Balance of S in a constructed wetland built to treat acid mine drainage, Idaho Springs, Colorado, U.S.A

The wetland constructed at the Big Five Tunnel in Idaho Springs, Colorado was designed to remove, passively, heavy metals from acid mine drainage. In optimizing the design of such a wetland, an improved understanding of the chemical processes operating there was required, particularly SO 4 2− reduct...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied geochemistry 1993, Vol.8 (6), p.587-603
Hauptverfasser: Machemer, Steven D., Reynolds, Julia S., Laudon, Leslie S., Wildeman, Thomas R.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!