The effects of task complexity and time pressure upon team productivity
Using 72 college students as Ss, team productivity was studied under a contract with the Office of Naval Research. 24 3-man teams performed assembly tasks under 2 levels of difficulty and 3 levels of time pressure. The task should be complex enough to reduce boredom but not exceed a moderate acceler...
Gespeichert in:
Veröffentlicht in: | Journal of applied psychology 1960-02, Vol.44 (1), p.34-38 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Using 72 college students as Ss, team productivity was studied under a contract with the Office of Naval Research. 24 3-man teams performed assembly tasks under 2 levels of difficulty and 3 levels of time pressure. The task should be complex enough to reduce boredom but not exceed a moderate acceleration of time pressure. |
---|---|
ISSN: | 0021-9010 1939-1854 |
DOI: | 10.1037/h0039877 |