Analysis on safe thickness of the horizontal separation pillar in the upward horizontal slicing and filling method

In the mines employing the upward horizontal slicing and filling mining method, it is necessary to set up a horizontal separation pillar in the middle transportation section. Too small a separation pillar may cause the roof to fall in the lower stope, damaging the transportation facilities in the mi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:IOP conference series. Earth and environmental science 2021-10, Vol.861 (5), p.52051
Hauptverfasser: Qin, Xiu-Shan, Cao, Hui, Wang, Zhi-Xiu, Zheng, Zhi-Jie
Format: Artikel
Sprache:eng
Schlagworte:
Online-Zugang:Volltext
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!