Development of a maintenance scheduling method for power generators considering large penetration of variable renewable energy sources and system inertia

Conventional methods to schedule power generators maintenance aim to secure enough supply reserve margin to the power system when its power generators have to go under maintenance. However, the use of such methods in scenarios of large penetration of VRE, might be problematic. This is because in suc...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Electrical engineering in Japan 2024-06, Vol.217 (2), p.n/a
Hauptverfasser: Segawa, Shuhei, Ogimoto, Kazuhiko, Azuma, Hitoshi, Isonaga, Akira, Fukutome, Suguru
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!