Developing Estimation Equations for the Cerchar Abrasivity Index of Rocks Applicable to TBM Tunnels
Rock abrasivity plays an important role in the machine design, construction scheduling, and budgeting of TBM projects. Establishing several faster and simpler estimation equations for the Cerchar Abrasivity Index (CAI) of rocks is, therefore, very important. This study investigated the correlation b...
Gespeichert in:
Veröffentlicht in: | Rock mechanics and rock engineering 2024-10, Vol.57 (10), p.8879-8898 |
---|---|
Hauptverfasser: | , , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Rock abrasivity plays an important role in the machine design, construction scheduling, and budgeting of TBM projects. Establishing several faster and simpler estimation equations for the Cerchar Abrasivity Index (CAI) of rocks is, therefore, very important. This study investigated the correlation between the CAI and mechanical properties of rock, rock mass classification parameters, and machine performance. A TBM construction database including 159 tunnel sections is established. Several acceptable and practical estimation equations of CAI are developed using simple and multiple regression analysis (0.66 |
---|---|
ISSN: | 0723-2632 1434-453X |
DOI: | 10.1007/s00603-024-04015-0 |