Goal programming problem solving with weighted method and its application to production planning in PT. Pardic Jaya chemicals

The purpose of this study is to solve the problem of production planning to minimize overstock with forecasting methods where the results are used to form a Goal Programming model and solved by the Weighted method. Overstock problems can be solved by using the demand forecasting method by comparing...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:AIP conference proceedings 2022-12, Vol.2575 (1)
Hauptverfasser: Anggera, S. A., Lestari, H. P.
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue 1
container_start_page
container_title AIP conference proceedings
container_volume 2575
creator Anggera, S. A.
Lestari, H. P.
description The purpose of this study is to solve the problem of production planning to minimize overstock with forecasting methods where the results are used to form a Goal Programming model and solved by the Weighted method. Overstock problems can be solved by using the demand forecasting method by comparing the MAD, MSE, and MFE values of four forecasting methods including the Double Moving Average, Single Exponential Smoothing, Double Exponential Smoothing, and Linear Trend method. Forecasting results we obtained are then used to form the Goal Programming model. Another goal to be achieved is to reduce inventory costs and also get profit from sales so that the Weighted method is used here because each target has a different importance weight. The amount of the estimated cost of inventory due to forecast in 2020 will decrease from Rp. 8,130,505,919 to around Rp. 4,589,859,000. Sales profit is obtained with an income of Rp. 379,942,200.
doi_str_mv 10.1063/5.0125475
format Article
fullrecord <record><control><sourceid>proquest_scita</sourceid><recordid>TN_cdi_proquest_journals_2748004117</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>2748004117</sourcerecordid><originalsourceid>FETCH-LOGICAL-p985-8888e342700ae3ff43989d8552d129f652e2390701a6641935e64470b74cf5cc3</originalsourceid><addsrcrecordid>eNotUMtOwzAQtBBIlMKBP7DEDSll_Y6PqIICqkQPPXCLXMdpXCVOSFxQD_w7Sdu9zI40s49B6J7AjIBkT2IGhAquxAWaECFIoiSRl2gCoHlCOfu6Rjd9vwOgWql0gv4Wjalw2zXbztS1D9ux31Suxn1T_Yz818cS_zq_LaPLce1i2eTYhBz72GPTtpW3Jvom4NiM3nxvj6ytTAij3we8Ws_wynS5t_jDHAy2pasHV9XfoqtiAHd3xilav76s52_J8nPxPn9eJq1ORZIO5RinCsA4VhSc6VTnqRA0J1QXUlBHmQYFxEjJiWbCSc4VbBS3hbCWTdHDaexw3_fe9THbNfsuDBszqngKwAlRg-rxpOqtj8eXsrbztekOGYFsTDcT2Tld9g9B2Gwg</addsrcrecordid><sourcetype>Aggregation Database</sourcetype><iscdi>true</iscdi><recordtype>article</recordtype><pqid>2748004117</pqid></control><display><type>article</type><title>Goal programming problem solving with weighted method and its application to production planning in PT. Pardic Jaya chemicals</title><source>AIP Journals Complete</source><creator>Anggera, S. A. ; Lestari, H. P.</creator><contributor>Andayani, Sri ; Sahid ; Wutsqa, Dhoriva Urwatul ; Hartono ; Retnowati, Endah ; Kismiantini ; Retnawati, Heri ; Somerkoski, Brita ; Abadi, Agus Maman ; Sugiman ; Setyaningrum, Wahyu</contributor><creatorcontrib>Anggera, S. A. ; Lestari, H. P. ; Andayani, Sri ; Sahid ; Wutsqa, Dhoriva Urwatul ; Hartono ; Retnowati, Endah ; Kismiantini ; Retnawati, Heri ; Somerkoski, Brita ; Abadi, Agus Maman ; Sugiman ; Setyaningrum, Wahyu</creatorcontrib><description>The purpose of this study is to solve the problem of production planning to minimize overstock with forecasting methods where the results are used to form a Goal Programming model and solved by the Weighted method. Overstock problems can be solved by using the demand forecasting method by comparing the MAD, MSE, and MFE values of four forecasting methods including the Double Moving Average, Single Exponential Smoothing, Double Exponential Smoothing, and Linear Trend method. Forecasting results we obtained are then used to form the Goal Programming model. Another goal to be achieved is to reduce inventory costs and also get profit from sales so that the Weighted method is used here because each target has a different importance weight. The amount of the estimated cost of inventory due to forecast in 2020 will decrease from Rp. 8,130,505,919 to around Rp. 4,589,859,000. Sales profit is obtained with an income of Rp. 379,942,200.</description><identifier>ISSN: 0094-243X</identifier><identifier>EISSN: 1551-7616</identifier><identifier>DOI: 10.1063/5.0125475</identifier><identifier>CODEN: APCPCS</identifier><language>eng</language><publisher>Melville: American Institute of Physics</publisher><subject>Forecasting ; Goal programming ; Inventory ; Mathematical models ; Problem solving ; Production planning ; Sales ; Smoothing</subject><ispartof>AIP conference proceedings, 2022-12, Vol.2575 (1)</ispartof><rights>Author(s)</rights><rights>2022 Author(s). Published by AIP Publishing.</rights><lds50>peer_reviewed</lds50><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://pubs.aip.org/acp/article-lookup/doi/10.1063/5.0125475$$EHTML$$P50$$Gscitation$$H</linktohtml><link.rule.ids>309,310,314,780,784,789,790,794,4512,23930,23931,25140,27924,27925,76384</link.rule.ids></links><search><contributor>Andayani, Sri</contributor><contributor>Sahid</contributor><contributor>Wutsqa, Dhoriva Urwatul</contributor><contributor>Hartono</contributor><contributor>Retnowati, Endah</contributor><contributor>Kismiantini</contributor><contributor>Retnawati, Heri</contributor><contributor>Somerkoski, Brita</contributor><contributor>Abadi, Agus Maman</contributor><contributor>Sugiman</contributor><contributor>Setyaningrum, Wahyu</contributor><creatorcontrib>Anggera, S. A.</creatorcontrib><creatorcontrib>Lestari, H. P.</creatorcontrib><title>Goal programming problem solving with weighted method and its application to production planning in PT. Pardic Jaya chemicals</title><title>AIP conference proceedings</title><description>The purpose of this study is to solve the problem of production planning to minimize overstock with forecasting methods where the results are used to form a Goal Programming model and solved by the Weighted method. Overstock problems can be solved by using the demand forecasting method by comparing the MAD, MSE, and MFE values of four forecasting methods including the Double Moving Average, Single Exponential Smoothing, Double Exponential Smoothing, and Linear Trend method. Forecasting results we obtained are then used to form the Goal Programming model. Another goal to be achieved is to reduce inventory costs and also get profit from sales so that the Weighted method is used here because each target has a different importance weight. The amount of the estimated cost of inventory due to forecast in 2020 will decrease from Rp. 8,130,505,919 to around Rp. 4,589,859,000. Sales profit is obtained with an income of Rp. 379,942,200.</description><subject>Forecasting</subject><subject>Goal programming</subject><subject>Inventory</subject><subject>Mathematical models</subject><subject>Problem solving</subject><subject>Production planning</subject><subject>Sales</subject><subject>Smoothing</subject><issn>0094-243X</issn><issn>1551-7616</issn><fulltext>true</fulltext><rsrctype>article</rsrctype><creationdate>2022</creationdate><recordtype>article</recordtype><recordid>eNotUMtOwzAQtBBIlMKBP7DEDSll_Y6PqIICqkQPPXCLXMdpXCVOSFxQD_w7Sdu9zI40s49B6J7AjIBkT2IGhAquxAWaECFIoiSRl2gCoHlCOfu6Rjd9vwOgWql0gv4Wjalw2zXbztS1D9ux31Suxn1T_Yz818cS_zq_LaPLce1i2eTYhBz72GPTtpW3Jvom4NiM3nxvj6ytTAij3we8Ws_wynS5t_jDHAy2pasHV9XfoqtiAHd3xilav76s52_J8nPxPn9eJq1ORZIO5RinCsA4VhSc6VTnqRA0J1QXUlBHmQYFxEjJiWbCSc4VbBS3hbCWTdHDaexw3_fe9THbNfsuDBszqngKwAlRg-rxpOqtj8eXsrbztekOGYFsTDcT2Tld9g9B2Gwg</recordid><startdate>20221208</startdate><enddate>20221208</enddate><creator>Anggera, S. A.</creator><creator>Lestari, H. P.</creator><general>American Institute of Physics</general><scope>8FD</scope><scope>H8D</scope><scope>L7M</scope></search><sort><creationdate>20221208</creationdate><title>Goal programming problem solving with weighted method and its application to production planning in PT. Pardic Jaya chemicals</title><author>Anggera, S. A. ; Lestari, H. P.</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-LOGICAL-p985-8888e342700ae3ff43989d8552d129f652e2390701a6641935e64470b74cf5cc3</frbrgroupid><rsrctype>articles</rsrctype><prefilter>articles</prefilter><language>eng</language><creationdate>2022</creationdate><topic>Forecasting</topic><topic>Goal programming</topic><topic>Inventory</topic><topic>Mathematical models</topic><topic>Problem solving</topic><topic>Production planning</topic><topic>Sales</topic><topic>Smoothing</topic><toplevel>peer_reviewed</toplevel><toplevel>online_resources</toplevel><creatorcontrib>Anggera, S. A.</creatorcontrib><creatorcontrib>Lestari, H. P.</creatorcontrib><collection>Technology Research Database</collection><collection>Aerospace Database</collection><collection>Advanced Technologies Database with Aerospace</collection><jtitle>AIP conference proceedings</jtitle></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext</fulltext></delivery><addata><au>Anggera, S. A.</au><au>Lestari, H. P.</au><au>Andayani, Sri</au><au>Sahid</au><au>Wutsqa, Dhoriva Urwatul</au><au>Hartono</au><au>Retnowati, Endah</au><au>Kismiantini</au><au>Retnawati, Heri</au><au>Somerkoski, Brita</au><au>Abadi, Agus Maman</au><au>Sugiman</au><au>Setyaningrum, Wahyu</au><format>journal</format><genre>article</genre><ristype>JOUR</ristype><atitle>Goal programming problem solving with weighted method and its application to production planning in PT. Pardic Jaya chemicals</atitle><jtitle>AIP conference proceedings</jtitle><date>2022-12-08</date><risdate>2022</risdate><volume>2575</volume><issue>1</issue><issn>0094-243X</issn><eissn>1551-7616</eissn><coden>APCPCS</coden><abstract>The purpose of this study is to solve the problem of production planning to minimize overstock with forecasting methods where the results are used to form a Goal Programming model and solved by the Weighted method. Overstock problems can be solved by using the demand forecasting method by comparing the MAD, MSE, and MFE values of four forecasting methods including the Double Moving Average, Single Exponential Smoothing, Double Exponential Smoothing, and Linear Trend method. Forecasting results we obtained are then used to form the Goal Programming model. Another goal to be achieved is to reduce inventory costs and also get profit from sales so that the Weighted method is used here because each target has a different importance weight. The amount of the estimated cost of inventory due to forecast in 2020 will decrease from Rp. 8,130,505,919 to around Rp. 4,589,859,000. Sales profit is obtained with an income of Rp. 379,942,200.</abstract><cop>Melville</cop><pub>American Institute of Physics</pub><doi>10.1063/5.0125475</doi><tpages>9</tpages><oa>free_for_read</oa></addata></record>
fulltext fulltext
identifier ISSN: 0094-243X
ispartof AIP conference proceedings, 2022-12, Vol.2575 (1)
issn 0094-243X
1551-7616
language eng
recordid cdi_proquest_journals_2748004117
source AIP Journals Complete
subjects Forecasting
Goal programming
Inventory
Mathematical models
Problem solving
Production planning
Sales
Smoothing
title Goal programming problem solving with weighted method and its application to production planning in PT. Pardic Jaya chemicals
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-03T14%3A35%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-proquest_scita&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&rft.genre=article&rft.atitle=Goal%20programming%20problem%20solving%20with%20weighted%20method%20and%20its%20application%20to%20production%20planning%20in%20PT.%20Pardic%20Jaya%20chemicals&rft.jtitle=AIP%20conference%20proceedings&rft.au=Anggera,%20S.%20A.&rft.date=2022-12-08&rft.volume=2575&rft.issue=1&rft.issn=0094-243X&rft.eissn=1551-7616&rft.coden=APCPCS&rft_id=info:doi/10.1063/5.0125475&rft_dat=%3Cproquest_scita%3E2748004117%3C/proquest_scita%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_pqid=2748004117&rft_id=info:pmid/&rfr_iscdi=true