Challenges and Sustainability-Based Solutions of Diaphragm Wall Construction for LG06 Underground Station in Taipei MRT

Diaphragm wall was adopted for the subsurface excavation for LG06 underground station, one of the Wanda line stations in Taipei MRT, and it encountered many geological challenges during construction. The geological conditions in this zone are mostly clay and hard rock layer. The unconfined compressi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:Transportation infrastructure geotechnology 2023-02, Vol.10 (1), p.17-40
Hauptverfasser: Liu, Tai-Yi, Chou, Nelson N. S., Lin, Shiun-Jye, Tzou, Hong-Kee, Chen, Po-Han
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!