Linking process to outcomes — Internal and external criteria for a stakeholder involvement in River Basin Management Planning

Within the natural resource management and environmental governance literature, a number of authors have argued that there is a need to pay better attention to how the social processes of planning and management influence the outcomes of such processes. These outcomes are often measured through the...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Ecological economics 2012-05, Vol.77, p.113-122
Hauptverfasser: Blackstock, K.L., Waylen, K.A., Dunglinson, J., Marshall, K.M.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 122
container_issue
container_start_page 113
container_title Ecological economics
container_volume 77
creator Blackstock, K.L.
Waylen, K.A.
Dunglinson, J.
Marshall, K.M.
description Within the natural resource management and environmental governance literature, a number of authors have argued that there is a need to pay better attention to how the social processes of planning and management influence the outcomes of such processes. These outcomes are often measured through the quality of their outputs (plans or strategies) as well as whether the objectives of the plans or strategies are achieved. This paper contributes to this debate by reporting on a longitudinal evaluation of stakeholder engagement in developing and implementing River Basin Management Planning (RBMP) in Scotland. We illustrate how many of the process and outcome criteria promoted in the literature (the external perspective) appear to be less important to stakeholders than would be expected (the internal perspective). The paper argues that a combination of internal and external criteria is best placed to understand how to judge a ‘good’ process. This paper draws on literature from water management, other natural resource management sectors, spatial planning and environmental management,, so the findings are of interest to scholars interested in evaluation, participation, environmental or natural resource management, as well as those specifically interested in RBMP under the Water Framework Directive (WFD). ► There is little longitudinal empirical research evaluating stakeholder involvement. ► We assess stakeholder involvement in Scottish River Basin Management Planning. ► We use internal criteria, from participants, and external criteria, from literature. ► The different criteria complemented one another so both should be used. ► Participants evaluated the process favourably but a follow up study is required.
doi_str_mv 10.1016/j.ecolecon.2012.02.015
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_miscellaneous_1151041211</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><els_id>S0921800912000791</els_id><sourcerecordid>1151041211</sourcerecordid><originalsourceid>FETCH-LOGICAL-c498t-b1316b54d90b226c613f9bff558a0e0adfd1453fb4a83e25ee3275109eebe6cc3</originalsourceid><addsrcrecordid>eNqNkdGuEyEQhonRxFp9BcOlN1tngKW7d2pz1CY1GqPXhGVnKz1bOAe2jV7pQ_iEPok0rdc1GcLP8M0MzDD2HGGBgPrlbkEujmWFhQAUCyiG9QM2w2YpK42gH7IZtAKrBqB9zJ7kvAMArVs5Yz83Ptz6sOV3KTrKmU-Rx8Pk4p4y__PrN1-HiVKwI7eh5_T9cnDJF-UtH2LilufJ3tK3OPaUuA_HOB5pT2Eqmn_2x-J8Y3PRH2yw2_PNp9GGUOo-ZY8GO2Z6dtnn7Ovbmy-r99Xm47v16vWmcqptpqpDibqrVd9CJ4R2GuXQdsNQ140FAtsPPapaDp2yjSRRE0mxrBFaoo60c3LOXpzzln_eHyhPZu-zo7E8g-IhG8RCKxSI11EQElsllvI_UFQIoJQqqD6jLsWcEw3mLvm9TT8KdOK02Zl_czSnORoohnUJfHUOpNKeo6dksvMUHPU-kZtMH_21FH8BWzysSA</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>1014100444</pqid></control><display><type>article</type><title>Linking process to outcomes — Internal and external criteria for a stakeholder involvement in River Basin Management Planning</title><source>PAIS Index</source><source>Elsevier ScienceDirect Journals</source><creator>Blackstock, K.L. ; Waylen, K.A. ; Dunglinson, J. ; Marshall, K.M.</creator><creatorcontrib>Blackstock, K.L. ; Waylen, K.A. ; Dunglinson, J. ; Marshall, K.M.</creatorcontrib><description>Within the natural resource management and environmental governance literature, a number of authors have argued that there is a need to pay better attention to how the social processes of planning and management influence the outcomes of such processes. These outcomes are often measured through the quality of their outputs (plans or strategies) as well as whether the objectives of the plans or strategies are achieved. This paper contributes to this debate by reporting on a longitudinal evaluation of stakeholder engagement in developing and implementing River Basin Management Planning (RBMP) in Scotland. We illustrate how many of the process and outcome criteria promoted in the literature (the external perspective) appear to be less important to stakeholders than would be expected (the internal perspective). The paper argues that a combination of internal and external criteria is best placed to understand how to judge a ‘good’ process. This paper draws on literature from water management, other natural resource management sectors, spatial planning and environmental management,, so the findings are of interest to scholars interested in evaluation, participation, environmental or natural resource management, as well as those specifically interested in RBMP under the Water Framework Directive (WFD). ► There is little longitudinal empirical research evaluating stakeholder involvement. ► We assess stakeholder involvement in Scottish River Basin Management Planning. ► We use internal criteria, from participants, and external criteria, from literature. ► The different criteria complemented one another so both should be used. ► Participants evaluated the process favourably but a follow up study is required.</description><identifier>ISSN: 0921-8009</identifier><identifier>EISSN: 1873-6106</identifier><identifier>DOI: 10.1016/j.ecolecon.2012.02.015</identifier><language>eng</language><publisher>Elsevier B.V</publisher><subject>Criteria ; Ecology ; Economics ; Environmental policy ; Evaluation ; Freshwater ; Government and politics ; Natural resources ; Planning ; Planning methods ; Resource management ; River basin management planning ; River basins ; Rivers ; Scotland ; Stakeholder ; United Kingdom ; Water ; Water Framework Directive ; Water management</subject><ispartof>Ecological economics, 2012-05, Vol.77, p.113-122</ispartof><rights>2012 Elsevier B.V.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c498t-b1316b54d90b226c613f9bff558a0e0adfd1453fb4a83e25ee3275109eebe6cc3</citedby><cites>FETCH-LOGICAL-c498t-b1316b54d90b226c613f9bff558a0e0adfd1453fb4a83e25ee3275109eebe6cc3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://www.sciencedirect.com/science/article/pii/S0921800912000791$$EHTML$$P50$$Gelsevier$$H</linktohtml><link.rule.ids>314,776,780,3537,27842,27901,27902,65306</link.rule.ids></links><search><creatorcontrib>Blackstock, K.L.</creatorcontrib><creatorcontrib>Waylen, K.A.</creatorcontrib><creatorcontrib>Dunglinson, J.</creatorcontrib><creatorcontrib>Marshall, K.M.</creatorcontrib><title>Linking process to outcomes — Internal and external criteria for a stakeholder involvement in River Basin Management Planning</title><title>Ecological economics</title><description>Within the natural resource management and environmental governance literature, a number of authors have argued that there is a need to pay better attention to how the social processes of planning and management influence the outcomes of such processes. These outcomes are often measured through the quality of their outputs (plans or strategies) as well as whether the objectives of the plans or strategies are achieved. This paper contributes to this debate by reporting on a longitudinal evaluation of stakeholder engagement in developing and implementing River Basin Management Planning (RBMP) in Scotland. We illustrate how many of the process and outcome criteria promoted in the literature (the external perspective) appear to be less important to stakeholders than would be expected (the internal perspective). The paper argues that a combination of internal and external criteria is best placed to understand how to judge a ‘good’ process. This paper draws on literature from water management, other natural resource management sectors, spatial planning and environmental management,, so the findings are of interest to scholars interested in evaluation, participation, environmental or natural resource management, as well as those specifically interested in RBMP under the Water Framework Directive (WFD). ► There is little longitudinal empirical research evaluating stakeholder involvement. ► We assess stakeholder involvement in Scottish River Basin Management Planning. ► We use internal criteria, from participants, and external criteria, from literature. ► The different criteria complemented one another so both should be used. ► Participants evaluated the process favourably but a follow up study is required.</description><subject>Criteria</subject><subject>Ecology</subject><subject>Economics</subject><subject>Environmental policy</subject><subject>Evaluation</subject><subject>Freshwater</subject><subject>Government and politics</subject><subject>Natural resources</subject><subject>Planning</subject><subject>Planning methods</subject><subject>Resource management</subject><subject>River basin management planning</subject><subject>River basins</subject><subject>Rivers</subject><subject>Scotland</subject><subject>Stakeholder</subject><subject>United Kingdom</subject><subject>Water</subject><subject>Water Framework Directive</subject><subject>Water management</subject><issn>0921-8009</issn><issn>1873-6106</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2012</creationdate><recordtype>article</recordtype><sourceid>7TQ</sourceid><recordid>eNqNkdGuEyEQhonRxFp9BcOlN1tngKW7d2pz1CY1GqPXhGVnKz1bOAe2jV7pQ_iEPok0rdc1GcLP8M0MzDD2HGGBgPrlbkEujmWFhQAUCyiG9QM2w2YpK42gH7IZtAKrBqB9zJ7kvAMArVs5Yz83Ptz6sOV3KTrKmU-Rx8Pk4p4y__PrN1-HiVKwI7eh5_T9cnDJF-UtH2LilufJ3tK3OPaUuA_HOB5pT2Eqmn_2x-J8Y3PRH2yw2_PNp9GGUOo-ZY8GO2Z6dtnn7Ovbmy-r99Xm47v16vWmcqptpqpDibqrVd9CJ4R2GuXQdsNQ140FAtsPPapaDp2yjSRRE0mxrBFaoo60c3LOXpzzln_eHyhPZu-zo7E8g-IhG8RCKxSI11EQElsllvI_UFQIoJQqqD6jLsWcEw3mLvm9TT8KdOK02Zl_czSnORoohnUJfHUOpNKeo6dksvMUHPU-kZtMH_21FH8BWzysSA</recordid><startdate>201205</startdate><enddate>201205</enddate><creator>Blackstock, K.L.</creator><creator>Waylen, K.A.</creator><creator>Dunglinson, J.</creator><creator>Marshall, K.M.</creator><general>Elsevier B.V</general><scope>AAYXX</scope><scope>CITATION</scope><scope>7QH</scope><scope>7SN</scope><scope>7ST</scope><scope>7TG</scope><scope>7U6</scope><scope>7UA</scope><scope>C1K</scope><scope>F1W</scope><scope>H97</scope><scope>KL.</scope><scope>L.G</scope><scope>SOI</scope><scope>8BJ</scope><scope>FQK</scope><scope>JBE</scope><scope>7TQ</scope><scope>DHY</scope><scope>DON</scope></search><sort><creationdate>201205</creationdate><title>Linking process to outcomes — Internal and external criteria for a stakeholder involvement in River Basin Management Planning</title><author>Blackstock, K.L. ; Waylen, K.A. ; Dunglinson, J. ; Marshall, K.M.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c498t-b1316b54d90b226c613f9bff558a0e0adfd1453fb4a83e25ee3275109eebe6cc3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2012</creationdate><topic>Criteria</topic><topic>Ecology</topic><topic>Economics</topic><topic>Environmental policy</topic><topic>Evaluation</topic><topic>Freshwater</topic><topic>Government and politics</topic><topic>Natural resources</topic><topic>Planning</topic><topic>Planning methods</topic><topic>Resource management</topic><topic>River basin management planning</topic><topic>River basins</topic><topic>Rivers</topic><topic>Scotland</topic><topic>Stakeholder</topic><topic>United Kingdom</topic><topic>Water</topic><topic>Water Framework Directive</topic><topic>Water management</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Blackstock, K.L.</creatorcontrib><creatorcontrib>Waylen, K.A.</creatorcontrib><creatorcontrib>Dunglinson, J.</creatorcontrib><creatorcontrib>Marshall, K.M.</creatorcontrib><collection>CrossRef</collection><collection>Aqualine</collection><collection>Ecology Abstracts</collection><collection>Environment Abstracts</collection><collection>Meteorological &amp; Geoastrophysical Abstracts</collection><collection>Sustainability Science Abstracts</collection><collection>Water Resources Abstracts</collection><collection>Environmental Sciences and Pollution Management</collection><collection>ASFA: Aquatic Sciences and Fisheries Abstracts</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) 3: Aquatic Pollution &amp; Environmental Quality</collection><collection>Meteorological &amp; Geoastrophysical Abstracts - Academic</collection><collection>Aquatic Science &amp; Fisheries Abstracts (ASFA) Professional</collection><collection>Environment Abstracts</collection><collection>International Bibliography of the Social Sciences (IBSS)</collection><collection>International Bibliography of the Social Sciences</collection><collection>International Bibliography of the Social Sciences</collection><collection>PAIS Index</collection><collection>PAIS International</collection><collection>PAIS International (Ovid)</collection><jtitle>Ecological economics</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Blackstock, K.L.</au><au>Waylen, K.A.</au><au>Dunglinson, J.</au><au>Marshall, K.M.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Linking process to outcomes — Internal and external criteria for a stakeholder involvement in River Basin Management Planning</atitle><jtitle>Ecological economics</jtitle><date>2012-05</date><risdate>2012</risdate><volume>77</volume><spage>113</spage><epage>122</epage><pages>113-122</pages><issn>0921-8009</issn><eissn>1873-6106</eissn><abstract>Within the natural resource management and environmental governance literature, a number of authors have argued that there is a need to pay better attention to how the social processes of planning and management influence the outcomes of such processes. These outcomes are often measured through the quality of their outputs (plans or strategies) as well as whether the objectives of the plans or strategies are achieved. This paper contributes to this debate by reporting on a longitudinal evaluation of stakeholder engagement in developing and implementing River Basin Management Planning (RBMP) in Scotland. We illustrate how many of the process and outcome criteria promoted in the literature (the external perspective) appear to be less important to stakeholders than would be expected (the internal perspective). The paper argues that a combination of internal and external criteria is best placed to understand how to judge a ‘good’ process. This paper draws on literature from water management, other natural resource management sectors, spatial planning and environmental management,, so the findings are of interest to scholars interested in evaluation, participation, environmental or natural resource management, as well as those specifically interested in RBMP under the Water Framework Directive (WFD). ► There is little longitudinal empirical research evaluating stakeholder involvement. ► We assess stakeholder involvement in Scottish River Basin Management Planning. ► We use internal criteria, from participants, and external criteria, from literature. ► The different criteria complemented one another so both should be used. ► Participants evaluated the process favourably but a follow up study is required.</abstract><pub>Elsevier B.V</pub><doi>10.1016/j.ecolecon.2012.02.015</doi><tpages>10</tpages></addata></record>
fulltext fulltext
identifier ISSN: 0921-8009
ispartof Ecological economics, 2012-05, Vol.77, p.113-122
issn 0921-8009
1873-6106
language eng
recordid cdi_proquest_miscellaneous_1151041211
source PAIS Index; Elsevier ScienceDirect Journals
subjects Criteria
Ecology
Economics
Environmental policy
Evaluation
Freshwater
Government and politics
Natural resources
Planning
Planning methods
Resource management
River basin management planning
River basins
Rivers
Scotland
Stakeholder
United Kingdom
Water
Water Framework Directive
Water management
title Linking process to outcomes — Internal and external criteria for a stakeholder involvement in River Basin Management Planning
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T19%3A36%3A04IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Linking%20process%20to%20outcomes%20%E2%80%94%20Internal%20and%20external%20criteria%20for%20a%20stakeholder%20involvement%20in%20River%20Basin%20Management%20Planning&rft.jtitle=Ecological%20economics&rft.au=Blackstock,%20K.L.&rft.date=2012-05&rft.volume=77&rft.spage=113&rft.epage=122&rft.pages=113-122&rft.issn=0921-8009&rft.eissn=1873-6106&rft_id=info:doi/10.1016/j.ecolecon.2012.02.015&rft_dat=%3Cproquest_cross%3E1151041211%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=1014100444&rft_id=info:pmid/&rft_els_id=S0921800912000791&rfr_iscdi=true