Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support

This study explains the opportunities of prefabricated modular construction, which includes using building information modeling technology. The findings of this research can help managers and stakeholders understand the opportunities and risks of using modular materials and Building Information Mode...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Architecture, Structures and Construction Structures and Construction, 2024-03, Vol.4 (1), p.55-69
Hauptverfasser: Abbasi, Alireza, Saberi, Vahid, Eghbali, Hosein, Saberi, Hamid
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page 69
container_issue 1
container_start_page 55
container_title Architecture, Structures and Construction
container_volume 4
creator Abbasi, Alireza
Saberi, Vahid
Eghbali, Hosein
Saberi, Hamid
description This study explains the opportunities of prefabricated modular construction, which includes using building information modeling technology. The findings of this research can help managers and stakeholders understand the opportunities and risks of using modular materials and Building Information Modeling technology. This research also encourages them to use this technology to improve construction management and the quality of hospital construction projects, prepare for plan changes increase, and deal with epidemics. This study investigates the effect of increasing the prefabrication level in hospital projects. Initially, 21 essential criteria in evaluating prefabricated construction were identified by studying related articles and sources and interviewing experts. Then, using the weighted average and the Likert method, 7 top criteria were identified by distributing a questionnaire to experts in this field. The weighting of the criteria was then performed using the questionnaire data and the Shannon entropy method. Next, the best opinions were identified using the VIKOR technique and Excel software based on experts' opinions and selected criteria. The findings revealed that increasing the level of prefabrication reduced the amount of time, the prevalence of infection, the cost of completing the project, and, in some cases, the cost of changing the plan. Moreover increasing the level of prefabrication also improves environmental sustainability, quality, durability, ease of operation, and safety. There are restrictions, particularly in accessing projects built with various prefabrication levels.
doi_str_mv 10.1007/s44150-023-00107-7
format Article
fullrecord <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_3033037509</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>3033037509</sourcerecordid><originalsourceid>FETCH-LOGICAL-c2087-8732a2e6522b54ea0f37461e2b96d8e3feb70f36f3c3b08b2abb7b665cf47d023</originalsourceid><addsrcrecordid>eNpVkc1KxDAUhYMoOIzzAq4Krqu3Sdt0ljL4BwNu1G1I0psxQ9vUJEV8HN_UdEYEIZDLuV8OnBxCLgu4LgD4TSjLooIcKMsBCuA5PyELyhnk62Zdnv7NTX1OViHsAYDRgpXAF-T7zeJnyIx3fabdEKKfdLRuyEbvDIaQRtmFLAnvLow2ym7e7FHH_3gvB7nDHoeYTcEOu6x37dRJn2g0UnmrZcQ2YRG9nR3l0GZqsl07w3Ywzqfdwcm12M1imMbR-XhBzkx6gKvfe0le7-9eNo_59vnhaXO7zTWFhucNZ1RSrCtKVVWiBMN4WRdI1bpuG2QGFU9abZhmChpFpVJc1XWlTcnb9HdLcnX0Tfk-JgxR7N3k5_SCAUuHV7BOFD1S2rsQUjYxettL_yUKEHMb4tiGSI7i0Ibg7AckSoKg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>3033037509</pqid></control><display><type>article</type><title>Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support</title><source>SpringerLink Journals - AutoHoldings</source><creator>Abbasi, Alireza ; Saberi, Vahid ; Eghbali, Hosein ; Saberi, Hamid</creator><creatorcontrib>Abbasi, Alireza ; Saberi, Vahid ; Eghbali, Hosein ; Saberi, Hamid</creatorcontrib><description>This study explains the opportunities of prefabricated modular construction, which includes using building information modeling technology. The findings of this research can help managers and stakeholders understand the opportunities and risks of using modular materials and Building Information Modeling technology. This research also encourages them to use this technology to improve construction management and the quality of hospital construction projects, prepare for plan changes increase, and deal with epidemics. This study investigates the effect of increasing the prefabrication level in hospital projects. Initially, 21 essential criteria in evaluating prefabricated construction were identified by studying related articles and sources and interviewing experts. Then, using the weighted average and the Likert method, 7 top criteria were identified by distributing a questionnaire to experts in this field. The weighting of the criteria was then performed using the questionnaire data and the Shannon entropy method. Next, the best opinions were identified using the VIKOR technique and Excel software based on experts' opinions and selected criteria. The findings revealed that increasing the level of prefabrication reduced the amount of time, the prevalence of infection, the cost of completing the project, and, in some cases, the cost of changing the plan. Moreover increasing the level of prefabrication also improves environmental sustainability, quality, durability, ease of operation, and safety. There are restrictions, particularly in accessing projects built with various prefabrication levels.</description><identifier>ISSN: 2730-9886</identifier><identifier>EISSN: 2730-9894</identifier><identifier>DOI: 10.1007/s44150-023-00107-7</identifier><language>eng</language><publisher>Guimarães: Springer Nature B.V</publisher><subject>Building construction ; Building information modeling ; Construction ; Coronaviruses ; COVID-19</subject><ispartof>Architecture, Structures and Construction, 2024-03, Vol.4 (1), p.55-69</ispartof><rights>The Author(s), under exclusive licence to Springer Nature Switzerland AG 2023. Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c2087-8732a2e6522b54ea0f37461e2b96d8e3feb70f36f3c3b08b2abb7b665cf47d023</citedby><cites>FETCH-LOGICAL-c2087-8732a2e6522b54ea0f37461e2b96d8e3feb70f36f3c3b08b2abb7b665cf47d023</cites><orcidid>0000-0001-9624-5448</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,780,784,27924,27925</link.rule.ids></links><search><creatorcontrib>Abbasi, Alireza</creatorcontrib><creatorcontrib>Saberi, Vahid</creatorcontrib><creatorcontrib>Eghbali, Hosein</creatorcontrib><creatorcontrib>Saberi, Hamid</creatorcontrib><title>Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support</title><title>Architecture, Structures and Construction</title><description>This study explains the opportunities of prefabricated modular construction, which includes using building information modeling technology. The findings of this research can help managers and stakeholders understand the opportunities and risks of using modular materials and Building Information Modeling technology. This research also encourages them to use this technology to improve construction management and the quality of hospital construction projects, prepare for plan changes increase, and deal with epidemics. This study investigates the effect of increasing the prefabrication level in hospital projects. Initially, 21 essential criteria in evaluating prefabricated construction were identified by studying related articles and sources and interviewing experts. Then, using the weighted average and the Likert method, 7 top criteria were identified by distributing a questionnaire to experts in this field. The weighting of the criteria was then performed using the questionnaire data and the Shannon entropy method. Next, the best opinions were identified using the VIKOR technique and Excel software based on experts' opinions and selected criteria. The findings revealed that increasing the level of prefabrication reduced the amount of time, the prevalence of infection, the cost of completing the project, and, in some cases, the cost of changing the plan. Moreover increasing the level of prefabrication also improves environmental sustainability, quality, durability, ease of operation, and safety. There are restrictions, particularly in accessing projects built with various prefabrication levels.</description><subject>Building construction</subject><subject>Building information modeling</subject><subject>Construction</subject><subject>Coronaviruses</subject><subject>COVID-19</subject><issn>2730-9886</issn><issn>2730-9894</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><recordid>eNpVkc1KxDAUhYMoOIzzAq4Krqu3Sdt0ljL4BwNu1G1I0psxQ9vUJEV8HN_UdEYEIZDLuV8OnBxCLgu4LgD4TSjLooIcKMsBCuA5PyELyhnk62Zdnv7NTX1OViHsAYDRgpXAF-T7zeJnyIx3fabdEKKfdLRuyEbvDIaQRtmFLAnvLow2ym7e7FHH_3gvB7nDHoeYTcEOu6x37dRJn2g0UnmrZcQ2YRG9nR3l0GZqsl07w3Ywzqfdwcm12M1imMbR-XhBzkx6gKvfe0le7-9eNo_59vnhaXO7zTWFhucNZ1RSrCtKVVWiBMN4WRdI1bpuG2QGFU9abZhmChpFpVJc1XWlTcnb9HdLcnX0Tfk-JgxR7N3k5_SCAUuHV7BOFD1S2rsQUjYxettL_yUKEHMb4tiGSI7i0Ibg7AckSoKg</recordid><startdate>20240301</startdate><enddate>20240301</enddate><creator>Abbasi, Alireza</creator><creator>Saberi, Vahid</creator><creator>Eghbali, Hosein</creator><creator>Saberi, Hamid</creator><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope><orcidid>https://orcid.org/0000-0001-9624-5448</orcidid></search><sort><creationdate>20240301</creationdate><title>Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support</title><author>Abbasi, Alireza ; Saberi, Vahid ; Eghbali, Hosein ; Saberi, Hamid</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c2087-8732a2e6522b54ea0f37461e2b96d8e3feb70f36f3c3b08b2abb7b665cf47d023</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><topic>Building construction</topic><topic>Building information modeling</topic><topic>Construction</topic><topic>Coronaviruses</topic><topic>COVID-19</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Abbasi, Alireza</creatorcontrib><creatorcontrib>Saberi, Vahid</creatorcontrib><creatorcontrib>Eghbali, Hosein</creatorcontrib><creatorcontrib>Saberi, Hamid</creatorcontrib><collection>CrossRef</collection><jtitle>Architecture, Structures and Construction</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Abbasi, Alireza</au><au>Saberi, Vahid</au><au>Eghbali, Hosein</au><au>Saberi, Hamid</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support</atitle><jtitle>Architecture, Structures and Construction</jtitle><date>2024-03-01</date><risdate>2024</risdate><volume>4</volume><issue>1</issue><spage>55</spage><epage>69</epage><pages>55-69</pages><issn>2730-9886</issn><eissn>2730-9894</eissn><abstract>This study explains the opportunities of prefabricated modular construction, which includes using building information modeling technology. The findings of this research can help managers and stakeholders understand the opportunities and risks of using modular materials and Building Information Modeling technology. This research also encourages them to use this technology to improve construction management and the quality of hospital construction projects, prepare for plan changes increase, and deal with epidemics. This study investigates the effect of increasing the prefabrication level in hospital projects. Initially, 21 essential criteria in evaluating prefabricated construction were identified by studying related articles and sources and interviewing experts. Then, using the weighted average and the Likert method, 7 top criteria were identified by distributing a questionnaire to experts in this field. The weighting of the criteria was then performed using the questionnaire data and the Shannon entropy method. Next, the best opinions were identified using the VIKOR technique and Excel software based on experts' opinions and selected criteria. The findings revealed that increasing the level of prefabrication reduced the amount of time, the prevalence of infection, the cost of completing the project, and, in some cases, the cost of changing the plan. Moreover increasing the level of prefabrication also improves environmental sustainability, quality, durability, ease of operation, and safety. There are restrictions, particularly in accessing projects built with various prefabrication levels.</abstract><cop>Guimarães</cop><pub>Springer Nature B.V</pub><doi>10.1007/s44150-023-00107-7</doi><tpages>15</tpages><orcidid>https://orcid.org/0000-0001-9624-5448</orcidid><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 2730-9886
ispartof Architecture, Structures and Construction, 2024-03, Vol.4 (1), p.55-69
issn 2730-9886
2730-9894
language eng
recordid cdi_proquest_journals_3033037509
source SpringerLink Journals - AutoHoldings
subjects Building construction
Building information modeling
Construction
Coronaviruses
COVID-19
title Views from construction professionals on hospital project construction management using modular prefabricated materials and building information modeling support
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-02T22%3A34%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Views%20from%20construction%20professionals%20on%20hospital%20project%20construction%20management%20using%20modular%20prefabricated%20materials%20and%20building%20information%20modeling%20support&rft.jtitle=Architecture,%20Structures%20and%20Construction&rft.au=Abbasi,%20Alireza&rft.date=2024-03-01&rft.volume=4&rft.issue=1&rft.spage=55&rft.epage=69&rft.pages=55-69&rft.issn=2730-9886&rft.eissn=2730-9894&rft_id=info:doi/10.1007/s44150-023-00107-7&rft_dat=%3Cproquest_cross%3E3033037509%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=3033037509&rft_id=info:pmid/&rfr_iscdi=true