Integrated optimization of line planning and timetabling on high-speed railway network considering cross-line operation
With the implementation of cross-line operation in high-speed railway system, accessibility of cross-line passengers on the railway network has substantially improved. However, due to limitations of capacity, it is hard to schedule a conflict-free timetable based on a train line plan with many cross...
Gespeichert in:
Veröffentlicht in: | Advances in production engineering & management 2024-03, Vol.19 (1), p.117-132 |
---|---|
Hauptverfasser: | , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!