A post trip operational guidance system for BWR plants

A post trip operational guidance system (PTOG) for BWR power plants was developed to support the operators in achieving safe plant shutdown after a scram. The objective of PTOG is to support the operators in collecting plant information, in diagnosing plant status and in deciding corrective actions....

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Nuclear engineering and design 1989, Vol.110 (3), p.385-393
Hauptverfasser: Takizawa, Yoji, Hayashi, Toshifumi, Saijou, Nobuyuki, Morioka, Toshihiko
Format: Artikel
Sprache:eng
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!