Novel approach of modeling load duration curve for generation expansion planning based on Hill's function

A novel approach of modeling the load duration curve (LDC) based on Hill's function is proposed in this article. On the contrary to traditional models, the proposed model is completely an analytical one which can be determined by historic load data. This method is effective in calculating effic...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IEEJ transactions on electrical and electronic engineering 2011-07, Vol.6 (4), p.304-310
Hauptverfasser: Kato, Moritoshi, Zhou, Yicheng, Kang, Chongqing, Yokoyama, Ryuichi
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!