Integration of Ensemble GoogLeNet and Modified Deep Residual Networks for Short-Term Load Forecasting
Due to the strong volatility of the electrical load and the defect of a time-consuming problem, in addition to overfitting existing in published forecasting methods, short-term electrical demand is difficult to forecast accurately and robustly. Given the excellent capability of weight sharing and fe...
Gespeichert in:
Veröffentlicht in: | Electronics (Basel) 2021-10, Vol.10 (20), p.2455 |
---|---|
Hauptverfasser: | , , |
Format: | Artikel |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!