Optimum operation of a small sequencing batch reactor for bod and nitrogen removal based on on-line our-calculation
A full-scale Sequencing Batch Reactor designed for 200 P.E. has been operated with nutrient removal. In serated periods of the operational cycle the Oxygen Utilization Rate has been calculated on-line based on a standard oxygen probe which is also used for the control of the oxygen supply. It is des...
Gespeichert in:
Veröffentlicht in: | Water science and technology 1997-01, Vol.35 (6), p.29-36 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!