Revenue-sharing contracts in an N-stage supply chain with reliability considerations

Revenue-sharing (RS) contracts have been used in a number of industries and have proven to be effective. However, the current RS contracts can be limited when improving the supply chain performance because of member reliability issues. This paper studies a revenue-sharing with reliability (RSR) cont...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:International journal of production economics 2014-01, Vol.147, p.20-29
Hauptverfasser: Feng, Xuehao, Moon, Ilkyeong, Ryu, Kwangyeol
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 29
container_issue
container_start_page 20
container_title International journal of production economics
container_volume 147
creator Feng, Xuehao
Moon, Ilkyeong
Ryu, Kwangyeol
description Revenue-sharing (RS) contracts have been used in a number of industries and have proven to be effective. However, the current RS contracts can be limited when improving the supply chain performance because of member reliability issues. This paper studies a revenue-sharing with reliability (RSR) contract in an N-stage supply chain. In this type of supply chain, there are more than two stages, and certain members have more than one upstream member. First, we propose an RSR contract that can coordinate supply chains and arbitrarily allocate total profits. A two-round profit allocation mechanism is utilized in this RSR contract. In the first round, an initial profit allocation scenario is decided; in the second round, the allocation is adjusted by considering the reliability of all of the members. A flexible method for adjusting the profits in the second round is proposed. Second, we study the incentives for the members to improve their reliability under the RS and RSR contracts by considering two realistic types of improvement investments in reliability. It is found that, in some cases, the RS contracts are limited in terms of encouraging the members to improve their reliability. Next, we show that there are greater incentives for members to improve their reliability under an RSR contract. We discuss in what cases the maximum possible profit of the supply chain under the RSR contract is higher than under the RS contract. Our analytical and numerical results yield insights into how managers can be encouraged to improve their reliability by setting certain decision variables.
doi_str_mv 10.1016/j.ijpe.2013.01.002
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1531029649</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0925527313000200</els_id><sourcerecordid>1531029649</sourcerecordid><originalsourceid>FETCH-LOGICAL-c425t-58c53537d20134f4342f4097d3e35ab06a7c5ac0d6837c47dccab01119cf65d23</originalsourceid><addsrcrecordid>eNp9kE1Lw0AQhhdRsFb_gKeAFy-J-5lNwIsUv6AoSD0v282k3ZAmcXdT6b93Qz15kDnMMLzP8M6L0DXBGcEkv2sy2wyQUUxYhkmGMT1BM1JIlkohy1M0wyUVqaCSnaML7xuMsSRFMUOrD9hDN0Lqt9rZbpOYvgtOm-AT2yW6S95SH_QGEj8OQ3tIzFbH_bcN28RBa_XatjYcJsrbCpwONk6X6KzWrYer3z5Hn0-Pq8VLunx_fl08LFPDqQipKIxggslqss1rzjitOS5lxYAJvca5lkZog6u8YNJwWRkTt4SQ0tS5qCibo9vj3cH1XyP4oHbWG2hb3UE_ekUEI5iWOS-j9OaPtOlH10V3ivBcxiJcRBU9qozrvXdQq8HZnXYHRbCaglaNmoJWk2OFiYpBR-j-CEF8dW_BKW8sdAYq68AEVfX2P_wHyf2GZQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1467676145</pqid></control><display><type>article</type><title>Revenue-sharing contracts in an N-stage supply chain with reliability considerations</title><source>Elsevier ScienceDirect Journals</source><creator>Feng, Xuehao ; Moon, Ilkyeong ; Ryu, Kwangyeol</creator><creatorcontrib>Feng, Xuehao ; Moon, Ilkyeong ; Ryu, Kwangyeol</creatorcontrib><description>Revenue-sharing (RS) contracts have been used in a number of industries and have proven to be effective. However, the current RS contracts can be limited when improving the supply chain performance because of member reliability issues. This paper studies a revenue-sharing with reliability (RSR) contract in an N-stage supply chain. In this type of supply chain, there are more than two stages, and certain members have more than one upstream member. First, we propose an RSR contract that can coordinate supply chains and arbitrarily allocate total profits. A two-round profit allocation mechanism is utilized in this RSR contract. In the first round, an initial profit allocation scenario is decided; in the second round, the allocation is adjusted by considering the reliability of all of the members. A flexible method for adjusting the profits in the second round is proposed. Second, we study the incentives for the members to improve their reliability under the RS and RSR contracts by considering two realistic types of improvement investments in reliability. It is found that, in some cases, the RS contracts are limited in terms of encouraging the members to improve their reliability. Next, we show that there are greater incentives for members to improve their reliability under an RSR contract. We discuss in what cases the maximum possible profit of the supply chain under the RSR contract is higher than under the RS contract. Our analytical and numerical results yield insights into how managers can be encouraged to improve their reliability by setting certain decision variables.</description><identifier>ISSN: 0925-5273</identifier><identifier>EISSN: 1873-7579</identifier><identifier>DOI: 10.1016/j.ijpe.2013.01.002</identifier><identifier>CODEN: IJPCEY</identifier><language>eng</language><publisher>Amsterdam: Elsevier B.V</publisher><subject>Allocations ; Contracts ; Corporate profits ; Economics ; Incentives ; Mathematical analysis ; Mathematical models ; Profits ; Reliability ; Resource allocation ; Revenue sharing ; Studies ; Supply chain ; Supply chain management ; Supply chains ; Two-round profit allocation ; Upstream</subject><ispartof>International journal of production economics, 2014-01, Vol.147, p.20-29</ispartof><rights>2013 Elsevier B.V.</rights><rights>Copyright Elsevier Sequoia S.A. Jan 2014</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c425t-58c53537d20134f4342f4097d3e35ab06a7c5ac0d6837c47dccab01119cf65d23</citedby><cites>FETCH-LOGICAL-c425t-58c53537d20134f4342f4097d3e35ab06a7c5ac0d6837c47dccab01119cf65d23</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0925527313000200$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Feng, Xuehao</creatorcontrib><creatorcontrib>Moon, Ilkyeong</creatorcontrib><creatorcontrib>Ryu, Kwangyeol</creatorcontrib><title>Revenue-sharing contracts in an N-stage supply chain with reliability considerations</title><title>International journal of production economics</title><description>Revenue-sharing (RS) contracts have been used in a number of industries and have proven to be effective. However, the current RS contracts can be limited when improving the supply chain performance because of member reliability issues. This paper studies a revenue-sharing with reliability (RSR) contract in an N-stage supply chain. In this type of supply chain, there are more than two stages, and certain members have more than one upstream member. First, we propose an RSR contract that can coordinate supply chains and arbitrarily allocate total profits. A two-round profit allocation mechanism is utilized in this RSR contract. In the first round, an initial profit allocation scenario is decided; in the second round, the allocation is adjusted by considering the reliability of all of the members. A flexible method for adjusting the profits in the second round is proposed. Second, we study the incentives for the members to improve their reliability under the RS and RSR contracts by considering two realistic types of improvement investments in reliability. It is found that, in some cases, the RS contracts are limited in terms of encouraging the members to improve their reliability. Next, we show that there are greater incentives for members to improve their reliability under an RSR contract. We discuss in what cases the maximum possible profit of the supply chain under the RSR contract is higher than under the RS contract. Our analytical and numerical results yield insights into how managers can be encouraged to improve their reliability by setting certain decision variables.</description><subject>Allocations</subject><subject>Contracts</subject><subject>Corporate profits</subject><subject>Economics</subject><subject>Incentives</subject><subject>Mathematical analysis</subject><subject>Mathematical models</subject><subject>Profits</subject><subject>Reliability</subject><subject>Resource allocation</subject><subject>Revenue sharing</subject><subject>Studies</subject><subject>Supply chain</subject><subject>Supply chain management</subject><subject>Supply chains</subject><subject>Two-round profit allocation</subject><subject>Upstream</subject><issn>0925-5273</issn><issn>1873-7579</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2014</creationdate><recordtype>article</recordtype><recordid>eNp9kE1Lw0AQhhdRsFb_gKeAFy-J-5lNwIsUv6AoSD0v282k3ZAmcXdT6b93Qz15kDnMMLzP8M6L0DXBGcEkv2sy2wyQUUxYhkmGMT1BM1JIlkohy1M0wyUVqaCSnaML7xuMsSRFMUOrD9hDN0Lqt9rZbpOYvgtOm-AT2yW6S95SH_QGEj8OQ3tIzFbH_bcN28RBa_XatjYcJsrbCpwONk6X6KzWrYer3z5Hn0-Pq8VLunx_fl08LFPDqQipKIxggslqss1rzjitOS5lxYAJvca5lkZog6u8YNJwWRkTt4SQ0tS5qCibo9vj3cH1XyP4oHbWG2hb3UE_ekUEI5iWOS-j9OaPtOlH10V3ivBcxiJcRBU9qozrvXdQq8HZnXYHRbCaglaNmoJWk2OFiYpBR-j-CEF8dW_BKW8sdAYq68AEVfX2P_wHyf2GZQ</recordid><startdate>201401</startdate><enddate>201401</enddate><creator>Feng, Xuehao</creator><creator>Moon, Ilkyeong</creator><creator>Ryu, Kwangyeol</creator><general>Elsevier B.V</general><general>Elsevier Sequoia S.A</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7TA</scope><scope>7TB</scope><scope>8FD</scope><scope>FR3</scope><scope>JG9</scope><scope>KR7</scope></search><sort><creationdate>201401</creationdate><title>Revenue-sharing contracts in an N-stage supply chain with reliability considerations</title><author>Feng, Xuehao ; Moon, Ilkyeong ; Ryu, Kwangyeol</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c425t-58c53537d20134f4342f4097d3e35ab06a7c5ac0d6837c47dccab01119cf65d23</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2014</creationdate><topic>Allocations</topic><topic>Contracts</topic><topic>Corporate profits</topic><topic>Economics</topic><topic>Incentives</topic><topic>Mathematical analysis</topic><topic>Mathematical models</topic><topic>Profits</topic><topic>Reliability</topic><topic>Resource allocation</topic><topic>Revenue sharing</topic><topic>Studies</topic><topic>Supply chain</topic><topic>Supply chain management</topic><topic>Supply chains</topic><topic>Two-round profit allocation</topic><topic>Upstream</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Feng, Xuehao</creatorcontrib><creatorcontrib>Moon, Ilkyeong</creatorcontrib><creatorcontrib>Ryu, Kwangyeol</creatorcontrib><collection>CrossRef</collection><collection>Materials Business File</collection><collection>Mechanical &amp; Transportation Engineering Abstracts</collection><collection>Technology Research Database</collection><collection>Engineering Research Database</collection><collection>Materials Research Database</collection><collection>Civil Engineering Abstracts</collection><jtitle>International journal of production economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Feng, Xuehao</au><au>Moon, Ilkyeong</au><au>Ryu, Kwangyeol</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Revenue-sharing contracts in an N-stage supply chain with reliability considerations</atitle><jtitle>International journal of production economics</jtitle><date>2014-01</date><risdate>2014</risdate><volume>147</volume><spage>20</spage><epage>29</epage><pages>20-29</pages><issn>0925-5273</issn><eissn>1873-7579</eissn><coden>IJPCEY</coden><abstract>Revenue-sharing (RS) contracts have been used in a number of industries and have proven to be effective. However, the current RS contracts can be limited when improving the supply chain performance because of member reliability issues. This paper studies a revenue-sharing with reliability (RSR) contract in an N-stage supply chain. In this type of supply chain, there are more than two stages, and certain members have more than one upstream member. First, we propose an RSR contract that can coordinate supply chains and arbitrarily allocate total profits. A two-round profit allocation mechanism is utilized in this RSR contract. In the first round, an initial profit allocation scenario is decided; in the second round, the allocation is adjusted by considering the reliability of all of the members. A flexible method for adjusting the profits in the second round is proposed. Second, we study the incentives for the members to improve their reliability under the RS and RSR contracts by considering two realistic types of improvement investments in reliability. It is found that, in some cases, the RS contracts are limited in terms of encouraging the members to improve their reliability. Next, we show that there are greater incentives for members to improve their reliability under an RSR contract. We discuss in what cases the maximum possible profit of the supply chain under the RSR contract is higher than under the RS contract. Our analytical and numerical results yield insights into how managers can be encouraged to improve their reliability by setting certain decision variables.</abstract><cop>Amsterdam</cop><pub>Elsevier B.V</pub><doi>10.1016/j.ijpe.2013.01.002</doi><tpages>10</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0925-5273
ispartof International journal of production economics, 2014-01, Vol.147, p.20-29
issn 0925-5273
1873-7579
language eng
recordid cdi_proquest_miscellaneous_1531029649
source Elsevier ScienceDirect Journals
subjects Allocations
Contracts
Corporate profits
Economics
Incentives
Mathematical analysis
Mathematical models
Profits
Reliability
Resource allocation
Revenue sharing
Studies
Supply chain
Supply chain management
Supply chains
Two-round profit allocation
Upstream
title Revenue-sharing contracts in an N-stage supply chain with reliability considerations
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-08T14%3A58%3A00IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Revenue-sharing%20contracts%20in%20an%20N-stage%20supply%20chain%20with%20reliability%20considerations&rft.jtitle=International%20journal%20of%20production%20economics&rft.au=Feng,%20Xuehao&rft.date=2014-01&rft.volume=147&rft.spage=20&rft.epage=29&rft.pages=20-29&rft.issn=0925-5273&rft.eissn=1873-7579&rft.coden=IJPCEY&rft_id=info:doi/10.1016/j.ijpe.2013.01.002&rft_dat=%3Cproquest_cross%3E1531029649%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1467676145&rft_id=info:pmid/&rft_els_id=S0925527313000200&rfr_iscdi=true