Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation
Integrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a tw...
Gespeichert in:
Veröffentlicht in: | International journal of advanced manufacturing technology 2024-02, Vol.130 (9-10), p.4723-4749 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 4749 |
---|---|
container_issue | 9-10 |
container_start_page | 4723 |
container_title | International journal of advanced manufacturing technology |
container_volume | 130 |
creator | Bahou, Ziyad Lemnaouar, Mohamed Reda Krimi, Issam |
description | Integrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a two-stage solution for the integrated PM scheduling and production planning problem within multi-parallel component manufacturing systems, accounting for diverse interdependencies. These interdependencies encompass stochastic, structural, economic, and resource-related interdependencies, all while accounting for the resultant degradation. The primary objective is jointly optimizing costs associated with holding, backorders, production, setup, and maintenance. Initially, we employ an Ordinary Differential System to compute a realistic production capacity. Additionally, we analyze the effects of interdependence-induced degradation on system availability and failures. Subsequently, we formulate the problem as an integer programming model to determine an optimal joint plan. The effectiveness of our approach is validated through numerical examples and sensitivity analysis, providing insightful guidance for efficient PM scheduling and production planning, particularly in large-scale production systems. |
doi_str_mv | 10.1007/s00170-024-12975-4 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2918372541</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2918372541</sourcerecordid><originalsourceid>FETCH-LOGICAL-c319t-c8d20920a54fbce09c38441cdabfc260acec95c66bdbbbb41cd97d9c23cce423</originalsourceid><addsrcrecordid>eNp9kc1qHDEQhEWIIRvbL-CTwGcl-pu_YzBOYjD44rvQtnrWMhrNRNLY7DvlIaPxBpKT-yJofVVdUIRcCf5FcN59zZyLjjMuNRNy6BqmP5Cd0EoxxUXzkey4bHumurb_RD7n_FzxVrT9jvy-iwUPyRZ0NM6RwRGCBxvokvAFY_EvSCfrKxRtBKQZntCtwccDtdFVanYrFD9HugQb47Yf50SnNRTPFptsCBgozNMyx2r3vyAfc8Ep01dfnuh2ITlcMDqM4DEzHytYU7ktnrOb5IKcjTZkvPz7npPH77ePNz_Z_cOPu5tv9wyUGAqD3kk-SG4bPe4B-QCq11qAs_sRZMstIAwNtO3e7etsP0PnBpAKALVU5-T6ZFvD_loxF_M8rynWi0YOoledbLSolDxRkOacE45mSX6y6WgEN1sp5lSKqaWYt1KMriJ1EuUKxwOmf9bvqP4A_9eXSQ</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2918372541</pqid></control><display><type>article</type><title>Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation</title><source>SpringerLink Journals - AutoHoldings</source><creator>Bahou, Ziyad ; Lemnaouar, Mohamed Reda ; Krimi, Issam</creator><creatorcontrib>Bahou, Ziyad ; Lemnaouar, Mohamed Reda ; Krimi, Issam</creatorcontrib><description>Integrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a two-stage solution for the integrated PM scheduling and production planning problem within multi-parallel component manufacturing systems, accounting for diverse interdependencies. These interdependencies encompass stochastic, structural, economic, and resource-related interdependencies, all while accounting for the resultant degradation. The primary objective is jointly optimizing costs associated with holding, backorders, production, setup, and maintenance. Initially, we employ an Ordinary Differential System to compute a realistic production capacity. Additionally, we analyze the effects of interdependence-induced degradation on system availability and failures. Subsequently, we formulate the problem as an integer programming model to determine an optimal joint plan. The effectiveness of our approach is validated through numerical examples and sensitivity analysis, providing insightful guidance for efficient PM scheduling and production planning, particularly in large-scale production systems.</description><identifier>ISSN: 0268-3768</identifier><identifier>EISSN: 1433-3015</identifier><identifier>DOI: 10.1007/s00170-024-12975-4</identifier><language>eng</language><publisher>London: Springer London</publisher><subject>CAE) and Design ; Computer-Aided Engineering (CAD ; Degradation ; Engineering ; Industrial and Production Engineering ; Integer programming ; Maintenance management ; Mechanical Engineering ; Media Management ; Optimization ; Original Article ; Preventive maintenance ; Production planning ; Production scheduling ; Scheduling ; Sensitivity analysis</subject><ispartof>International journal of advanced manufacturing technology, 2024-02, Vol.130 (9-10), p.4723-4749</ispartof><rights>The Author(s), under exclusive licence to Springer-Verlag London Ltd., part of Springer Nature 2024. Springer Nature or its licensor (e.g. a society or other partner) holds exclusive rights to this article under a publishing agreement with the author(s) or other rightsholder(s); author self-archiving of the accepted manuscript version of this article is solely governed by the terms of such publishing agreement and applicable law.</rights><lds50>peer_reviewed</lds50><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c319t-c8d20920a54fbce09c38441cdabfc260acec95c66bdbbbb41cd97d9c23cce423</citedby><cites>FETCH-LOGICAL-c319t-c8d20920a54fbce09c38441cdabfc260acec95c66bdbbbb41cd97d9c23cce423</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://link.springer.com/content/pdf/10.1007/s00170-024-12975-4$$EPDF$$P50$$Gspringer$$H</linktopdf><linktohtml>$$Uhttps://link.springer.com/10.1007/s00170-024-12975-4$$EHTML$$P50$$Gspringer$$H</linktohtml><link.rule.ids>314,780,784,27924,27925,41488,42557,51319</link.rule.ids></links><search><creatorcontrib>Bahou, Ziyad</creatorcontrib><creatorcontrib>Lemnaouar, Mohamed Reda</creatorcontrib><creatorcontrib>Krimi, Issam</creatorcontrib><title>Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation</title><title>International journal of advanced manufacturing technology</title><addtitle>Int J Adv Manuf Technol</addtitle><description>Integrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a two-stage solution for the integrated PM scheduling and production planning problem within multi-parallel component manufacturing systems, accounting for diverse interdependencies. These interdependencies encompass stochastic, structural, economic, and resource-related interdependencies, all while accounting for the resultant degradation. The primary objective is jointly optimizing costs associated with holding, backorders, production, setup, and maintenance. Initially, we employ an Ordinary Differential System to compute a realistic production capacity. Additionally, we analyze the effects of interdependence-induced degradation on system availability and failures. Subsequently, we formulate the problem as an integer programming model to determine an optimal joint plan. The effectiveness of our approach is validated through numerical examples and sensitivity analysis, providing insightful guidance for efficient PM scheduling and production planning, particularly in large-scale production systems.</description><subject>CAE) and Design</subject><subject>Computer-Aided Engineering (CAD</subject><subject>Degradation</subject><subject>Engineering</subject><subject>Industrial and Production Engineering</subject><subject>Integer programming</subject><subject>Maintenance management</subject><subject>Mechanical Engineering</subject><subject>Media Management</subject><subject>Optimization</subject><subject>Original Article</subject><subject>Preventive maintenance</subject><subject>Production planning</subject><subject>Production scheduling</subject><subject>Scheduling</subject><subject>Sensitivity analysis</subject><issn>0268-3768</issn><issn>1433-3015</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2024</creationdate><recordtype>article</recordtype><recordid>eNp9kc1qHDEQhEWIIRvbL-CTwGcl-pu_YzBOYjD44rvQtnrWMhrNRNLY7DvlIaPxBpKT-yJofVVdUIRcCf5FcN59zZyLjjMuNRNy6BqmP5Cd0EoxxUXzkey4bHumurb_RD7n_FzxVrT9jvy-iwUPyRZ0NM6RwRGCBxvokvAFY_EvSCfrKxRtBKQZntCtwccDtdFVanYrFD9HugQb47Yf50SnNRTPFptsCBgozNMyx2r3vyAfc8Ep01dfnuh2ITlcMDqM4DEzHytYU7ktnrOb5IKcjTZkvPz7npPH77ePNz_Z_cOPu5tv9wyUGAqD3kk-SG4bPe4B-QCq11qAs_sRZMstIAwNtO3e7etsP0PnBpAKALVU5-T6ZFvD_loxF_M8rynWi0YOoledbLSolDxRkOacE45mSX6y6WgEN1sp5lSKqaWYt1KMriJ1EuUKxwOmf9bvqP4A_9eXSQ</recordid><startdate>20240201</startdate><enddate>20240201</enddate><creator>Bahou, Ziyad</creator><creator>Lemnaouar, Mohamed Reda</creator><creator>Krimi, Issam</creator><general>Springer London</general><general>Springer Nature B.V</general><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>20240201</creationdate><title>Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation</title><author>Bahou, Ziyad ; Lemnaouar, Mohamed Reda ; Krimi, Issam</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c319t-c8d20920a54fbce09c38441cdabfc260acec95c66bdbbbb41cd97d9c23cce423</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2024</creationdate><topic>CAE) and Design</topic><topic>Computer-Aided Engineering (CAD</topic><topic>Degradation</topic><topic>Engineering</topic><topic>Industrial and Production Engineering</topic><topic>Integer programming</topic><topic>Maintenance management</topic><topic>Mechanical Engineering</topic><topic>Media Management</topic><topic>Optimization</topic><topic>Original Article</topic><topic>Preventive maintenance</topic><topic>Production planning</topic><topic>Production scheduling</topic><topic>Scheduling</topic><topic>Sensitivity analysis</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Bahou, Ziyad</creatorcontrib><creatorcontrib>Lemnaouar, Mohamed Reda</creatorcontrib><creatorcontrib>Krimi, Issam</creatorcontrib><collection>CrossRef</collection><jtitle>International journal of advanced manufacturing technology</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Bahou, Ziyad</au><au>Lemnaouar, Mohamed Reda</au><au>Krimi, Issam</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation</atitle><jtitle>International journal of advanced manufacturing technology</jtitle><stitle>Int J Adv Manuf Technol</stitle><date>2024-02-01</date><risdate>2024</risdate><volume>130</volume><issue>9-10</issue><spage>4723</spage><epage>4749</epage><pages>4723-4749</pages><issn>0268-3768</issn><eissn>1433-3015</eissn><abstract>Integrating preventive maintenance (PM) scheduling and production planning efficiently remains challenging for researchers and practitioners alike, owing to complex component interdependencies. Existing studies often lack practicality due to oversimplified assumptions. In this paper, we propose a two-stage solution for the integrated PM scheduling and production planning problem within multi-parallel component manufacturing systems, accounting for diverse interdependencies. These interdependencies encompass stochastic, structural, economic, and resource-related interdependencies, all while accounting for the resultant degradation. The primary objective is jointly optimizing costs associated with holding, backorders, production, setup, and maintenance. Initially, we employ an Ordinary Differential System to compute a realistic production capacity. Additionally, we analyze the effects of interdependence-induced degradation on system availability and failures. Subsequently, we formulate the problem as an integer programming model to determine an optimal joint plan. The effectiveness of our approach is validated through numerical examples and sensitivity analysis, providing insightful guidance for efficient PM scheduling and production planning, particularly in large-scale production systems.</abstract><cop>London</cop><pub>Springer London</pub><doi>10.1007/s00170-024-12975-4</doi><tpages>27</tpages></addata></record> |
fulltext | fulltext |
identifier | ISSN: 0268-3768 |
ispartof | International journal of advanced manufacturing technology, 2024-02, Vol.130 (9-10), p.4723-4749 |
issn | 0268-3768 1433-3015 |
language | eng |
recordid | cdi_proquest_journals_2918372541 |
source | SpringerLink Journals - AutoHoldings |
subjects | CAE) and Design Computer-Aided Engineering (CAD Degradation Engineering Industrial and Production Engineering Integer programming Maintenance management Mechanical Engineering Media Management Optimization Original Article Preventive maintenance Production planning Production scheduling Scheduling Sensitivity analysis |
title | Integrated non-cyclical preventive maintenance scheduling and production planning for multi-parallel component production systems with interdependencies-induced degradation |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-27T03%3A20%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Integrated%20non-cyclical%20preventive%20maintenance%20scheduling%20and%20production%20planning%20for%20multi-parallel%20component%20production%20systems%20with%20interdependencies-induced%20degradation&rft.jtitle=International%20journal%20of%20advanced%20manufacturing%20technology&rft.au=Bahou,%20Ziyad&rft.date=2024-02-01&rft.volume=130&rft.issue=9-10&rft.spage=4723&rft.epage=4749&rft.pages=4723-4749&rft.issn=0268-3768&rft.eissn=1433-3015&rft_id=info:doi/10.1007/s00170-024-12975-4&rft_dat=%3Cproquest_cross%3E2918372541%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2918372541&rft_id=info:pmid/&rfr_iscdi=true |