Planning and Control in Construction of LW3-1 Jacket

According to Chinese traditional classification, large-sized jackets weight over 10,000 tons and stand in over 100-meter water. Large-sized jackets are different from the normal in construction tonnage, structural dimension and quality control requirements as well as construction difficulty. More co...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Applied Mechanics and Materials 2013-12, Vol.467 (Materials Science and Mechanical Engineering), p.277-281
Hauptverfasser: Xue, Yu Hui, Sun, Pi Song, Meng, Rui, Wang, Hong, Wu, Hang, Zhang, Hui, Han, Shao Ning
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:According to Chinese traditional classification, large-sized jackets weight over 10,000 tons and stand in over 100-meter water. Large-sized jackets are different from the normal in construction tonnage, structural dimension and quality control requirements as well as construction difficulty. More complicated construction technology and programme, higher grade of materials, stricter control requirements on node weld and higher risks all need matched stricter, more meticulous and more comprehensive management in planning and scheduling. Combined with construction of LW3-1 deep-water jacket, this paper describes the planning, tracking progress, process control and optimization.
ISSN:1660-9336
1662-7482
1662-7482
DOI:10.4028/www.scientific.net/AMM.467.277