Assessing Project Contingency Reserves with the Expected Cost Overrun Risk Measure

AbstractThis paper proposes a coherent risk measure to assess project cost overrun contingency reserves: the project expected cost overrun (ECO). It is shown that the traditional project cost-percentile metric does not qualify as a coherent risk measure and, therefore, that the ECO metric should be...