Stability of the Rock Mass Reserved in front of Anti-slide Piles

To study the stability evaluation method and failure mode of reserved rock masses, the Yueyang landslide project was taken as the research object. First, based on the limit equilibrium method and elastic mechanics, the formulas for calculating the stability of a reserved rock mass were analyzed. Sec...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:KSCE journal of civil engineering 2022-02, Vol.26 (2), p.569-583
Hauptverfasser: Zhu, Dapeng, He, Lei, Qin, Liangkai
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!