Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground

This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represen...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Progress in oceanography 1987-01, Vol.18 (1-4), p.61-78
Hauptverfasser: Newman, Walter S., Fairbridge, Rhodes W.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 78
container_issue 1-4
container_start_page 61
container_title Progress in oceanography
container_volume 18
creator Newman, Walter S.
Fairbridge, Rhodes W.
description This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sealevel regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of "Project NOAH".
doi_str_mv 10.1016/0079-6611(87)90026-7
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_14911435</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>14911435</sourcerecordid><originalsourceid>FETCH-LOGICAL-a305t-971edda94ab356bad2a9d11cfcb50e1ac62563fed09baad2e29fabcf4b88951b3</originalsourceid><addsrcrecordid>eNo9kD1PwzAURT2ARCn8AwZPCIYUOx9O3K2qgBZVtEJ0tp7tl5LKSYqdIPHvSSliutK9R3c4hNxwNuGMiwfGchkJwfldkd9LxmIR5Wdk9F9fkMsQ9mwYmIhHZL3x7R5NR1_Xs8WUvuGud9BVzY7WrUXf0IAQOfxCR30VcEI3HxCQLpdT-oK-D-CwpttmQHe-7Rt7Rc5LcAGv_3JMtk-P7_NFtFo_L-ezVQQJy7pI5hytBZmCTjKhwcYgLeemNDpjyMGIOBNJiZZJDcOKsSxBmzLVRSEzrpMxuT39Hnz72WPoVF0Fg85Bg20fFE8l52mSDWB6Ao1vQ_BYqoOvavDfijN1NKaOatRRjSpy9WtM5ckPlHNhLQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>14911435</pqid></control><display><type>article</type><title>Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground</title><source>ScienceDirect Journals (5 years ago - present)</source><creator>Newman, Walter S. ; Fairbridge, Rhodes W.</creator><creatorcontrib>Newman, Walter S. ; Fairbridge, Rhodes W.</creatorcontrib><description>This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sealevel regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of "Project NOAH".</description><identifier>ISSN: 0079-6611</identifier><identifier>DOI: 10.1016/0079-6611(87)90026-7</identifier><language>eng</language><subject>Marine</subject><ispartof>Progress in oceanography, 1987-01, Vol.18 (1-4), p.61-78</ispartof><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-a305t-971edda94ab356bad2a9d11cfcb50e1ac62563fed09baad2e29fabcf4b88951b3</citedby><cites>FETCH-LOGICAL-a305t-971edda94ab356bad2a9d11cfcb50e1ac62563fed09baad2e29fabcf4b88951b3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27923,27924</link.rule.ids></links><search><creatorcontrib>Newman, Walter S.</creatorcontrib><creatorcontrib>Fairbridge, Rhodes W.</creatorcontrib><title>Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground</title><title>Progress in oceanography</title><description>This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sealevel regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of "Project NOAH".</description><subject>Marine</subject><issn>0079-6611</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>1987</creationdate><recordtype>article</recordtype><recordid>eNo9kD1PwzAURT2ARCn8AwZPCIYUOx9O3K2qgBZVtEJ0tp7tl5LKSYqdIPHvSSliutK9R3c4hNxwNuGMiwfGchkJwfldkd9LxmIR5Wdk9F9fkMsQ9mwYmIhHZL3x7R5NR1_Xs8WUvuGud9BVzY7WrUXf0IAQOfxCR30VcEI3HxCQLpdT-oK-D-CwpttmQHe-7Rt7Rc5LcAGv_3JMtk-P7_NFtFo_L-ezVQQJy7pI5hytBZmCTjKhwcYgLeemNDpjyMGIOBNJiZZJDcOKsSxBmzLVRSEzrpMxuT39Hnz72WPoVF0Fg85Bg20fFE8l52mSDWB6Ao1vQ_BYqoOvavDfijN1NKaOatRRjSpy9WtM5ckPlHNhLQ</recordid><startdate>198701</startdate><enddate>198701</enddate><creator>Newman, Walter S.</creator><creator>Fairbridge, Rhodes W.</creator><scope>AAYXX</scope><scope>CITATION</scope><scope>7TN</scope><scope>F1W</scope><scope>H96</scope><scope>L.G</scope></search><sort><creationdate>198701</creationdate><title>Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground</title><author>Newman, Walter S. ; Fairbridge, Rhodes W.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-a305t-971edda94ab356bad2a9d11cfcb50e1ac62563fed09baad2e29fabcf4b88951b3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>1987</creationdate><topic>Marine</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Newman, Walter S.</creatorcontrib><creatorcontrib>Fairbridge, Rhodes W.</creatorcontrib><collection>CrossRef</collection><collection>Oceanic Abstracts</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) 2: Ocean Technology, Policy &amp; Non-Living Resources</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) Professional</collection><jtitle>Progress in oceanography</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Newman, Walter S.</au><au>Fairbridge, Rhodes W.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground</atitle><jtitle>Progress in oceanography</jtitle><date>1987-01</date><risdate>1987</risdate><volume>18</volume><issue>1-4</issue><spage>61</spage><epage>78</epage><pages>61-78</pages><issn>0079-6611</issn><abstract>This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sealevel regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of "Project NOAH".</abstract><doi>10.1016/0079-6611(87)90026-7</doi><tpages>18</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0079-6611
ispartof Progress in oceanography, 1987-01, Vol.18 (1-4), p.61-78
issn 0079-6611
language eng
recordid cdi_proquest_miscellaneous_14911435
source ScienceDirect Journals (5 years ago - present)
subjects Marine
title Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T17%3A24%3A31IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Project%20NOAH:%20Regulating%20modern%20sea-level%20rise.%20Phase%20II:%20Jerusalem%20Underground&rft.jtitle=Progress%20in%20oceanography&rft.au=Newman,%20Walter%20S.&rft.date=1987-01&rft.volume=18&rft.issue=1-4&rft.spage=61&rft.epage=78&rft.pages=61-78&rft.issn=0079-6611&rft_id=info:doi/10.1016/0079-6611(87)90026-7&rft_dat=%3Cproquest_cross%3E14911435%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=14911435&rft_id=info:pmid/&rfr_iscdi=true