Probabilistic reliability assessment in operation planning
The Brazilian power grid has traditionally been designed and operated using a set of deterministic reliability criteria. They have played an important role in the design and operation of the Brazilian bulk power system for decades. However, they tend to use available resources less optimally and ove...
Gespeichert in:
Veröffentlicht in: | Proceedings of the Institution of Mechanical Engineers. Part O, Journal of risk and reliability Journal of risk and reliability, 2012-02, Vol.226 (1), p.88-95 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!