The latent causes of rework in floating production storage and offloading projects

There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects a...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Journal of civil engineering and management 2014-06, Vol.20 (3), p.315-329
Hauptverfasser: Love, Peter E. D., Edwards, David John, Irani, Zahir, Forcada, Nuria
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 329
container_issue 3
container_start_page 315
container_title Journal of civil engineering and management
container_volume 20
creator Love, Peter E. D.
Edwards, David John
Irani, Zahir
Forcada, Nuria
description There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects are prone to significant cost and schedule growth. On average, FPSOs have been reported to experience a 20% cost growth and are delayed by six months. Overruns and delays represent uncertainties for owners, contractors and financial institutions. In-depth interviews with twenty-three practitioners about their experiences with FPSO projects revealed that rework arising from design and construction errors were major contributors to cost and schedule growth. Key latent conditions contributing to rework are classified according to people, organization and project. Using retrospective sensemaking an examination of the determinant histories in a new build and conversion FPSO that experienced rework was undertaken. The sharing of experience(s) is deemed pivotal for reducing rework in future projects, particularly through the use of communities of practice that are able to stimulate situated learning to take place. A reduction in rework will not only reduce cost and schedule growth, improve operational performance and augment safety.
doi_str_mv 10.3846/13923730.2013.802725
format Article
fullrecord <record><control><sourceid>gale_proqu</sourceid><recordid>TN_cdi_proquest_miscellaneous_1671586548</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><galeid>A378248517</galeid><doaj_id>oai_doaj_org_article_ea3b053be33f421396df375a492b110b</doaj_id><sourcerecordid>A378248517</sourcerecordid><originalsourceid>FETCH-LOGICAL-c557t-e0ef72d51dbdb8b95f73219de323cfff665e7ef29bc3572c9ddc9264c00c50fd3</originalsourceid><addsrcrecordid>eNqFkk1rFTEYhQexYK3-AxezdOFc852ZlZSibaEgSLsOmeTNNNe5SU0ySP-9mc616EYJ-eQ5hzfJaZp3GO1oz8RHTAdCJUU7gjDd9YhIwl80p7gnpKMC8Zd1XZFuZV41r3PeI8Q5kfK0-XZ7D-2sC4TSGr1kyG10bYKfMX1vfWjdHHXxYWofUrSLKT6GNpeY9AStDrbCK2GPxB5MyW-aE6fnDG-P81lz9-Xz7cVVd_P18vri_KYznMvSAQInieXYjnbsx4E7SQkeLFBCjXNOCA4SHBlGQ7kkZrDWDEQwg5DhyFl61lxvvjbqvXpI_qDTo4raq6eDmCalU_FmBgWajojTESh1jNS3ENZRyTUbyIgxGqsX3rxMXoxKYCAZXZ7MnjdrJ0gSRShjXFTN-01TL_5jgVzUwWcD86wDxCUrLCTmveCs_z_K-SAYk2x13W3opGvhPrhYkja1WTh4EwM4X8_PqewJ6zmWVfDhD8G4ZB8g1yH76b7kqf5p_htnx5ummHMC9_xyGKk1Tep3mtSaJrWlqco-bbK1onTQNR-zVUU_zjG5pIPxWdF_OvwC1QzP5A</addsrcrecordid><sourcetype>Open Website</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1559644746</pqid></control><display><type>article</type><title>The latent causes of rework in floating production storage and offloading projects</title><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><source>Recercat</source><creator>Love, Peter E. D. ; Edwards, David John ; Irani, Zahir ; Forcada, Nuria</creator><creatorcontrib>Love, Peter E. D. ; Edwards, David John ; Irani, Zahir ; Forcada, Nuria</creatorcontrib><description>There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects are prone to significant cost and schedule growth. On average, FPSOs have been reported to experience a 20% cost growth and are delayed by six months. Overruns and delays represent uncertainties for owners, contractors and financial institutions. In-depth interviews with twenty-three practitioners about their experiences with FPSO projects revealed that rework arising from design and construction errors were major contributors to cost and schedule growth. Key latent conditions contributing to rework are classified according to people, organization and project. Using retrospective sensemaking an examination of the determinant histories in a new build and conversion FPSO that experienced rework was undertaken. The sharing of experience(s) is deemed pivotal for reducing rework in future projects, particularly through the use of communities of practice that are able to stimulate situated learning to take place. A reduction in rework will not only reduce cost and schedule growth, improve operational performance and augment safety.</description><identifier>ISSN: 1392-3730</identifier><identifier>EISSN: 1822-3605</identifier><identifier>DOI: 10.3846/13923730.2013.802725</identifier><language>eng</language><publisher>Taylor &amp; Francis</publisher><subject>Construction costs ; Conversion ; Cost engineering ; Delay ; Demand (economics) ; Economics ; Edificació ; Errors ; Estructures marines ; Floating structures ; FPSO ; Gestió d'obres ; Gestió de projectes ; Learning ; New build ; Offshore structures ; Project management ; Projectes i construcció ; Retrospection ; Rework ; Schedules ; Sensemaking ; Àrees temàtiques de la UPC</subject><ispartof>Journal of civil engineering and management, 2014-06, Vol.20 (3), p.315-329</ispartof><rights>Copyright © 2014 Vilnius Gediminas Technical University (VGTU) Press 2014</rights><rights>COPYRIGHT 2014 Vilnius Gediminas Technical University</rights><rights>info:eu-repo/semantics/openAccess</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c557t-e0ef72d51dbdb8b95f73219de323cfff665e7ef29bc3572c9ddc9264c00c50fd3</citedby><cites>FETCH-LOGICAL-c557t-e0ef72d51dbdb8b95f73219de323cfff665e7ef29bc3572c9ddc9264c00c50fd3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>230,315,782,786,887,26981,27931,27932</link.rule.ids></links><search><creatorcontrib>Love, Peter E. D.</creatorcontrib><creatorcontrib>Edwards, David John</creatorcontrib><creatorcontrib>Irani, Zahir</creatorcontrib><creatorcontrib>Forcada, Nuria</creatorcontrib><title>The latent causes of rework in floating production storage and offloading projects</title><title>Journal of civil engineering and management</title><description>There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects are prone to significant cost and schedule growth. On average, FPSOs have been reported to experience a 20% cost growth and are delayed by six months. Overruns and delays represent uncertainties for owners, contractors and financial institutions. In-depth interviews with twenty-three practitioners about their experiences with FPSO projects revealed that rework arising from design and construction errors were major contributors to cost and schedule growth. Key latent conditions contributing to rework are classified according to people, organization and project. Using retrospective sensemaking an examination of the determinant histories in a new build and conversion FPSO that experienced rework was undertaken. The sharing of experience(s) is deemed pivotal for reducing rework in future projects, particularly through the use of communities of practice that are able to stimulate situated learning to take place. A reduction in rework will not only reduce cost and schedule growth, improve operational performance and augment safety.</description><subject>Construction costs</subject><subject>Conversion</subject><subject>Cost engineering</subject><subject>Delay</subject><subject>Demand (economics)</subject><subject>Economics</subject><subject>Edificació</subject><subject>Errors</subject><subject>Estructures marines</subject><subject>Floating structures</subject><subject>FPSO</subject><subject>Gestió d'obres</subject><subject>Gestió de projectes</subject><subject>Learning</subject><subject>New build</subject><subject>Offshore structures</subject><subject>Project management</subject><subject>Projectes i construcció</subject><subject>Retrospection</subject><subject>Rework</subject><subject>Schedules</subject><subject>Sensemaking</subject><subject>Àrees temàtiques de la UPC</subject><issn>1392-3730</issn><issn>1822-3605</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2014</creationdate><recordtype>article</recordtype><sourceid>N95</sourceid><sourceid>XX2</sourceid><sourceid>DOA</sourceid><recordid>eNqFkk1rFTEYhQexYK3-AxezdOFc852ZlZSibaEgSLsOmeTNNNe5SU0ySP-9mc616EYJ-eQ5hzfJaZp3GO1oz8RHTAdCJUU7gjDd9YhIwl80p7gnpKMC8Zd1XZFuZV41r3PeI8Q5kfK0-XZ7D-2sC4TSGr1kyG10bYKfMX1vfWjdHHXxYWofUrSLKT6GNpeY9AStDrbCK2GPxB5MyW-aE6fnDG-P81lz9-Xz7cVVd_P18vri_KYznMvSAQInieXYjnbsx4E7SQkeLFBCjXNOCA4SHBlGQ7kkZrDWDEQwg5DhyFl61lxvvjbqvXpI_qDTo4raq6eDmCalU_FmBgWajojTESh1jNS3ENZRyTUbyIgxGqsX3rxMXoxKYCAZXZ7MnjdrJ0gSRShjXFTN-01TL_5jgVzUwWcD86wDxCUrLCTmveCs_z_K-SAYk2x13W3opGvhPrhYkja1WTh4EwM4X8_PqewJ6zmWVfDhD8G4ZB8g1yH76b7kqf5p_htnx5ummHMC9_xyGKk1Tep3mtSaJrWlqco-bbK1onTQNR-zVUU_zjG5pIPxWdF_OvwC1QzP5A</recordid><startdate>20140601</startdate><enddate>20140601</enddate><creator>Love, Peter E. D.</creator><creator>Edwards, David John</creator><creator>Irani, Zahir</creator><creator>Forcada, Nuria</creator><general>Taylor &amp; Francis</general><general>Vilnius Gediminas Technical University</general><scope>AAYXX</scope><scope>CITATION</scope><scope>N95</scope><scope>8FD</scope><scope>FR3</scope><scope>KR7</scope><scope>XX2</scope><scope>DOA</scope></search><sort><creationdate>20140601</creationdate><title>The latent causes of rework in floating production storage and offloading projects</title><author>Love, Peter E. D. ; Edwards, David John ; Irani, Zahir ; Forcada, Nuria</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c557t-e0ef72d51dbdb8b95f73219de323cfff665e7ef29bc3572c9ddc9264c00c50fd3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2014</creationdate><topic>Construction costs</topic><topic>Conversion</topic><topic>Cost engineering</topic><topic>Delay</topic><topic>Demand (economics)</topic><topic>Economics</topic><topic>Edificació</topic><topic>Errors</topic><topic>Estructures marines</topic><topic>Floating structures</topic><topic>FPSO</topic><topic>Gestió d'obres</topic><topic>Gestió de projectes</topic><topic>Learning</topic><topic>New build</topic><topic>Offshore structures</topic><topic>Project management</topic><topic>Projectes i construcció</topic><topic>Retrospection</topic><topic>Rework</topic><topic>Schedules</topic><topic>Sensemaking</topic><topic>Àrees temàtiques de la UPC</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Love, Peter E. D.</creatorcontrib><creatorcontrib>Edwards, David John</creatorcontrib><creatorcontrib>Irani, Zahir</creatorcontrib><creatorcontrib>Forcada, Nuria</creatorcontrib><collection>CrossRef</collection><collection>Gale Business: Insights</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Civil Engineering Abstracts</collection><collection>Recercat</collection><collection>DOAJ Directory of Open Access Journals</collection><jtitle>Journal of civil engineering and management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Love, Peter E. D.</au><au>Edwards, David John</au><au>Irani, Zahir</au><au>Forcada, Nuria</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>The latent causes of rework in floating production storage and offloading projects</atitle><jtitle>Journal of civil engineering and management</jtitle><date>2014-06-01</date><risdate>2014</risdate><volume>20</volume><issue>3</issue><spage>315</spage><epage>329</epage><pages>315-329</pages><issn>1392-3730</issn><eissn>1822-3605</eissn><abstract>There is growing demand for cost effective and reliable floating production systems to maximize marginal and new deepwater fields worldwide. Floating Production Storage and Offloading (FPSO) vessels are considered to be the most economical and viable options to meet this demand. Yet, FPSO projects are prone to significant cost and schedule growth. On average, FPSOs have been reported to experience a 20% cost growth and are delayed by six months. Overruns and delays represent uncertainties for owners, contractors and financial institutions. In-depth interviews with twenty-three practitioners about their experiences with FPSO projects revealed that rework arising from design and construction errors were major contributors to cost and schedule growth. Key latent conditions contributing to rework are classified according to people, organization and project. Using retrospective sensemaking an examination of the determinant histories in a new build and conversion FPSO that experienced rework was undertaken. The sharing of experience(s) is deemed pivotal for reducing rework in future projects, particularly through the use of communities of practice that are able to stimulate situated learning to take place. A reduction in rework will not only reduce cost and schedule growth, improve operational performance and augment safety.</abstract><pub>Taylor &amp; Francis</pub><doi>10.3846/13923730.2013.802725</doi><tpages>15</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 1392-3730
ispartof Journal of civil engineering and management, 2014-06, Vol.20 (3), p.315-329
issn 1392-3730
1822-3605
language eng
recordid cdi_proquest_miscellaneous_1671586548
source Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals; Recercat
subjects Construction costs
Conversion
Cost engineering
Delay
Demand (economics)
Economics
Edificació
Errors
Estructures marines
Floating structures
FPSO
Gestió d'obres
Gestió de projectes
Learning
New build
Offshore structures
Project management
Projectes i construcció
Retrospection
Rework
Schedules
Sensemaking
Àrees temàtiques de la UPC
title The latent causes of rework in floating production storage and offloading projects
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-05T00%3A15%3A06IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-gale_proqu&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=The%20latent%20causes%20of%20rework%20in%20floating%20production%20storage%20and%20offloading%20projects&rft.jtitle=Journal%20of%20civil%20engineering%20and%20management&rft.au=Love,%20Peter%20E.%20D.&rft.date=2014-06-01&rft.volume=20&rft.issue=3&rft.spage=315&rft.epage=329&rft.pages=315-329&rft.issn=1392-3730&rft.eissn=1822-3605&rft_id=info:doi/10.3846/13923730.2013.802725&rft_dat=%3Cgale_proqu%3EA378248517%3C/gale_proqu%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1559644746&rft_id=info:pmid/&rft_galeid=A378248517&rft_doaj_id=oai_doaj_org_article_ea3b053be33f421396df375a492b110b&rfr_iscdi=true