Large-scale impacts of hydroelectric development

The substantial size of some hydroelectric projects and the extensive total surface area covered by reservoirs globally require that research determining the impacts of these developments be done at ever-increasing spatial and temporal scales. As a consequence of this research, new views are emergin...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Environmental reviews 1997, Vol.5 (1), p.27-54
Hauptverfasser: Rosenberg, D M, Berkes, F, Bodaly, R A, Hecky, R E, Kelly, C A, Rudd, J WM
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The substantial size of some hydroelectric projects and the extensive total surface area covered by reservoirs globally require that research determining the impacts of these developments be done at ever-increasing spatial and temporal scales. As a consequence of this research, new views are emerging about the spatial extent and longevity of the environmental and social impacts of such developments. New findings challenge the notion of hydroelectric development as a benign alternative to other forms of power generation. This review examines the intertwined environmental and social effects of methylmercury bioaccumulation in the food web, emission of greenhouse gases from reservoirs, downstream effects of altered flows, and impacts on biodiversity, each of which operates at its own unique spatial and temporal scales. Methylmercury bioaccumulation occurs at the smallest spatial and temporal scales of the four impacts reviewed, whereas downstream effects usually occur at the largest scales. Greenhouse gas emissions, the newest surprise connected with large-scale hydroelectric development, are relatively short term but eventually may have important global-scale consequences. Limitation of biodiversity by hydroelectric development usually occurs at intermediate spatial and temporal scales. Knowledge developed from working at expanded spatial and temporal scales should be an important part of future decision making for large-scale hydroelectric development.
ISSN:1181-8700
1208-6053
1208-6053
DOI:10.1139/a97-001