) cm super(-2)s super(-1) at 14 TeV. To prepare the machine and also the experiments for this, two long shutdown periods are scheduled for 2013-2014 and 2018-2019. The CMS Collaboration is planning several detector upgrades during these long shutdowns. In particular, the muon detection system should be able to maintain a low-pT threshold for an efficient Level-1 Muon Trigger at high particle rates. One of the measures to ensure this, is to extend the present RPC system with the addition of a 4th layer in both endcap regions. During the first long shutdown, these two new stations will be equipped in the region degree ' eta degree ' < 1.6 with 144 High Pressure Laminate (HPL) double-layer RPCs operating in avalanche mode, with a similar design as the existing CMS endcap chambers. Here, we present the upgrade plans for the CMS RPC system for the fist long shutdown, including trigger simulation studies for the extended system, and details on the new HPL production, the chamber assembly and the quality control procedures.</abstract><doi>10.1088/1748-0221/8/02/T02002</doi><tpages>7</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1748-0221 |
ispartof | Journal of instrumentation, 2013-02, Vol.7 (2), p.1-7 |
issn | 1748-0221 1748-0221 |
language | eng |
recordid | cdi_proquest_miscellaneous_1753528948 |
source | IOP Publishing Journals; Institute of Physics (IOP) Journals - HEAL-Link |
subjects | Chambers Design engineering Detectors Large Hadron Collider Luminosity Muons Resistive plate chambers Shutdowns |
title | The upgrade of the CMS RPC system during the first LHC long shutdown |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-31T12%3A54%3A28IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20upgrade%20of%20the%20CMS%20RPC%20system%20during%20the%20first%20LHC%20long%20shutdown&rft.jtitle=Journal%20of%20instrumentation&rft.au=Tytgat,%20M&rft.date=2013-02-01&rft.volume=7&rft.issue=2&rft.spage=1&rft.epage=7&rft.pages=1-7&rft.issn=1748-0221&rft.eissn=1748-0221&rft_id=info:doi/10.1088/1748-0221/8/02/T02002&rft_dat=%3Cproquest_cross%3E1448708446%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1448708446&rft_id=info:pmid/&rfr_iscdi=true |