An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project
A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; th...
Gespeichert in:
Veröffentlicht in: | Sustainability 2023-06, Vol.15 (12), p.9304 |
---|---|
Hauptverfasser: | , , , , , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | 12 |
container_start_page | 9304 |
container_title | Sustainability |
container_volume | 15 |
creator | Yang, Fangsheng Cao, Taibo Zhang, Tingrong Hu, Junfeng Wang, Xinrui Ding, Zhikun Wu, Zezhou |
description | A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; this technique has been frequently used in tunnel excavation projects. However, the spoil produced during the shield construction is challenging to deal with. In literature, though there has been an increasing number of studies on the technologies of utilizing shield spoil, the on-site utilization of shield spoil is still a subject of little research. This study introduced an implementation framework for the on-site utilization of shield spoil based on successful case experiences. It aims to assist project managers in efficiently implementing on-site resource utilization projects and to address the gaps in the relevant field. A case study was conducted in the Shenzhen Metro Line 13 North Extension Project; this study collected data through six semi-structured interviews and field research, analyzed the data, and constructed a framework using thematic analysis and focus group discussions. The three components of the implementation framework are project planning, project construction, and project closing, and each section describes what must be accomplished during that phase. Additionally, three recommendations—(1) combining intelligent technology to optimize the existing equipment, (2) utilizing lean technology in project execution, (3) establishing strategic partnerships with construction waste recycling enterprises—are also made for the development of the shield spoil utilization project. This study uses the Shenzhen Metro Line 13 North Extension Project as a model to theoretically underpin future research on shielding spoil on-site during resource utilization projects and to achieve the repeatable promotion of shield spoil utilization technology in Shenzhen. |
doi_str_mv | 10.3390/su15129304 |
format | Article |
fullrecord | <record><control><sourceid>gale_proqu</sourceid><recordid>TN_cdi_proquest_journals_2829884030</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><galeid>A758354350</galeid><sourcerecordid>A758354350</sourcerecordid><originalsourceid>FETCH-LOGICAL-c368t-e76baab9c6dfe50c64fbb0e28ee3d6f03c7422407e220a300ed55a7ea0e09af03</originalsourceid><addsrcrecordid>eNpVkc1OwzAMxysEEtPYhSeIxAmkDjfp57Ga-Jg0NETZuUpbZ2S0zUhSwTjxEDwhT0LHkGD2wZb9-9uHv-OcejBmLIFL03mBRxMG_oEzoBB5rgcBHP7rj52RMSvogzEv8cKBU6QtmTbrGhtsLbdSteRa8wZflX4mQmkyb91MWiTZk8S6ItlayZosrKzl-w_-9fGZkgk3PWG7akOUIJzcodWK3Gu1wtKeOEeC1wZHv3XoLK6vHie37mx-M52kM7dkYWxdjMKC8yIpw0pgAGXoi6IApDEiq0IBrIx8Sn2IkFLgDACrIOARckBIeL8fOme7u2utXjo0Nl-pTrf9y5zGNIljH9iWGu-oJa8xl61QVvOyzwobWaoWheznaRTELPBZsBWc7wl6xuKbXfLOmHyaPeyzFzu21MoYjSJfa9lwvck9yLce5X8esW-9vIM5</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2829884030</pqid></control><display><type>article</type><title>An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project</title><source>MDPI - Multidisciplinary Digital Publishing Institute</source><source>Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals</source><creator>Yang, Fangsheng ; Cao, Taibo ; Zhang, Tingrong ; Hu, Junfeng ; Wang, Xinrui ; Ding, Zhikun ; Wu, Zezhou</creator><creatorcontrib>Yang, Fangsheng ; Cao, Taibo ; Zhang, Tingrong ; Hu, Junfeng ; Wang, Xinrui ; Ding, Zhikun ; Wu, Zezhou</creatorcontrib><description>A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; this technique has been frequently used in tunnel excavation projects. However, the spoil produced during the shield construction is challenging to deal with. In literature, though there has been an increasing number of studies on the technologies of utilizing shield spoil, the on-site utilization of shield spoil is still a subject of little research. This study introduced an implementation framework for the on-site utilization of shield spoil based on successful case experiences. It aims to assist project managers in efficiently implementing on-site resource utilization projects and to address the gaps in the relevant field. A case study was conducted in the Shenzhen Metro Line 13 North Extension Project; this study collected data through six semi-structured interviews and field research, analyzed the data, and constructed a framework using thematic analysis and focus group discussions. The three components of the implementation framework are project planning, project construction, and project closing, and each section describes what must be accomplished during that phase. Additionally, three recommendations—(1) combining intelligent technology to optimize the existing equipment, (2) utilizing lean technology in project execution, (3) establishing strategic partnerships with construction waste recycling enterprises—are also made for the development of the shield spoil utilization project. This study uses the Shenzhen Metro Line 13 North Extension Project as a model to theoretically underpin future research on shielding spoil on-site during resource utilization projects and to achieve the repeatable promotion of shield spoil utilization technology in Shenzhen.</description><identifier>ISSN: 2071-1050</identifier><identifier>EISSN: 2071-1050</identifier><identifier>DOI: 10.3390/su15129304</identifier><language>eng</language><publisher>Basel: MDPI AG</publisher><subject>Analysis ; Case studies ; China ; Construction ; Construction industry wastes ; Construction materials ; Engineering ; Excavation ; Landfill ; Light rail transit ; Onsite ; Population growth ; Project engineering ; Project planning ; Public transportation ; Recycling (Waste, etc.) ; Research methodology ; Resource utilization ; Slag ; Sustainability ; Technology ; Traffic congestion ; Urban areas ; Waste disposal</subject><ispartof>Sustainability, 2023-06, Vol.15 (12), p.9304</ispartof><rights>COPYRIGHT 2023 MDPI AG</rights><rights>2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c368t-e76baab9c6dfe50c64fbb0e28ee3d6f03c7422407e220a300ed55a7ea0e09af03</citedby><cites>FETCH-LOGICAL-c368t-e76baab9c6dfe50c64fbb0e28ee3d6f03c7422407e220a300ed55a7ea0e09af03</cites><orcidid>0000-0002-8687-0466</orcidid></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><link.rule.ids>314,776,780,27903,27904</link.rule.ids></links><search><creatorcontrib>Yang, Fangsheng</creatorcontrib><creatorcontrib>Cao, Taibo</creatorcontrib><creatorcontrib>Zhang, Tingrong</creatorcontrib><creatorcontrib>Hu, Junfeng</creatorcontrib><creatorcontrib>Wang, Xinrui</creatorcontrib><creatorcontrib>Ding, Zhikun</creatorcontrib><creatorcontrib>Wu, Zezhou</creatorcontrib><title>An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project</title><title>Sustainability</title><description>A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; this technique has been frequently used in tunnel excavation projects. However, the spoil produced during the shield construction is challenging to deal with. In literature, though there has been an increasing number of studies on the technologies of utilizing shield spoil, the on-site utilization of shield spoil is still a subject of little research. This study introduced an implementation framework for the on-site utilization of shield spoil based on successful case experiences. It aims to assist project managers in efficiently implementing on-site resource utilization projects and to address the gaps in the relevant field. A case study was conducted in the Shenzhen Metro Line 13 North Extension Project; this study collected data through six semi-structured interviews and field research, analyzed the data, and constructed a framework using thematic analysis and focus group discussions. The three components of the implementation framework are project planning, project construction, and project closing, and each section describes what must be accomplished during that phase. Additionally, three recommendations—(1) combining intelligent technology to optimize the existing equipment, (2) utilizing lean technology in project execution, (3) establishing strategic partnerships with construction waste recycling enterprises—are also made for the development of the shield spoil utilization project. This study uses the Shenzhen Metro Line 13 North Extension Project as a model to theoretically underpin future research on shielding spoil on-site during resource utilization projects and to achieve the repeatable promotion of shield spoil utilization technology in Shenzhen.</description><subject>Analysis</subject><subject>Case studies</subject><subject>China</subject><subject>Construction</subject><subject>Construction industry wastes</subject><subject>Construction materials</subject><subject>Engineering</subject><subject>Excavation</subject><subject>Landfill</subject><subject>Light rail transit</subject><subject>Onsite</subject><subject>Population growth</subject><subject>Project engineering</subject><subject>Project planning</subject><subject>Public transportation</subject><subject>Recycling (Waste, etc.)</subject><subject>Research methodology</subject><subject>Resource utilization</subject><subject>Slag</subject><subject>Sustainability</subject><subject>Technology</subject><subject>Traffic congestion</subject><subject>Urban areas</subject><subject>Waste disposal</subject><issn>2071-1050</issn><issn>2071-1050</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2023</creationdate><recordtype>article</recordtype><sourceid>BENPR</sourceid><recordid>eNpVkc1OwzAMxysEEtPYhSeIxAmkDjfp57Ga-Jg0NETZuUpbZ2S0zUhSwTjxEDwhT0LHkGD2wZb9-9uHv-OcejBmLIFL03mBRxMG_oEzoBB5rgcBHP7rj52RMSvogzEv8cKBU6QtmTbrGhtsLbdSteRa8wZflX4mQmkyb91MWiTZk8S6ItlayZosrKzl-w_-9fGZkgk3PWG7akOUIJzcodWK3Gu1wtKeOEeC1wZHv3XoLK6vHie37mx-M52kM7dkYWxdjMKC8yIpw0pgAGXoi6IApDEiq0IBrIx8Sn2IkFLgDACrIOARckBIeL8fOme7u2utXjo0Nl-pTrf9y5zGNIljH9iWGu-oJa8xl61QVvOyzwobWaoWheznaRTELPBZsBWc7wl6xuKbXfLOmHyaPeyzFzu21MoYjSJfa9lwvck9yLce5X8esW-9vIM5</recordid><startdate>20230601</startdate><enddate>20230601</enddate><creator>Yang, Fangsheng</creator><creator>Cao, Taibo</creator><creator>Zhang, Tingrong</creator><creator>Hu, Junfeng</creator><creator>Wang, Xinrui</creator><creator>Ding, Zhikun</creator><creator>Wu, Zezhou</creator><general>MDPI AG</general><scope>AAYXX</scope><scope>CITATION</scope><scope>ISR</scope><scope>4U-</scope><scope>ABUWG</scope><scope>AFKRA</scope><scope>AZQEC</scope><scope>BENPR</scope><scope>CCPQU</scope><scope>COVID</scope><scope>DWQXO</scope><scope>PIMPY</scope><scope>PQEST</scope><scope>PQQKQ</scope><scope>PQUKI</scope><scope>PRINS</scope><orcidid>https://orcid.org/0000-0002-8687-0466</orcidid></search><sort><creationdate>20230601</creationdate><title>An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project</title><author>Yang, Fangsheng ; Cao, Taibo ; Zhang, Tingrong ; Hu, Junfeng ; Wang, Xinrui ; Ding, Zhikun ; Wu, Zezhou</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c368t-e76baab9c6dfe50c64fbb0e28ee3d6f03c7422407e220a300ed55a7ea0e09af03</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2023</creationdate><topic>Analysis</topic><topic>Case studies</topic><topic>China</topic><topic>Construction</topic><topic>Construction industry wastes</topic><topic>Construction materials</topic><topic>Engineering</topic><topic>Excavation</topic><topic>Landfill</topic><topic>Light rail transit</topic><topic>Onsite</topic><topic>Population growth</topic><topic>Project engineering</topic><topic>Project planning</topic><topic>Public transportation</topic><topic>Recycling (Waste, etc.)</topic><topic>Research methodology</topic><topic>Resource utilization</topic><topic>Slag</topic><topic>Sustainability</topic><topic>Technology</topic><topic>Traffic congestion</topic><topic>Urban areas</topic><topic>Waste disposal</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Yang, Fangsheng</creatorcontrib><creatorcontrib>Cao, Taibo</creatorcontrib><creatorcontrib>Zhang, Tingrong</creatorcontrib><creatorcontrib>Hu, Junfeng</creatorcontrib><creatorcontrib>Wang, Xinrui</creatorcontrib><creatorcontrib>Ding, Zhikun</creatorcontrib><creatorcontrib>Wu, Zezhou</creatorcontrib><collection>CrossRef</collection><collection>Gale In Context: Science</collection><collection>University Readers</collection><collection>ProQuest Central (Alumni Edition)</collection><collection>ProQuest Central UK/Ireland</collection><collection>ProQuest Central Essentials</collection><collection>ProQuest Central</collection><collection>ProQuest One Community College</collection><collection>Coronavirus Research Database</collection><collection>ProQuest Central Korea</collection><collection>Publicly Available Content Database</collection><collection>ProQuest One Academic Eastern Edition (DO NOT USE)</collection><collection>ProQuest One Academic</collection><collection>ProQuest One Academic UKI Edition</collection><collection>ProQuest Central China</collection><jtitle>Sustainability</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Yang, Fangsheng</au><au>Cao, Taibo</au><au>Zhang, Tingrong</au><au>Hu, Junfeng</au><au>Wang, Xinrui</au><au>Ding, Zhikun</au><au>Wu, Zezhou</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project</atitle><jtitle>Sustainability</jtitle><date>2023-06-01</date><risdate>2023</risdate><volume>15</volume><issue>12</issue><spage>9304</spage><pages>9304-</pages><issn>2071-1050</issn><eissn>2071-1050</eissn><abstract>A majority of metro projects have been constructed to reduce urban traffic congestion and to improve the convenience of public transportation, but these projects also produced a significant amount of engineering slag and mud. The shield construction method could improve the efficiency and safety; this technique has been frequently used in tunnel excavation projects. However, the spoil produced during the shield construction is challenging to deal with. In literature, though there has been an increasing number of studies on the technologies of utilizing shield spoil, the on-site utilization of shield spoil is still a subject of little research. This study introduced an implementation framework for the on-site utilization of shield spoil based on successful case experiences. It aims to assist project managers in efficiently implementing on-site resource utilization projects and to address the gaps in the relevant field. A case study was conducted in the Shenzhen Metro Line 13 North Extension Project; this study collected data through six semi-structured interviews and field research, analyzed the data, and constructed a framework using thematic analysis and focus group discussions. The three components of the implementation framework are project planning, project construction, and project closing, and each section describes what must be accomplished during that phase. Additionally, three recommendations—(1) combining intelligent technology to optimize the existing equipment, (2) utilizing lean technology in project execution, (3) establishing strategic partnerships with construction waste recycling enterprises—are also made for the development of the shield spoil utilization project. This study uses the Shenzhen Metro Line 13 North Extension Project as a model to theoretically underpin future research on shielding spoil on-site during resource utilization projects and to achieve the repeatable promotion of shield spoil utilization technology in Shenzhen.</abstract><cop>Basel</cop><pub>MDPI AG</pub><doi>10.3390/su15129304</doi><orcidid>https://orcid.org/0000-0002-8687-0466</orcidid><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 2071-1050 |
ispartof | Sustainability, 2023-06, Vol.15 (12), p.9304 |
issn | 2071-1050 2071-1050 |
language | eng |
recordid | cdi_proquest_journals_2829884030 |
source | MDPI - Multidisciplinary Digital Publishing Institute; Elektronische Zeitschriftenbibliothek - Frei zugängliche E-Journals |
subjects | Analysis Case studies China Construction Construction industry wastes Construction materials Engineering Excavation Landfill Light rail transit Onsite Population growth Project engineering Project planning Public transportation Recycling (Waste, etc.) Research methodology Resource utilization Slag Sustainability Technology Traffic congestion Urban areas Waste disposal |
title | An Implementation Framework for On-Site Shield Spoil Utilization—A Case Study of a Metro Project |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T18%3A23%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-gale_proqu&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=An%20Implementation%20Framework%20for%20On-Site%20Shield%20Spoil%20Utilization%E2%80%94A%20Case%20Study%20of%20a%20Metro%20Project&rft.jtitle=Sustainability&rft.au=Yang,%20Fangsheng&rft.date=2023-06-01&rft.volume=15&rft.issue=12&rft.spage=9304&rft.pages=9304-&rft.issn=2071-1050&rft.eissn=2071-1050&rft_id=info:doi/10.3390/su15129304&rft_dat=%3Cgale_proqu%3EA758354350%3C/gale_proqu%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2829884030&rft_id=info:pmid/&rft_galeid=A758354350&rfr_iscdi=true |