Biogas production from cheese whey wastewater: laboratory- and full-scale studies

A two-phase system for biogas production from cheese whey wastewater (CWW) was designed, set up and operated at laboratory and full scale for a whole cheese production season (8-9 months). The high efficiency and stability of the laboratory-scale system was demonstrated under various organic loading...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Water science and technology 2014-01, Vol.69 (6), p.1320-1325
Hauptverfasser: STAMATELATOU, K, GIANTSIOU, N, DIAMANTIS, V, ALEXANDRIDIS, C, ALEXANDRIDIS, A, AIVASIDIS, A
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!