Genuine and sustained POM mastery from linear POM to POM system symphonies
A dramatically changing business landscape characterized by volatility and uncertainty (which in turn are driven by unpredictable alterations of conditions by such factors as geopolitical events, climate changes, disasters—natural and human causes, reduction in food, potable water, and critical mate...
Gespeichert in:
Veröffentlicht in: | Production and operations management 2022-12, Vol.31 (12), p.4628-4642 |
---|---|
Hauptverfasser: | , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | 4642 |
---|---|
container_issue | 12 |
container_start_page | 4628 |
container_title | Production and operations management |
container_volume | 31 |
creator | Robertson, Peter W. Starr, Martin K. |
description | A dramatically changing business landscape characterized by volatility and uncertainty (which in turn are driven by unpredictable alterations of conditions by such factors as geopolitical events, climate changes, disasters—natural and human causes, reduction in food, potable water, and critical materials supply along with environmental contamination), has created a situation whereby a rethink of Production and Operations Management (POM) strategies and practices is considered timely and appropriate. Against a backdrop of current POM strengths and weaknesses, and expected POM futures, a response path for POM adoption to deal with such uncertainties and risks is proposed and described in some detail. This involves the treatment of POM as a more interconnected and integrated system than has hitherto been the case. Such an interconnected approach is described as a POM symphony where all key players would be playing from the same script and the POM leader must serve as a coach‐coordinator, that is, the symphony's conductor. |
doi_str_mv | 10.1111/poms.13870 |
format | Article |
fullrecord | <record><control><sourceid>proquest_cross</sourceid><recordid>TN_cdi_proquest_journals_2758068610</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sage_id>10.1111_poms.13870</sage_id><sourcerecordid>2758068610</sourcerecordid><originalsourceid>FETCH-LOGICAL-c4260-594042a723714a16dd26e202024b823714b2fa67d0ac56a374e85c778fde2a2f3</originalsourceid><addsrcrecordid>eNp9kF1LwzAUhoMoOKc3_oKAF4LQeZLmq5cydCqTCep1yNpUO9YPkxbpvzdrld2IycWbvHlycvIidE5gRsK4burSz0isJBygCUliGfGEi8OwBp5EhEl1jE683wCAjClM0OPCVl1RWWyqDPvOtyZsMvy8esKl8a11Pc5dXeJtsI0b_LYexPfhuAxSNh91VVh_io5ys_X27Een6O3u9nV-Hy1Xi4f5zTJKGRUQGmLAqJE0loQZIrKMCkshTLZWg7mmuREyA5NyYWLJrOKplCrPLDU0j6foYqzbuPqzs77Vm7pzVXhSU8kVCCUIBOpqpFJXe-9srhtXlMb1moDeZaV3WekhqwDjEbZp-Irfo4pxqqRgSUDIiHwVW9v_U0yHcF5-y16Od7x5t_su_2jgG0T7gX0</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2758068610</pqid></control><display><type>article</type><title>Genuine and sustained POM mastery from linear POM to POM system symphonies</title><source>Wiley Online Library Journals Frontfile Complete</source><source>Business Source Complete</source><source>SAGE Complete A-Z List</source><creator>Robertson, Peter W. ; Starr, Martin K.</creator><creatorcontrib>Robertson, Peter W. ; Starr, Martin K.</creatorcontrib><description>A dramatically changing business landscape characterized by volatility and uncertainty (which in turn are driven by unpredictable alterations of conditions by such factors as geopolitical events, climate changes, disasters—natural and human causes, reduction in food, potable water, and critical materials supply along with environmental contamination), has created a situation whereby a rethink of Production and Operations Management (POM) strategies and practices is considered timely and appropriate. Against a backdrop of current POM strengths and weaknesses, and expected POM futures, a response path for POM adoption to deal with such uncertainties and risks is proposed and described in some detail. This involves the treatment of POM as a more interconnected and integrated system than has hitherto been the case. Such an interconnected approach is described as a POM symphony where all key players would be playing from the same script and the POM leader must serve as a coach‐coordinator, that is, the symphony's conductor.</description><identifier>ISSN: 1059-1478</identifier><identifier>EISSN: 1937-5956</identifier><identifier>DOI: 10.1111/poms.13870</identifier><language>eng</language><publisher>Los Angeles, CA: SAGE Publications</publisher><subject>Operations management ; POM call‐to‐action ; POM futures ; POM mastery ; POM response path ; POM trends</subject><ispartof>Production and operations management, 2022-12, Vol.31 (12), p.4628-4642</ispartof><rights>2022 The Authors</rights><rights>2022 The Authors. published by Wiley Periodicals LLC on behalf of Production and Operations Management Society.</rights><rights>2022. This article is published under http://creativecommons.org/licenses/by-nc-nd/4.0/ (the “License”). Notwithstanding the ProQuest Terms and Conditions, you may use this content in accordance with the terms of the License.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed><citedby>FETCH-LOGICAL-c4260-594042a723714a16dd26e202024b823714b2fa67d0ac56a374e85c778fde2a2f3</citedby><cites>FETCH-LOGICAL-c4260-594042a723714a16dd26e202024b823714b2fa67d0ac56a374e85c778fde2a2f3</cites></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktopdf>$$Uhttps://journals.sagepub.com/doi/pdf/10.1111/poms.13870$$EPDF$$P50$$Gsage$$Hfree_for_read</linktopdf><linktohtml>$$Uhttps://journals.sagepub.com/doi/10.1111/poms.13870$$EHTML$$P50$$Gsage$$Hfree_for_read</linktohtml><link.rule.ids>314,778,782,1414,21802,27907,27908,43604,43605,45557,45558</link.rule.ids></links><search><creatorcontrib>Robertson, Peter W.</creatorcontrib><creatorcontrib>Starr, Martin K.</creatorcontrib><title>Genuine and sustained POM mastery from linear POM to POM system symphonies</title><title>Production and operations management</title><description>A dramatically changing business landscape characterized by volatility and uncertainty (which in turn are driven by unpredictable alterations of conditions by such factors as geopolitical events, climate changes, disasters—natural and human causes, reduction in food, potable water, and critical materials supply along with environmental contamination), has created a situation whereby a rethink of Production and Operations Management (POM) strategies and practices is considered timely and appropriate. Against a backdrop of current POM strengths and weaknesses, and expected POM futures, a response path for POM adoption to deal with such uncertainties and risks is proposed and described in some detail. This involves the treatment of POM as a more interconnected and integrated system than has hitherto been the case. Such an interconnected approach is described as a POM symphony where all key players would be playing from the same script and the POM leader must serve as a coach‐coordinator, that is, the symphony's conductor.</description><subject>Operations management</subject><subject>POM call‐to‐action</subject><subject>POM futures</subject><subject>POM mastery</subject><subject>POM response path</subject><subject>POM trends</subject><issn>1059-1478</issn><issn>1937-5956</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><sourceid>AFRWT</sourceid><sourceid>24P</sourceid><sourceid>WIN</sourceid><recordid>eNp9kF1LwzAUhoMoOKc3_oKAF4LQeZLmq5cydCqTCep1yNpUO9YPkxbpvzdrld2IycWbvHlycvIidE5gRsK4burSz0isJBygCUliGfGEi8OwBp5EhEl1jE683wCAjClM0OPCVl1RWWyqDPvOtyZsMvy8esKl8a11Pc5dXeJtsI0b_LYexPfhuAxSNh91VVh_io5ys_X27Een6O3u9nV-Hy1Xi4f5zTJKGRUQGmLAqJE0loQZIrKMCkshTLZWg7mmuREyA5NyYWLJrOKplCrPLDU0j6foYqzbuPqzs77Vm7pzVXhSU8kVCCUIBOpqpFJXe-9srhtXlMb1moDeZaV3WekhqwDjEbZp-Irfo4pxqqRgSUDIiHwVW9v_U0yHcF5-y16Od7x5t_su_2jgG0T7gX0</recordid><startdate>202212</startdate><enddate>202212</enddate><creator>Robertson, Peter W.</creator><creator>Starr, Martin K.</creator><general>SAGE Publications</general><general>Blackwell Publishers Inc</general><scope>AFRWT</scope><scope>24P</scope><scope>WIN</scope><scope>OQ6</scope><scope>AAYXX</scope><scope>CITATION</scope></search><sort><creationdate>202212</creationdate><title>Genuine and sustained POM mastery from linear POM to POM system symphonies</title><author>Robertson, Peter W. ; Starr, Martin K.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-c4260-594042a723714a16dd26e202024b823714b2fa67d0ac56a374e85c778fde2a2f3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>Operations management</topic><topic>POM call‐to‐action</topic><topic>POM futures</topic><topic>POM mastery</topic><topic>POM response path</topic><topic>POM trends</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Robertson, Peter W.</creatorcontrib><creatorcontrib>Starr, Martin K.</creatorcontrib><collection>Sage Journals GOLD Open Access 2024</collection><collection>Wiley Online Library Open Access</collection><collection>Wiley Free Content</collection><collection>ECONIS</collection><collection>CrossRef</collection><jtitle>Production and operations management</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Robertson, Peter W.</au><au>Starr, Martin K.</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Genuine and sustained POM mastery from linear POM to POM system symphonies</atitle><jtitle>Production and operations management</jtitle><date>2022-12</date><risdate>2022</risdate><volume>31</volume><issue>12</issue><spage>4628</spage><epage>4642</epage><pages>4628-4642</pages><issn>1059-1478</issn><eissn>1937-5956</eissn><abstract>A dramatically changing business landscape characterized by volatility and uncertainty (which in turn are driven by unpredictable alterations of conditions by such factors as geopolitical events, climate changes, disasters—natural and human causes, reduction in food, potable water, and critical materials supply along with environmental contamination), has created a situation whereby a rethink of Production and Operations Management (POM) strategies and practices is considered timely and appropriate. Against a backdrop of current POM strengths and weaknesses, and expected POM futures, a response path for POM adoption to deal with such uncertainties and risks is proposed and described in some detail. This involves the treatment of POM as a more interconnected and integrated system than has hitherto been the case. Such an interconnected approach is described as a POM symphony where all key players would be playing from the same script and the POM leader must serve as a coach‐coordinator, that is, the symphony's conductor.</abstract><cop>Los Angeles, CA</cop><pub>SAGE Publications</pub><doi>10.1111/poms.13870</doi><tpages>15</tpages><oa>free_for_read</oa></addata></record> |
fulltext | fulltext |
identifier | ISSN: 1059-1478 |
ispartof | Production and operations management, 2022-12, Vol.31 (12), p.4628-4642 |
issn | 1059-1478 1937-5956 |
language | eng |
recordid | cdi_proquest_journals_2758068610 |
source | Wiley Online Library Journals Frontfile Complete; Business Source Complete; SAGE Complete A-Z List |
subjects | Operations management POM call‐to‐action POM futures POM mastery POM response path POM trends |
title | Genuine and sustained POM mastery from linear POM to POM system symphonies |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T19%3A52%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_cross&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Genuine%20and%20sustained%20POM%20mastery%20from%20linear%20POM%20to%20POM%20system%20symphonies&rft.jtitle=Production%20and%20operations%20management&rft.au=Robertson,%20Peter%20W.&rft.date=2022-12&rft.volume=31&rft.issue=12&rft.spage=4628&rft.epage=4642&rft.pages=4628-4642&rft.issn=1059-1478&rft.eissn=1937-5956&rft_id=info:doi/10.1111/poms.13870&rft_dat=%3Cproquest_cross%3E2758068610%3C/proquest_cross%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2758068610&rft_id=info:pmid/&rft_sage_id=10.1111_poms.13870&rfr_iscdi=true |