Optimizing Sequential Excavation Method for Ground Settlement Control in Tehran Subway Tunnel Line 6

The present study aims to investigate the excavation method, excavation sequence, and optimum trailing distance between excavation stages of the tunnel face to control ground settlement caused by constructing the Tehran Subway Tunnel-Line 6 in the northern part. To this end, 3D numerical modeling is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Geotechnical and geological engineering 2024-07, Vol.42 (5), p.3595-3614
Hauptverfasser: Aghajari, Meysam, Dehghan, Ali Naghi, Lajevardi, Seyed Hamid
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!